Page *
Geronimo D. De Castro Curriculum Vitae
PROFESSIONAL PROFILE
CONTACT DETAILS
Current Address:
Bin Mahmoud Doha Qatar
Home Address:
J.P Rizal St. Brgy. Pob. 4
Tiaong Quezon, Philippines
Email:
***********@*****.***
Mob. No.:
EDUCATIONAL ATTAINMENT
Bachelor of Science in Civil
Engineering
Laguna College City of San
Pablo, Philippines
March 24, 1996
CERTIFICATION
Project Management
Professional (PMP)
Project Management Institute
PMP No.3014590
Grant Date: 04 June 2021
Exp. Date:03 June 2024
Lead Auditor
Global Academy Quality
Management
Global Certified ISO9001:2015
Cert. No. QMS/2020/1020
Issued: 21 Dec. 2020
(Held on 11-15 Dec.2020
Lead Auditor
BSCIC CERTIFICATION PVT. LTD
Quality Management System
Course based on ISO
9001:2008
Cert. No. BTQ/C176/09:0915
Issued: 2 Sept. 2015
(Held on 7-11 Aug. 2015)
An experience, self-motivated, enthusiastic, and competent QA/QC Civil Engineer with a wide range of skills and experience gained over 24 years of related working experience, more than 18 years of solid experience in Middle East (Doha Qatar and Riyadh Saudi Arabia) and 6 years in the Philippines. High level of execution and interpersonal skills to drive quality system handling a large scale of mega projects. High-rise building construction and infrastructure (land development, structural civil works, steel fabrication and erection, precast concrete, architectural finishing works and facade). Client teamwork in resolving issues and coordinating QA/QC objectives Implement and maintain Quality Management System. EMPLOYMENT HISTORY
July 2023 -
Present
IRIS CONSTRUCTION TRADING W.L.L
(Turkey Co.)
CIVIL/ STRUCTURAL QC ENGINEER
OIL AND GAS PROJECT
RLTO Expansion and offplot Facilities of the
Northfield Expansion Project
(EPC-3)
Ptoject Scope Cost: QR 400-600 million
Sulfur Facilities for the Northfield
Expansion (NFXP) Project – EPC4
Ptoject Scope Cost: QR 400-600 million
QATAR GAS
Tecnicas Reunidas
Client
Main Cont.
Main task
· Responsible for all Civil and Structural inspection including all Material Delivery at the site.
· Closely monitor construction works, all steel testing for reinforcement, and concrete, and continuously check material delivered to site, ensure compliance with QA/QC procedures, and ensure that all tests are carried out as per contract requirements.
· Monitor the performance of the construction team during the implementation of the approved plans, inspection and test plan (ITP), method statement, procedures, and schedules, including that of individuals. Identify the development and implementation of activities and methods to improve and support operational objectives.
· Perform routine and non-routine inspections and support other quality personnel
(coordinators and inspectors) in monitoring construction team work execution during the construction phase.
April 2021
June 2023
PORR QATAR CONSTRUCTION W.L.L
(Austrian Co.)
SENIOR QA/QC ENGINEER
Project Cost : QR 48 million
Projects
Undertaken
Construction of Pedestrian Bridge (Phase 1)
Pedestrian Bridge (SL-14)
Pedestrian Bridge (SL-18)
Pedestrian Bridge (SL-56)
Pedestrian Bridge (SL-58)
ASHGHAL
CDM SMITH
Client
Consultant
Page 2
Geronimo D. De Castro Curriculum Vitae
SEMINARS
ASTM Training and E-
Learning Building Sciences
Quality Assurance Past, Present
and Future, Project Qatar
Issued : 30 April 2019
Continuing Professional
Development Real Estate
Development
De-constructed A Project
Qatar Training
Project Qatar CPD Provider
Organization
Issued: 29 April 2019
Quality Assurance and
Quality Control for
Construction Services
Oryx Rotana Hotel, Doha,
Qatar Issued: January 28, 2011
Quantity Surveying
Oryx Rotana, Doha Qatar
Issued: October 15, 2010
Basic Safety Training ( Fire
Fighting )
Manila Philippines
Issued: February 9, 1999
Basic Safety Officer and
Quality Control
Engineering Insurance Analysis
of Policy Condition and Loss
Adjustment
Manila, Philippines
Issued: Sept. 4, 1999
TRAINING
VMT Segment
Documentation
Segment Management
· Module Management
· Concrete Ordering
· Concreting and Demoulding
· Damaged Documentation
· Picture Documentation ·
· Capture and manage
Damage ·
· Block/ Trash Segment
· Segment Stocking
· Storage Administration · ·
· Hardware component
· Segment Delivery
Issued on: 14 Oct. 2014
Main Task
· Responsible for preparing technical submittals such as MST, ITP, MAR, PQN, and PQP in compliance with project specifications and QCS requirements for client representative review and approval.
