CURRICULUM VITAE
ABU GHAZANFER ALI KHAN
Present Address Permanent Address
Luqta street Villa- Pakri barawan
Old Gharafa P.o- Pakri barawan
Doha - QATAR NAWADA
Mobile No. +974-******** INDIA
Email ID:*************@*****.*** WhatsApp no+974-******** Professional Synopsis:
B.E in Mechanical Engineering with over 15 years Exp., ISO 9001:2015 Lead Auditor, Mechanical Q A /Q C E n g in e e r /Inspector with having infrastructure (including 5 stars hotel & high-rise buildings),oil& gas building construction overseas experiences. Career Objective:
To secure a challenging position in a reputed organization, where my capabilities can be exploited for growth of organization and ample opportunity for career development.
To use the knowledge and skills acquired, to learn and adopt new and emerging technologies.
Always aiming to achieve goals.
Use my knowledge to the best of my ability & enhance the production of organization.
To elevate myself to higher position in an organization that can further extract and unfold my innovative creative skills, challenging career, utilize my expertise effectively for mutual growth.
Perform the duty of QC related to deliver every project at its highest standard by assuring maximum reliability.
Additional Certifications:
Lead Auditor (ISO 9001:2015 QMS Certificate No-10711. Certified international facility management association from Othm qualification (U.K) certified professional certificate for facility management. (QATAR) Computer Proficiency:
Auto cad Passed in Aug- 2005 Sun Computers
and Technologies
Allahabad
Knowledge on Solid edge,
MS office
Proficient in the use of Computers (Operating Systems): XP Professional, Windows Vista, Windows-7 including MS Excel, MS word, Power Point, solid works, Micro station. Working Experience: Abroad
Period : March 2023 to SEP 2023.
Employer : BARQ
Project : AL-MAJID (Residential Building).Qatar Lusail Position : MEP QA/ QC Engineer/ Inspector.
Period : Aug 2021 to Feb 2023
Employer : Trags Engineering
Project : Dukhan Air Base (commercial building).
(Dukhan Qatar) Project No- C-108-1
Position : MEP Site Engineer.
Period : June 2020 to July 2021.
Employer : Med Gulf Engineering, Qatar
Project : QATAR ENERGY BUILDING.(MEP FITOUT WORKS)
Position : Mechanical QA/ QC Inspector.
Period : June 2019 to May 2020.
Employer : Trags Engineering, Qatar
Project : QATAR ENERGY BUILDING. (MEP FITOUT WORKS)
Position : Mechanical QA/ QC Inspector.
Period : Mar 2017 to Mar 2019
Employer : GS ENGINEERING & CONSTRUCTION.
Project : New Water Center (North Kuwait, Shabriya) Position : MEP QA/ QC Inspector
Period : Dec 2011 to Jan 2016
Employer : AL OSAIS CONTRACTING
Project : SATORP (Saudi Aramco Total Oil Refinery Project.) Package # 7 Position : MECHANICAL QA/ QC Inspector
Period : Aug 2008 to Oct. 2011
Employer : JUMA AL MAJID GROUP Electromechanical Contracting Division, Dubai (U.A.E) Project : Burj Dubai Development-The Dubai Mall Hotel from EMAAR Properties, PJSC Dubai (LG+LGM+GF+43F+Roof)
Position : HVAC SITE SUPERVISOR CUM QC INSPECTOR
Work Experience in India
Period of Project : 03.01.2008 to 30.07.2008
Employer : AIR FAB LTD.
Duties & Responsibilities: -
Reading and understanding the package contract documents, details drawings, project specification and health & safety measures.
Good knowledge in basic design, Mechanical methodologies and installation processes and procedures.
Review inspection and test plans, inspection checklists and work instructions in accordance with project requirement and ISO 9001:2015 Quality System.
Monitoring conformance to quality.
Supervision of ongoing site activities in accordance with Project Specification and applicable standards.
Follow up and implement any site instructions made by the leader.
Prepare and review of Method Statement (MS) and Inspection Test Plan (ITP).
Prepare and review the documents for QC activities and test packages, update all package with recent revised drawings.
Review and analyze all Mechanical (HVAC, Plumbing & Fire Fighting System) drawings, materials, schedules/program of works etc.
Ensure site personnel follow the Quality Assurance System and assist in target of site personal in QA/QC System.
Supervise and monitor the day-to-day quality activities of the main contractor and sub-contractor.
Ensure that all inspection and test are recorded on the proper format. Or checklist as indicated on the refer ITP and that all document is filed in a safe and secure manner.
Supervision and inspection of fire water / Potable water / Irrigation water pipe.
Preparation of Red Markup drawings as per the site installation.
Review and audits subcontractor generated quality records.
Prepares daily records and reports and final acceptance documents when required.
Identifying the materials as per standards drawing & specification.
Receiving visual inspection of all mechanical materials as per purchase order / packing list / delivery note / shipping documents.
Supervision and inspection during the installation of Plenum Box, Grills, Diffusers, Fire Damper, and Volume control damper, Linear Slot Diffusers, Access panel, Cross talk attenuator.
Co-ordinate and assist during pre-commissioning and commissioning activities.
Review corrective actions recommended in Non-conformance reports, initiate and verify corrective action to prevent occurrence on non-conformity.
Implement the proper quality plan, QC Procedure, and Inspection Test Plan.
Inspecting the construction of temporary and permanent works to ensure compliance with the contract documents and approved shop drawings and submittals.
Prepare daily logs and reports, maintain records of inspections made, test performed, work executed, etc.
Performing all works in accordance with the Project Quality Plan.
Visual inspection of the entire chilled water system, including pipes, fittings, valves, insulation, and supports.
