Post Job Free

Resume

Sign in

Electrical Engineering Senior

Location:
Libreville, Estuaire, Gabon
Salary:
6000usd
Posted:
October 23, 2023

Contact this candidate

Resume:

Adityo Agung Bramanto, ST

Senior Electrical Manager at Olam Gabon Mouila, Gabon

+62-813******** ad0kws@r.postjobfree.com 41 years old Jakarta Raya, Indonesia 11750

+241-********

Experience

Date of Birth

16 years

June 8th, 1982

Education

National Institute of Sciences and Technology

Bachelor's, Electrical Engineering

Nationality

Indonesia

Address

Jl. H. Sanusi RT 005/013 No. 41 Durikosambi, Cengkareng

Jakarta Barat Indonesia 11750

Dear Sir or Madam,

I interested to apply for post relevant with my educational background that I shall be obligated if you kindly give me an opportunity to join with your company. Please find enclosed my CV for your consideration. I believe the knowledge and skills built up during this time make me the right/perfect candidate for the role.

I am confident that I can bring this level of success with me to your organization and build upon their reputation. With my previous experience and expertise, I believe my contribution will have an immediate impact on the business.

I hope my classification will meet your companies’ plans and goals and how I might its continued success. I highly appreciated if you could grant me on interview at any time that you find my convenient.

Your Faithfully,

(Adityo Agung Bramanto. ST)

Experience

May 2023 - Present

Jan 2020 – April 2023

Sep 2018 – Nov 2019

Senior Electrical Manager

Olam International Mouila, Gabon – Central Africa

Main Responsibility:

1.Optimizes engineering performance by contributing engineering recommendations to strategic planning and reviews; preparing and completing action plans; implementing production, productivity, quality, and customer-service standard goals; resolving engineering issues; completing audits; identifying trends; determining system improvements; and implementing change.

2.Manage product category to maximize profitability and ROI

3.Responsible for allocation, budgeting, resource planning, and scheduling within the Electrical Engineering Department.

4.Optimal electrical system operational efficiency by developing and maintaining electrical systems.

5.Develops strategic electrical plans by studying operational plans and existing conditions, determining needs to accomplish operational plans, mapping solutions, updating and modifying requirements and solutions, and preparing cost estimates and budgets.

6.Plans electrical projects by determining specifications, selecting contractors, establishing installation schedules, planning shut-downs and installations, integrating architectural and mechanical design specifications, verifying code requirements, and updating cost estimates.

7.Maintains electrical systems by establishing and enforcing ongoing maintenance schedules and procedures and testing programs, scheduling repairs, and coordinating shut-downs and installations.

8.Maintains safe and healthy work environment by establishing, following, and enforcing standards and procedures, and complying with legal regulations.

9.Accomplishes engineering and organization mission by collaborating with other members of senior management.

10.Manages vendor and subcontractor relationships.

Engineering Area Head

SAMPOERNA KAYOE Jakarta, Indonesia

Project Name Phoenix Project

Main Responsibility:

1.Manage, organize and prepare material take off, construction drawings, specifications, materials, procedures and criteria. Equipment and others electrical commonly used as Transformer, MV Panel, LV Panel Lighting Panel, Battery and UPS.

2.Gather approved required documents and information to support the successful completion of relevant construction activities/requirements.

3.Monitor, lead, and mentor less experienced engineers in the development of specifications, including the development of utility systems (e.g. steam generation / distribution systems, water supply / treating, fuel systems, compressed air systems, safety systems, power generation, overall utility master planning)

4.Provide technical stewardship of engineering contractor’s work during front end engineering and design (FEED) or detailed engineering to ensure consistency with Sampoerna Kayoe methods and guidelines, project specifications and owner’s requirements.

5.Responsibilities include OEM engineering assessments, engineering design, troubleshooting, root cause failure analysis & solutions and long-term equipment improvement initiatives, such as all Electrical Equipment and other Utility System.

6.Implementing and sustaining reliability centered on Pre-Commissioning, Commissioning and Operations processes and systems including: Process engineering, planning and scheduling, materials management, and change management.

7.Support operations in the areas of troubleshooting of complex electrical problems, selection, revamp and retrofit of existing equipment, identification of repairs needed, selection of overhaul procedures, condition monitoring, and interface with/or selection of vendors.

