Post Job Free

Resume

Sign in

Welding Inspector Raw Material

Location:
Iran, Tehran, Iran
Salary:
optional
Posted:
October 23, 2023

Contact this candidate

Resume:

Curriculum Vitae

Page*of *

FULL NAME: (FAMILY NAME LAST) Ehsanolleh Fatemi DATE OF BIRTH: 1960

CONTACT ADDRESS:

Iran .Tehran

Marital Status : Married Military: passed

Education: Associate Metallurgy

Welding engineering.

B.Eng. Mechanical

Science & technology

university

Parsdis University of Science

Technology.

CONTACT TELEPHONE: Mobile 0098-910-***-**** NATIONALITY: Iranian CONTACT E MAIL:

ad0kf6@r.postjobfree.com

NATIONAL IDENTITY NUMBER : 460

QUALIFICATIONS HELD:

SUBJECT AND NAME/LOCATION

OF EXAMINING BODY AND

VENUE

Cswip 3.1 TWI

Ultrasonic Examination(ASNT )

Liquid penetrate

Magnetic Particle

Radiography interpretation

Basic Safety Course

Radiography Italy Istituo

LEVEL

II

II

II

II

II

II

II

END OF

COURSE

ASSESMENT

PASS/FAIL/N

ONE

Passed

Passed

Passed

Passed

Passed

Passed

COURSE

DURATION

1 week

3 week

3 week

1 week

1 week

2 week

FULL OR

PART TIME

Full time

Full time

Full time

Full time

Full time

Full time

QC &CONSTRUCTION EXPERIENCE

Familiar with all construction activities related to well head& production platform and jackets.

Reviewed the WPS &PQR for welding of structure and piping.

Familiar with sequences of piping and fabrication for well head and production platform as below: Piping fabrication:

Familiarity with standards

Interpretation of radiograph for following job: Pressure vessels, piping, pipe line, offshore structure and familiar with AWS, ASME Section VIII, AWS, and API 1104.)(API 650) storage tank

Ultrasonic test for flaw detection of welded joints between pipes and plates about structural members and T, K, Y joints.

API RP2X, AWS.

Welding and piping inspection according to ASME B31.3.& structures AWS D.D.1

Welder qualification and welding procedure according to ASME section IX.& AWS

Familiar with Raw Material Inspection

Page2of 2

EMPLOYEMENT DETAILS:

JOB TITLE

(POSITION

HELD)

Senior inspector

Q.C

Q.C expert

Q.C coordinator

Phase 12

offshore

Q.C inspector

South pars

Phases 6,7 & 8

project

Q.C inspector

South pars

Phases 6,7 & 8

project

Welding

inspector &

N.D.T Inspector

South pars gas

filed phase 1

Living quarter

plate form.

NDT supervisor

& coordinator

South pars gas

filed phase 2&3

production plate

form

NDT supervisor

& coordinator

Bushehr

nuclear power

plant

NDT supervisor

& coordinator

Arak refinery &

petrochemical

Radiographer

supervisor

Mobarkeh steel

complex

FROM - TO

(YEAR&

MONTH)

2015 up to now

2014 up 2015

2010 up 2014

Feb 2002 up

to 2010

May 2001

to Feb 2002

Jun 1999

to Mar 2001

1996 to 1999

1993 to1996

1986 to 1993

SPECIFIC DUTIES UNDERTAKEN

Reviewed documents & inspected q.c activities

Inspection of welds piping structure daily welds

visual . Inspection of material

Inspection.

Piping line checked according ISO

Radiography interpretation, witness ultrasonic

activities

Approved welder according cods piping &structures

procedures and project specification:

reviewed piping test package

Witnessing the welder qualification and approved the Welder qualification certificates

Inspection of welds piping structure daily welds

visual

Inspection.

Piping line checked according ISO

Radiography interpretation, witness ultrasonic

activities

Approved welder according cods piping &structures

procedures and project specification:

reviewed piping test package

Witnessing the welder qualification and approved the Welder qualification certificates

To checked the repair rate and investigation the

reason of

defects and all standard deviation that is reported from

Welding qc

To witness all activities about running the PQR and check the all essential variables according

To standard and project specification.

To Check the fit up, location and length of Tack

welds before starting the welding.

Welding inspection and NDT inspection structure

and

Piping.

Approved welder according cods piping & structures Procedures and project specification.

Radiography interpretation, witness ultrasonic

activities

Radiography film interpretation.

According cods AWS D.1.1 & ASME B31.3 and

Project specification.

Radiography film interpretation according DIN

5411&54109

Radiography film interpretation according API 1104

& API 650 for storage tank

VERIFIED

BY

Sarvak

Azar.co

PetroPars

PetroPars

Stat oil&

PetroPars

PetroPars

Kavoshyar

Kavoshyar

Kavoshyar

Kavoshyar



Contact this candidate