. Prepare an audit schedule and conduct internal and external quality audits on subcontractors, manufacturers, and material suppliers. Conduct performance assessments to ensure that they are complying with quality requirements.
. Ensure that non-conformities, corrective action requests, complaints, and improvement recommendations from audits and other sources are formally recorded, that progress toward solutions that include preventive measures is made, and that the process is completed in writing.
· Participate notice of meetings and agendas with other trade contractors and client representatives to discuss quality issues, concerns and improvements (NCR, SOR, CAR, MIR, IRE, MAR, PQN, PQP, QCDD Requirements and Handing Over) for the settlement of all non- conformities as stipulated in the project specification.
· Prepare appropriate control logs for tracking the subcontractor's performance and identifying any delayed work so that all necessary efforts and corrective actions can be implemented.
· Lead and participate in the QA/QC Tool Box, Training, Monthly Reports and Lessons Learned, QA/QC Weekly Reports for Open Items and Submittal Tracker, Minutes of Meetings, and Submission of All Test Reports to the Client.
· Ensure all materials received for the project are in compliance with the approved submittal, are maintained properly, and are suitable for use in the project. Then, confirm and document the information.
Jan. 2020
Mar.2021
DAR ALHANDASAH CONSULTANTS
SHAIR & PARTNERS
LEAD QA/QC ENGINEER
Project Cost: QR 7.0 Billion
Projects
Undertaken:
Package BP-12A (Lusail Plaza Tower 1) 4 Basements + Ground + 50 storey building, Estimated GFA is
139,000m, Car park spaces1,599 number, Low rise
commercial buildings surrounding the tower,
Landscaping and external furniture. Package BP-12B
(Lusail Plaza Tower 2) 4/5 Basements + Ground + 50 storey building, Estimated GFA is 139,000m, Car park spaces 1,599/1,999 number, Low rise commercial
buildings surrounding the tower, Landscaping and
external furniture.
Package BP-12C (Lusail Plaza Tower 3) 5 Basements + Lower Ground + Ground + 69 storey building,
Estimated GFA is 172,000m, Car park spaces 2,225
number, Low rise commercial buildings surrounding
the tower, Landscaping and external furniture
Package BP-12D (Lusail Plaza Tower 4) 5 Basements + Lower Ground + Ground + 69 storey building,
Estimated GFA is 172,000m, Car park spaces 1,906
number, Low rise commercial buildings surrounding
the tower, Landscaping and external furniture.
Client LREDC- Lusail Real Estate Development Company Client Rep. QPM -Qatar Project Management
Page 3
Geronimo D. De Castro Curriculum Vitae
BASIC SAFETY TRAINING
Personal Survival Technique
· MO Model Course 1.19
Fire Prevention and Fire
Fighting
· IMO Model Course 1.20
Elementary First Aid
· IMO Model Course 1.13
Personal Safety and Social
Responsibility
Conducted Date:
From: Jan. 29, 2001
To : Feb. 09, 2001
Tunnel Safety Awareness
Fire Safety
Confined Space
Rebreathes
First Aid
Issued on: Sept. 02, 2015
Doha Qatar
VMT Segment
Documentation
SDS key Users
· Segment Management
· Quality Management
· Captured, Manage damage
· Block / Trash Segments
· segment Stacking
· storage Administration
· Manage Segment Deliveries
· User Administration
Issued on: 14 Oct. 2014
Doha Qatar
COMPUTER APPLICATION
Autocad Rel.14 with Color
Microcadd Technologies
Company, Manila, Philippines
June 1999 - August 1999
(70 Hrs.)