8.Comply with project management, Operational (QA), Environmental and Health and Safety procedures.

9.Maintain awareness of the performance of projects against agreed project plans and budgets, at a level appropriate to role. To achieve production safety and OEM standardization.

10.Conduct Plant Electrical Integrity Audits to ensure sustained safety and reliability of the electrical installation.

Construction Superintendent

PT. INTI KARYA PERSADA TEKNIK (IKPT) Jakarta, Indonesia

Project Name Suban Compression Project

Costumer Name ConocoPhillips (Gressik) Ltd

May 2017 – Sept 2018

Main Responsibility:

1.Schedule clients, subcontractors, and vendors in critical path to ensure timely completion.

2.Perform quality control duties and responsibilities regarding the work being performed.

3.Gather approved required documents and information to support the successful completion of relevant construction activities/requirements.

4.Ensure that subcontractor is fully executing and complying with his contracted scope of work.

5.Undertake to monitor the progress of works and highlight issues to the contractor, client and/or (internal or external).

6.Identify subcontractor non-compliance with safety, health, and environmental quality standards.

7.Identify conflicts in construction progress and communicate them to project team for resolution.

8.Maintain daily log (written) of activities on the jobsite.

9.Implementing and sustaining reliability centered on Pre-Commissioning, Commissioning and Operations processes and systems including: Process engineering, planning and scheduling, materials management, and change management.

10.Ensure subcontractor has corrected all deficiencies identified by project team.

11.Walk all units on project daily to monitor activities and assist in future planning.

12.Preside over weekly Client and Subcontractor meetings designed to coordinate the work.

13.Issue notices of non-compliance to subcontractors in regards to quality of work or scheduling.

14.Ensure that the job site is always kept in a clean and organized manner.

15.Perform job progress and completion punch list identification and completion.

Electrical Engineer

PT. INTI KARYA PERSADA TEKNIK (IKPT) Jakarta, Indonesia

Project Name Construction of Jakarta Mass Rapid Transit Project

Costumer Name MRT Jakarta

Main Responsibility:

1.Organize and prepare construction drawings, specifications, procedures and criteria.

2.Supervise and co-ordinate input from other disciplines and specialisms as required the production of technical drawings, check output and optimize selection of material / component in term technically and quality.

3.Gather approved required documents and information to support the successful completion of relevant construction activities/requirements.

4.Undertake site visits to monitor the progress of works and highlight issues to the contractor, client and/or (internal or external).

5.Correspond with external third parties (eg clients, contractors, architects and/or manufacturers) regarding information and technical queries.

6.Responsible for testing and acceptance of work performed by the subcontractor and vendor.

7.Implementing and sustaining reliability centered on Pre-Commissioning, Commissioning and Operations processes and systems including: Process engineering, planning and scheduling, materials management, and change management.

8.Support operations in the areas of troubleshooting of complex electrical problems, selection, revamp and retrofit of existing equipment, identification of repairs needed, selection of overhaul procedures, condition monitoring, and interface with/or selection of vendors.

9.Comply with project management, Operational (QA), Environmental and Health and Safety procedures.

10.Maintain awareness of the performance of projects against agreed project plans and budgets, at a level appropriate to role.

11.Conduct Plant Electrical Integrity Audits to ensure sustained safety and reliability of the electrical installation.

Sept 2016 – May 2017

Site Engineer

RJE Global Pty Ltd Adelaide, Australia

Project Name Project MPP Jungkat Pontianak, Kalimantan Barat

Costumer Name PLN Batam

Main Responsibility:

1.Supervise and co-ordinate input from other disciplines and specialisms as required the production of technical drawings, check output and optimize selection of material / component in term technically and quality.

2.Gather approved required documents and information to support the successful completion of relevant construction activities/requirements.

3.Undertake site visits to monitor the progress of works and highlight issues to the contractor, client and/or (internal or external).

4.Responsible for testing and acceptance of work performed by the subcontractor and vendor.

5.Implementing and sustaining reliability centered on Pre-Commissioning, Commissioning and Operations processes and systems including: Process engineering, planning and scheduling, materials management, and change management.

