MUHAMMAD AWAIS IKRAM
Electrical Project Engineer
Personal Profile:
Father’s Name: Muhammad Ikram-Ul-Haq
Current Address: Rabigh City, KSA
Iqama Number: 243-***-****
Nationality: Pakistani
Passport Number: DX1326882
Contact Details:
Email: ad0nmm@r.postjobfree.com
Mobile (KSA): +966-**-*******
Awais Ikram
Seeking a progressive career with a dynamic and competitive organization, where a blend of my acquired skills and education will be utilized on challenging assignments in a creative atmosphere, resulting a success & and contribution towards the organization’s goals.
Bachelor of Science in Electrical Engineering
University of Management and Technology – Lahore, Pakistan Professional Membership:
PEC (Pakistan Engineering Council) - Membership No. ELECT/43824
SCE (Saudi Council of Engineers)- Membership No: 324976 Professional Experience:
Company: MANSOUR AL MOSAID
Project: HVAC System Upgradation
Client: Petro Rabigh
Duration: March 2023 to present
Company: MANSOUR AL MOSAID
Project: Rectification of Substation-232 during Shutdown 2022 Removed the sand from the cable cellar under substation 232 to expose all existing Cables for Power, Control, and signal.
Objective:
Educational Profile:
Page 2 of 5
Secured all materials such as Splicing kits, Termination kits, Cable ladders, and cable trays. Cut the damaged cables and replaced them with new ones up to the splicing area. Installed all new cables in cable ladders inside the cable cellar room. Rearranged all low and medium-voltage cables according to Saudi Aramco standards and International best practices.
Splicing, termination, and testing of low and medium-voltage cables, as well as control cables According to Aramco standards. All activities to be supervised by a third-party quality Inspector approved by Saudi Aramco.
Proper documentation of all activities performed during the Turnaround schedule through RFI's and submission to the client upon project completion. Client: Petro Rabigh
Duration: Jan 2022 to Feb 2023
Company: MANSOUR AL MOSAID
Project: Laying, Splicing, Termination, ODF & Closure installation of Fiber Optic Cable from WP-501 building TO WR-617 building (30 KM) & 22 SUBSTAIONS to connect with Power System Automation. Client: Petro Rabigh
Duration: Jan 2021 to Dec 2021
Company: MANSOUR AL MOSAID
Project: New ID building project (To connect new building with existing building). Laying, Termination, Splicing, Testing, and commissioning for power and Fiber Optic Cable.
Client: Petro Rabigh
Duration: Jan 2020 to Dec 2020
Company: MANSOUR AL MOSAID
Project: Renovation of IT Data center building (communication building) in Petro Rabigh.
Client: Petro Rabigh
Duration: Feb 2019 Dec 2019
Company: MANSOUR AL MOSAID
Project: Installation of 110kv underground cables for GVC S/S in Makkah. Client: Saudi Electricity Company (SEC)
Duration: May 2018 to Jan 2019
Company: MANSOUR AL MOSAID
Page 3 of 5
Project: Installation of 13.8 & 33kv overhead lines Six side flood protection foundation.
Single circuit line (33KV)
Double circuit line (33KV)
Lighting Arresters, Auto Recloser, Sectionlizer
PMTs of 100,200,300,500 KVA
Erection of LT and HT poles And Stringing of LV Conductors Client: Saudi Electricity Company
Duration: March 2017 April 2018
WORKING EXPERIENCE IN PAKISTAN (2012 to 2017)
Company: Mobilink
Project: Worked as Network Engineer
Assist with Transport Planning in the operations department. Assist in maintaining network services.
Assist in verifying different devices and networks. Duration: 1 Jan 2016 to Feb 2017
Worked: As an Assistant Lecturer at Rahim Yar Khan Technology College to Associative Engineering Students.
College: Rahim Yar Khan Technology College.
Duration: 1 Jan 2012 to Dec 2015
Job Responsibilities as Project Engineer
Check the quality of works to ensure compliance with quality management plan, method statement, and approved
drawings.
Carry out all site activities in accordance with the safety regulations and environmental measures to prevent any accident or injury and supervise timely coordination with the safety office to maintain.
Safe working environment.
Complete execution of EPC project.
I have great experience procuring project materials and communicating with global suppliers.
Coordination with the site engineer other supervisors, and foremen regarding the sequence of work on-site to prevent any conflict between activities.
Understanding and implementing designs from technical drawings.
Planning of project with design team.
Page 4 of 5
Monitoring of all the sites under my area of responsibilities.
Documents control and maintenance for all sites.
Supervising all the warehouses activities and record maintaining.
Monitoring and processing all the materials requests from field teams.
Making BOQ’s and invoices for each sites.
Interacting with contractors and customers using verbal and written communication.
Making presentations to clients and coworkers.
Attending company meetings.
Creating product documentation and record.
Preparing cost estimates for customers and other employees
Inspecting electrical components during and after the product installation.
Testing electronics for problems and proposing solutions
Preparation of all required documents related to project execution.
Project Execution plan
Job safety analysis (JSA)
Method of statement (MOS)
Internship Experience:
HUAWEI 4 Weeks
ASHRAF SUGER MILL 4 Weeks
Final Year Project:
Case Study on: “Intelligence wheelchair by keypad control” Personal Attributes:
Strong analytical and Problem-solving skills
Ambitious and fully committed to work
Acquiring Well-groomed leadership qualities
Well versed in communication and interpersonal skills Page 5 of 5
Iqama Status:
Transferable
Driving License:
Valid