Autocad 2002 (Level 1 & 2 )
with Color Rendering
Microcadd Technologies
Company, Manila Philippines
Sept. 2003 – Sept. 2003
(70 Hrs.)
Microsoft Word
Microsoft Excel
Microsoft Power Point
MAIN TASK
· Responsible for managing and performing daily QC responsibilities in all factories (Structural Steel Fabrication, Pre-cast, Façade, Batching Plant & Trial Mix, and other architectural materials) to ensure that the work is completed in accordance with project standards. The role includes oversight and review of the entire documentation and physical inspection.
· Verify and document that all materials received for the project are in conformance with the approved submittal, stored appropriately, and are acceptable for use in the project.
· Provide daily QC reports that highlight activities being built in accordance with each individual project and constructively address non-conformance to deliver the intended result in a timely manner.
· Responsible for all site (Tower 1, 2, 3 & 4) quality control inspection and testing in adherence with contract requirements. Assist the Residence Engineer and Construction Manager in all quality-related issues.
· Monitor the process of steel fabrication and site installation, and verify if all welders are certified. Check that all tests (MPT, LPT, Ultrasonic test, fit up, visual welding dimension and painting) have been completed.
· Conduct an external quality audit of the main contractor, including sub-contractors, manufacturers, and material suppliers.
· Chair and document the weekly QC meeting with the production manager, QC manager, and engineers regarding quality concerns, issues, and improvements.
·
Review of technical submittals such as Prequalification document, method statements and ITP, Material submittals and all test report in compliance with project specifications and QCS requirements.
Mar.2014
Mar.2019
PORR BAU GMBH W.L.L (PSH JV) QATAR
(Austrian Co.)
SENIOR QA/QC ENGINEER
Project Cost: USD 2.25 Billion
Project
Undertaken
Doha Metro Rail Green Line Underground
Construction of The White Palace Station
(Civil Structure & Architectural finishing works
and Hand Over) Transfer level, Base B1 Level,
Platform P1 Level Concourse Level, Roof Level
Ground Level, 1st and 2nd Floor 1-8 Pup Level,
Ground Level + 1st and 2nd Floor Pup ups. Reinstatement, Road works and asphalting
Doha Metro Rail Blue Line Underground
Construction of The Blue Line Station
Underground (Civil Structure and Finishing
Work) Lower Basement, Transfer level,
Intermediate Level, Concourse Level, Roof
Level, Ground Level + 1st and 2nd Floor Pup ups
MLPA-Major Logistic Production Area Construction of Precast Factory
(Structural Steel, Civil Works and Roads ) Fabrication of Precast Segment (Tunnel Ring)
Client Qatar Rail
Client Rep. ASTAD PMC
Hill International PMC
Page 4
Geronimo D. De Castro Curriculum Vitae
PERSONAL PROFILE
Date of Birth : May 11, 1973
Civil Status : Married
Citizenship : Filipino
Religion : Roman
Catholic Passport No :
P2186661B
QID : 273********
Drivers License : Available
ORGANIZATION
PICE - Philippine Institute of
Civil Engineer
PICE - Philippine Institute of
Civil Engineer
OTHER SKILLS
PADI – Dive Master
(Scuba Diving)
Diver No. DM-370559
Cert. Date: 2 Oct. 2015
Inst. No. OWSI-478983
Jonathan F. Almanon
PADI – Rescue Diver
(Scuba Diving)
Diver No. 1507UE5283
Cert. Date: 24 July 2015
Inst. No. OWSI-478983
Jonathan F. Almanon
PADI – Advance Open Water
(Scuba Diving)
Diver No. 1506UC3437
Cert. Date: 11 June 15
Inst. No. OWSI-478983
Jonathan F. Almanon
PADI – Open Water
(Scuba Diving)
Diver No. 1405UD0809
Cert. Date: 24 May 14
Inst. No. OWSI-478983
Jonathan F. Almanon
MAIN TASK
· Responsible for the implementation of Quality Management System (QMS) reviewing all work procedures, method statement, material submittals, site testing and approved shop drawings in compliance with good work practices and delegate the task to the respective QC Engineers, QC inspectors and material and lab engineers.