6.Support operations in the areas of troubleshooting of complex system problems, selection, revamp and retrofit of existing equipment, identification of repairs needed, selection of overhaul procedures, condition monitoring, and interface with/or selection of vendors.

7.Conduct Plant System Integrity Audits to ensure sustained safety and reliability of the System installation.

Dec 2015 – Aug 2016

Electrical and Instrumentation Area Coordinator

PT. ELTRAN INDONESIA Jakarta, Indonesia

Project Name Project Infrastructures CNG – SPBG Online Station

Costumer Name Ditjen Migas – PT. Pertamina (Persero)

Main Responsibility:

1.Organize and prepare construction drawings, specifications, procedures and criteria.

2.Supervise and co-ordinate input from other disciplines and specialisms as required the production of technical drawings, check output and optimize selection of material / component in term technically, price and quality.

3.Gather approved required documents and information to support the successful completion of relevant construction activities/requirements.

4.Undertake site visits to monitor the progress of works and highlight issues to the contractor, client and/or (internal or external).

5.Correspond with external third parties (eg clients, contractors, architects and/or manufacturers) regarding information and technical queries.

6.Responsible for testing and acceptance of work performed by the subcontractor and vendor.

7.Implementing and sustaining reliability centered on Pre-Commissioning, Commissioning and Operations processes and systems including: Process engineering, planning and scheduling, materials management, and change management.

8.Support operations in the areas of troubleshooting of complex electrical problems, selection, revamp and retrofit of existing equipment, identification of repairs needed, selection of overhaul procedures, condition monitoring, and interface with/or selection of vendors.

9.Comply with project management, Operational (QA), Environmental and Health and Safety procedures.

10.Maintain awareness of the performance of projects against agreed project plans and budgets, at a level appropriate to role.

11.Conduct Plant Electrical Integrity Audits to ensure sustained safety and reliability of the electrical installation.

Mar 2014 – Nov 2015

Electrical Construction Engineer II

PT. TRIPATRA ENGINEERS AND CONSTRUCTORS Jakarta, Indonesia

Project Name Senoro Gas Development Project

Costumer Name JOB Pertamina – Medco E&P Tomori Sulawesi

Main Responsibility:

1.Administer and direct all construction activities for assigned projects in order to achieve project goals.

2.Monitor and report subcontractor’s performance in regard to safety, progress, cost, and quality of work.

3.Continually inspect Subcontractor's work to assure that job schedules are maintained and that work is being performed safely, efficiently, and per design specifications.

4.Responsible for testing and acceptance of work performed by the subcontractor.

5.Support operations in the areas of troubleshooting of complex electrical problems, selection, revamp and retrofit of existing equipment, identification of repairs needed, selection of overhaul procedures, condition monitoring, and interface with/or selection of vendors.

6.Identify, develop and / or apply successful practices in electrical design, maintenance, and operation within the associated companies, among peers, competitors and suppliers.

7.In cooperation with Project Managers, authorizes and makes necessary field changes.

8.Constantly vigilant to ensure that quantity and quality of materials, equipment, and contract labor meet Client specifications.

9.Maintains close liaison and check on subcontractors to make sure that they fully understand the scope of the work and to keep claims for extra compensation down to a minimum.

10.Conduct failure analysis, problem solving and complex system evaluation of major electrical equipment problems. Analysis and solution extend into other technologies as well as unit operation and/or maintenance.

11.Participates in subcontractor related incident investigations and corrective action follow-up.

12.Make and troubleshoot during testing and commissioning based on design changes.

13.Conduct Plant Electrical Integrity Audits to ensure sustained safety and reliability of the electrical installation.

Jul 2011 - Feb 2014

Assistant Project Manager

PT. RIZQUNA ENERGY PERSADA Jakarta, Indonesia

Project Name Renewable Energy for Green Environment Sites

Costumer Name HCPT (Provider Telecommunication 3)

Main responsibility:

1.Take a controlling about cost project that included implementation cost, survey cost, delivery cost and another cost that conducted on implementation. Controlling income and outcome cost based on project budget. Controlling material need such as accessories to be installed on fields.

2.Work with project stakeholders to complete project charter outlining scope, goals, deliverables, required resources, budget and timing.

