Post Job Free

Resume

Sign in

Qc Engineer Qa

Location:
Dammam, Eastern, Saudi Arabia
Posted:
October 27, 2023

Contact this candidate

Resume:

Email:waleed**hassan@gmail

.com

Mobile:+966*********

PERSONAL DATA:

Current address: Haradh,KSA

Address :

Calicut,india

Date of Birth: 13/09/1990

Age: : 30 years

Sex: : Male

Religion : ISLAM

Nationality : Indian

Marital Status:Married

Blood Group: AB +ve

Father’s Name:

M.kunhammed koya

PASSPORT DETAILS:

Passport Number: K9847789

Place of Issue :KOZHIKODE

Date of Issue: 13/02/2013

Date of Expiry :12/02/2023

LANGUAGES KNOWN:

English,Hindi,Malayalam,

Tamil, Arabi(r)

WALEED HASSAN A

QA/QC Engineer

OBJECTIVE

To pursue a successful, challenging & exciting career as Mechanical Engineer, while being able to dispense my maximum potential to the benefit of the organization and, at the same time acquiring knowledge on the road to success.

WORK EXPERIENCE

REDA FIRE AND HAZARD CONTROL As Qa/Qc Engineer from July 2016 Till Date

M/s. Bethel Engineering Pvt. LTD. As QA/QC Engineer PROJECTS,

(QA/QC) From July 2012 To February 2016(3 years and 7 months) Reliance industries limited, Jamnagar

Qa/Qc Engineer projects,(Qa/Qc )for the DTA-PCG (J3 Project) For the Fabrication and Erection of Jacketed piping system, Other piping system and related steel structures

A project consulted by LINDE,FLOUR and ENERSUL

Registered Engineer in Saudi Engineering Council with Membership No. 751802.

Saudi Aramco Approved Inspector with Code 1 for Multiple Projects.

Approved from Sabic as Qa/Qc Engineer For Multiple Projects.

CAREER SUMMARY

REDA FIRE AND CONTROL HAZARD

REDA FIRE AND CONTROL HAZARD

REDA FIRE AND CONTROL HAZARD

Contractor name

owner

Position

Project

Date

Technicas Reunidas

Saudi Aramco

QA/QC engineer

Haradh And Hawaiyah Gas Compression Project.

JUNE 2020 to Continue

REDA FIRE AND CONTROL HAZARD

Contractor name

owner

Position

Project

Larsen and Toubro

Saudi Aramco

QA/QC engineer

Replacement of Electrical Equipments at southern

four GOSPS

Date FEBRUARY 2019 to MAY-2020.

REDA FIRE AND CONTROL HAZARD

Contractor name

owner

Position

Project

Date

REDA

YANSAB

QA/QC engineer

yansab fire water deluge project.

March 2018 To February 2019

Contractor name

owner

Position

Project

AL khorayef manufacturing lube oil

Al-khorayef (Castrol)

QA/QC engineer

installation of fire alarm,fire suppression system with vesda,installation of fire pump and fire hydrant network

Date FEBRUARY 2018 to December 2018

REDA FIRE AND CONTROL HAZARD

Contractor name Abdullah falleh Aldossary

owner

Position

Project

Date

cristal

QA/QC engineer

cristal new fire water network project december 2017 to February 2019.

Contractor name

owner

Position

Project

Date

ENPPI

SAUDI ARAMCO

QA/QC engineer

Rehabilation of al muajiz terminal september 2017 to november 2017

Contractor name

owner

Position

Project

Date

REDA FIRE AND CONTROL HAZARD

meedco/Hyundai

SEC

QA/QC engineer

YCNT 380/110/13.8KV SUBSTATION

JULY 2016 To December 2017

ROLES & RESPONSIBILITIES:

To manage and supervise all the work done in an construction site

Material Identifications

Knowledge in ASNT Level II in RT,UT,DPT

P&ID,Isometric and CAD drawings

Visual inspection

maintain the quality of work due to those received drawings

Monitoring & Coordinating of QA/QC activities.

Responsible for the subcontractor contractual and commercial issues.

Preparation and submission of NDT record.

Reviewing and interpretation of Radiographic Film.

Analyzing the quality of each work.

Carrying out the stage inspection like fit-up, dimensional, welding inspection at site.

Routine Surveillance Inspection to Monitor Site Activities Are being Proceeding as per the Approved drawing/Procedure.

Witnessing of pneumatic test/Hydrotest along with client inspector

Monitoring and coordination of QA/QC activities. Underground GRE Piping

Preparation of Inspection and Test Plan, checklist, procedures and review of construction drawing

Material Receiving inspection of all RTRP/FRP Pipes and fittings, Gasket, valves,flanges, bolts & nuts in compliance to material list, mill certificates, test reports and correct material specification

Control of quality for piping fabrication such as fit-up, visual and dimensional inspection conforming to approved for construction drawings.

Responsible for issuance of Non - Conformance Report if any violation and out of standard for piping works.

Conducts quality co-ordination meeting and initiate corrective and preventive action.

Inspection of UG RTR piping spools fabrication, installation and testing. AND Conducting hydrotest for all piping Installed.

Line flushing, air blowing; pressure testing, piping lay-up inspection, valve installation, re-instatement and final inspection for mechanical completion.

Prepare Request for Inspection(RFI) to Project Management Team(PMT) Witnessed, checked, monitor and inspect of hydro test pressure

Prepare Non- Conformance Report (NCR), Preventive Action Request (PAR) and initiate corrective Action for every violation and out of Standard of Construction activities.

Assigned as QC-Piping Inspector for GRE pipes of installation and spool fabric for Fire water line and -Adhesive bonded joint and Lamination joints.

Witnessed and inspection of GRE piping system for Adhesive bonded joints, Lamination joint, Barcole hardness as per ASTM D 2583.

Maintaining the storage conditioning of all fiber glass woven roving 270,360,580 g Adhesive kits, chemicals such as Epoxy resin, Hardener, vinyl Ester Resin etc and intermittent inspection for checking the date for expiry. Valve Seat Test And Shell Test :

Gate valve- Testing of both sides of valve body,shell and seat as per API- 598/SAES-L- 108.

Duties & Responsibility (welding)

Inspection of weld joints preparation, fit-up, dimensional Weld visual inspection.

Preparation of inspection reports. Weld summary And maintain records.

Reviewing of NDT reports and verification of results with requirements of the code and standards Preparation of test packages and punch list as per project performed material inspection to confirm as per project Specification and relevant standards.Preparation and submission of final delivery documents (QP) ACADAMICS:

Course : BE in MECHANICAL ENGINEERING

Institute : Thiruvalluvar College Of Engg And Tech University : Anna University Chennai.

Percentage : 60 %

Year of passing : 2012.

Familiarization training from FUTURE PIPES INDUSTRIES For RTR Pipes And fittings for following joints.

Undergone 5days training program RTR/FRP Pipe in FUTURE PIPE INDUSTRIES at Dammam Industrial city -2, Saudi Arabia.

Knowledge of Glass fibers, Resins and types joints for FRP Pipe

Woven Roving Standard 270 grade, 360grade, 580grade using in FRP Pipe. knowledge in Adhesive joint and Lamination joint,

1. Lamination Joints(Butt Wrap)

2. Adhesive Joints(cementing)

3. Rubber Key Lock joints(RSLJ)

Certificate No: FPI-2018-261