· Attend a series of meeting and agenda concerning quality issues (NCR, SOR, SCAR-Site Corrective Action Report, CSR- Client Site Construction Report, MIR, IRE Rejection for the closure and settlement of all non-conformities as stipulated in the project specification.
· Responsible for managing and performing the daily QC responsibilities to ensure that all structural fabrication, concreting and architectural finishing is constructed in accordance with project specification that includes, factory visit, material inspection, Site installation and review the entire documentation. Develop training modules for various construction activities.
· Investigate non-conformance in product and site construction, identify the root cause, and develop a corrective action plan to prevent it from occurring again. Analyze test failure trends and NCR information.
· Prepare snag list for architectural and mechanical works, front of house, back of house, amenities, and coordinate to other trade contractor to closed witness by the client representative and Qatar rail prior to handing over of the station.
· In charge of pre-cast factory quality control for tunnel segments and slab tracks (fabrication, delivery, and installation). responsible for all site measurements, weekly reports, and monthly reports, as well as the preparation for handing over requirements such as QCDD requirements, as-built drawings, QC dossier, operation and maintenance manual, spare parts and warranties, closed out of work inspection requests, as well as material inspections and technical submittals from Codes "B" and "C" into Code "A."
Feb.2011
Feb.2014
BOYGUES BATIMENT INTERNATIONAL
Qatar (French Co.)
SENIOR QA/QC ENGINEER
Project Cost: QR 16.8 Billion
Projects
Undertaken
Qatar Petroleum Financial
District / Qatar Energy
(9 Towers) Iconic Project a
700,000 m office complex.
The project consist of 9
Office Towers Ranging
between 16 and 47 Floors
+ 1 5 Basement + 405
Rooms, Five Star Hotel and
Car Park with 5,340 places
and a conference center.
Client Qatar Petroleum Company
Client Rep. ASTAD Project Management
QPM Qatar Project Management
Consultant Keo International Consultants
MAIN TASK
· Responsible in supervising quality control personnel and inspection operation.
· Report issues to the QA/QC manager for non- conforming work or processes. Manage the NCR to ensure it is resolved in a timely manner to the satisfaction of the client in coordination with the construction department.
· Monitor, review and approved Quality Control Documentation progressively compiled during the project to ensure that all activities are recorded and reported as required. Taking care QA/QC documents include certificate, calibration, test results, Inspection request, NCR, CAR, and site Inspection.
Page 5
Geronimo D. De Castro Curriculum Vitae
· Review, work procedure method statement and material submittal in compliance with project requirements and delegate to the quality control personnel on their respective responsibilities.
· Develop, implement and manage the Construction inspection and Test Plan (ITP) for all the temporary and permanent works jointly with the client representative and construction team member.
· Closely monitor construction works, all steel testing for reinforcement and all concrete testing, all concrete precast and structural steel fabrication, and continuously check material delivered to site, ensure compliance with QA/QC procedures, and ensure all tests are carried out as per contract requirements.
· Preparing and conducting regular weekly, bi-weekly and coordination meeting with the construction team, sub-contractor and supplier to monitor and enhance the quality and performance of executed work.
· Monitor the process of steel fabrication and site installation and verify if all welders are certified. Check that all tests (MPT, LPT, Ultrasonic test, fit up, visual welding dimension and painting) have been completed.
· Participate in product Qualification activities by reviewing test protocols and reports to ensure product quality meet the specified requirements.