3.Creating a project plan how to make a schedule from customized materials from overseas to come in Indonesia. Make a schedule plan how long does the installation finished for 102 sites. And monitoring the time frame of schedule that has been fixed with costumer within limited time.

4.Effectively manage project scope by ensuring any changes to scope are documented according to the change request process.

5.Receipt reporting from Supervisor to make a report to the costumer and Project Manager. The reporting contain the time frame and cost incurred in implementation.

6.Reporting progress control to costumer and stake holder to clarify how much costs that incurred during the project schedule.

7.Work with Delivery/Technical Managers to complete work breakdown structure to estimate effort required for each task.

8.Make interface with all division such as sales, logistic, procurement, and finance department. Also for the third company such as subcontractor and client also costumer.

9.Track and report on project milestones and provide status reports to management.

10.Ensure all project documents are safely archived following project completion.

Jul 2009 - Jul 2011

Project Engineer

PT. SURYAJAYA TEKNOTAMA Jakarta, Indonesia

Project Name NTS Project

Costumer Name Huawei

Main Responsibilities:

1.Responsible for the design and execution of the electrical, instrumentation, & controls system requirements for standard and custom projects.

2.Communicate with electrical engineer on system requirements including design specifications & equipment procurement, manufacturing, and delivery schedules

3.To source for electrical related components, parts and suppliers according to customer and project specifications and current standards.

4.To assist to monitor on electrical / controls sub-contractors (as required) or start-up personnel to deliver the electrical, instrumentation, & controls portion of turn-key projects on schedule

5.To assist manage electrical suppliers and sub-contractors for their scope of works, schedules and monitoring performance of sub-contractor to complete system or equipment installation works.

6.Assist to provide electrical schematics and operations documentation for equipment.

7.Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards

8.To record, implement and check all electrical design changes during the project and follow up.

9.To implement lessons learned in upcoming projects and follow up.

10.Excellent knowledge of the relevant current standards, regulations and methods including state of technology relating to electrical and electronic industries.

11.To implement best practices throughout the project sites and participate in discussions with the teams for effective management and utilization of constrained resources.

12.To assist in project installation, start-up, and testing support relating to electrical field.

13.Ensuring adequate quality assurance of all deliverables in relation electrical aspects.

Jun 2007 - Jul 2009

Engineering Staff

PT. SURYAJAYA TEKNOTAMA Jakarta, Indonesia

Project Name Implementation and Service Management

Costumer Name Excelcomindo (Provider Telecommunication XL)

Main Responsibilities:

1.Discuss/coordinate activities and make working arrangements with the Service Operation Manager.

2.Analyse drawings, technical data, equipment and assembly specifications, operating manuals and maintenance and measurement reports.

3.Determine operating status and/ or probably cause of malfunction of equipment or parts thereof.

4.Consult with Project Manager and Service Operation Manager to determine method of conducting maintenance and/ or repair, sequence of operations, tools and spare parts plus materials needed.

5.Perform inspections and measurements on board of customers’ equipment and register data on working performance.

6.Coordinate, supervise, lead and provide on-site/ on board assistance to subcontractors and co-workers assigned to the project or job to ensure compliance with project or job specifications and company’s standards and procedures.

7.Establish and maintain a good business relationship with site and ship crew members, subcontractors and customers.

8.Liaise with Costumer/ Client specialists to resolve problems that occur during installation, maintenance, overhaul or repair, if needed.

9.Carry out tests on and start-up of newly installed and/ or repaired equipment, if required.

10.Prepare and submit status reports to all involved parties.

11.Analyse and submit input for improvements on product and application engineering.

12.Pass on new sales leads to Sales and Service Operation Manager.

Education

2007

National Institute of Sciences and Technology

Bachelor's Degree in Engineering (Electrical) Indonesia

Major

Electrical

Languages

Proficiency level: 0 - Poor, 10 – Excellent

Language

Spoken Written Relevant Certificates

English

7 8 -

About Me

Gender

Male

Mobile Number

+62-813********

Address

Jl. H. Sanusi Gg. Pilot RT 5/13 No. 41 Kel. Duri Kosambi Kec. Cengkareng Jakarta Barat, DKI Jakarta, Indonesia 11750



Contact this candidate