Verify that all materials used in the chilled water system, including pipes, fittings, and insulation, match the specifications and quality requirements.
Working as a QC Inspector to carry out all site MEP inspections.
Witnessing of Mechanical tests like Hydro Test, Gravity Test, Pull out Test, Duct Leak Test etc.
Witnessing of Electrical tests like Grounding Test, Continuity Test, Megger Test etc.,
To make inspection for Installation of OTE Ducts, HVAC Ducts, Fire rated Ducts as per IFC drawings.
Making sure that Subcontractor is working as per clients approved QAP, ITP and MS.
Performing inspection for installation of Dewatering pumps, Chilled water pumps etc.
Performing inspection for installation of Chillers, AHUs, ACCU, Crac, Cooling Tower units, FCUs etc.
Coordinate with construction, testing group and QC department in the preparation of the requirements of each test pack for Hydro testing and facilitate close out of any outstanding punch items before and after hydro test.
Make sure that activities at job site should be done in accordance with standard codes of practice, drawings, applicable job specifications, Quality control procedures (QCP), and Inspection and Test plan (ITP) and Method statements.
Inspection and supervision of Copper Brazing Pipe for HVAC System & Plumbing system.
Making sure that Subcontractor is working as per clients approved QAP, ITP and MS.
Visiting the laboratory during the peel test and tensile test for copper brazing pipe.
Visiting fabrication factories for inspection of fabricated items required for site.
Follow site safety rules practice and assist site team in promoting a culture of safety on the site.
Performing inspection of all incoming materials and equipment’s.
Conducting inspection / verification and monitoring of procedure material at receiving warehouse and for direct delivery at job site, this includes verification of material discrepancy against purchase order material data sheet marking & identification and if any damages/ shortage initiate D.R/ quantity.
Preparation of handover documents (QRPL-Quality Record Packaging Lists).
To check, inspect and test incoming raw materials instruments to ensure that they meet project contract specification contract requirements
To coordinate with Client Consultant for the verification of process inspection for varies QC activities and signing off all QC documents
To follow and ensure the proper filling system (in accordance to the Organization procedure) with full traceability for retrieving the document.
To undertake verification of Cable Laying (both in Trenches and Cable Tray)
To perform the quality control activities while installation and pre commissioning of High, Medium & Low voltage HVAC Control system, fire alarm system protective relays and Motor Control Centers.
Preparation of Monthly QA/QC Report.
Raising IR, SOR, and NCR based on observations on site.
Supervision of ongoing site activities in accordance with Project Specification and applicable standards.
Review and prepare the documents for QC activities and test packages, update all package with recent revised drawings.
Review and analyze all Mechanical (HVAC, Plumbing & Fire Fighting System) drawings, materials, schedules/program of works etc.
Ensure site personnel follow the Quality Assurance System and assist in target of site personal in QA/QC System.
Ensure that all inspection and test are recorded on the proper format.
Supervision and inspection of fire water / Potable water / Irrigation water pipe.
Preparation of Red Markup drawings as per the site installation.
Prepares daily records and reports and final acceptance documents when required.
Identifying the materials as per standards drawing & specification.
Verifying and ensure the calibration of instruments for Hydro static testing.
Performing inspection for installation of Fire Fighting Pipes, Chilled Water Pipes, PPR Pipes, RTR Pipe.
Receiving visual inspection of all mechanical materials as per purchase order / packing list / delivery note / shipping documents.
Co-ordinate and assist during pre-commissioning and commissioning activities.
Inspecting the construction of temporary and permanent works to ensure compliance with the contract documents and approved shop drawings and submittals.
Supervising the Water & Air balancing of the HVAC System by Handling the Modern & Traditional Water & Air Balancing Equipment’s such as Digital Water Meter, Bolometer, Micro Manometer, Anemometer, U Tube–Manometer, Tachometer, Clamp meter etc.
Preparing daily logs and reports. Maintain records of inspections made, tests performed, work executed, etc.
Implement the proper quality plan, QC Procedure and Inspection Test Plan and coordinate with QA/QC Manager.
Inspection of external fire hydrant & external sewer line & sewer manhole.
Inspection of underground fire water / potable water / irrigation water pipe.
Supervision and inspection during the installation of Storm water Lift Station & Sanitary Lift Station with Submersible Pump.
Reviewing and approving of Installation Method statements / installation procedures.
Details knowledge of construction techniques.
Apply and implement all quality control and quality procedures of the site.
Maintaining records of the contractor's manpower and equipment daily resources.
Undertaking all site supervision and inspections when required or instructed by the Resident engineer (RE) or the Assistant Resident Engineer (ARE).
Performing all works in accordance with the Project Quality Plan.
Initiate the Mechanical Completion Certificate and assist in the Operational and Final Handover of the Building.
Attend weekly progress meetings, update the daily and weekly construction progress reports, and verify contractor's progress statements for accuracy.
Review the project planning and scheduling for projects during the construction phase, identify any construction slippages and assist in optimizing the contractor's resources
Physical inspection and verification of received mechanical materials at site against approved projects samples and specifications.
Follow site safety rules practice and assist site team in promoting a culture of safety on the site.
Familiar with ASME 16.5, ASME B 31.5, ASME B 31.9, ASME SEC IX, UPC and IPC plumbing code.
Familiar with ASME, ASHRAE & DW 144, SMACNA, NFPA code & Standards, NFPA 90A code & SAICS. Declaration:
I hereby declare that all the above information’s are correct to the best of my knowledge, and I have not been deported from any of the countries for misbehavior or misdeeds. I also state that I have not been prospected or convicted by the Government of India nor there is any case pending at any police in India. Date: 24th Mar 2023
Place: Doha – QATAR