Dec.2009
Nov.2010
BILFINGER BERGER QATAR (German Co.)
QA/QC ENGINEER
Project cost: QR 4.89 Billion
Project
Undertaken
CONSTRUCTION OF BARWA CITY PHASE 1
Residential Housing Projects will cover a 2.7 million square meter land in Musameer, just outside the
heart of Doha. The development consists of 128
apartment buildings, 6000 flats and 1024 studios.
The houses are classified in three different type: Type A and Type B with up to 7 Floors (G+6) and
Type C with 2 Floors (G + 1st Floor)
Client Barwa Real Estate Company
Client Rep Aecom/ Mounsell
MAIN TASK
· Manage quality control of all precast concrete fabrication for wall, beam, Hollow core and all required reports Measurements, Concreting, damage documentation de-molding, deficiency report, precast storage, trash concrete, concrete repair and Delivery.
· Review all work procedure, method statement and material submittal in compliance with good work practices and delegate task to the respective QC personnel, Material and lab engineers of their respective responsibilities.
· Monitor all the precast installation activities and execution of work and prepare daily and weekly report as per site accomplishment and participate notice of meeting and agenda together with other trade contractor conducted with the owner’s representative.
· Prepare and maintain quality record WIR Status, Cube sampling, Testing Status, Histogram chart, MIR, and concrete delivery, Ensure that the required inspections and test result are carried out and that all quality records are adequately completed and taking care off.
· Ensure that the Non-conformities, corrective action request, complaints, recommendations for improvement from Audits and elsewhere are recorded formally, are progress to solutions that include preventive measures were implemented and are close out in writing.
Page 6
Geronimo D. De Castro Curriculum Vitae
July 2006
Nov. 2009
HIGGS & HILL / INTERBETON (ROYAL BAM INT’L)
(Dutch / British Co.)
SENIOR QA/QC ENGINEER
Project
Undertaken
AL HITMI OFFICE BUILDING (Project Cost: EUR 43
Million) A high quality commercial building
complex is divided into two wings. The East wing
comprises two basements, a ground floor, a
transfer level, six rentable office floors and a roof garden. The west wings also comprise two
basements, a ground floor and a transfer level, but has seven rentable office floors and a roof that is used to house complex’s chillers. The middle area
comprises an Atrium with seven bridges
connection the wings.
AL HITMI RESIDENTIAL BUILDING (Project Cost:
EUR 40 Million) Construction of an eighteen-floor
high quality residential building with 31,500 m
surface area. In first instance plan as a residential building with 84 apartments, the design was
changed during construction into a more luxurious
140 apartment building.
Client:
Client Rep.:
Ali Bin Khalifa Al Hitmi & Co.
NORR Group Consultants International DIWAN
DOHA BANK TOWER NEW HEAD QUARTERS
Construction of 27 storey skysctaper with 3
basement Concrete finished on sub-structure and
super structure.
Doha Bank
Hyder Consulting Middle East
Adil Jaidah & Associates
Client:
Client Rep.:
Client:
RAS LAFFAN FORT EXTENSION (Oil & Gas) (21.5
km Brake Water) Six Construction and Interbeton
JV
(QP) Qatar Petroleum
Page 7
Geronimo D. De Castro Curriculum Vitae
MAIN TASK
· Implement the Project Quality Plan to ensure an effective Quality Management System and Responsible to organize, Implement, conduct and manage the QA/QC program as per the company’s policy and contract specification requirements to the project. Work as a senior QA/QC Engineer give instruction to all inspectors and coordinate all inspections as per PQP and Contract Specs in attainment of quality requirements, liaise with client representative for conducting day to day inspection of the site activities.
· Supervise Structural Steel Fabrication and Inspect all structural steel erection and all welding test (MPT, LPT, Ultrasonic test, IRN-Inspection Release Note, FUR- Fit-up Report, WVT- Weld Visual Report, VDR-Visual & dimensional Report, Painting Report )
· Prepare quality control status register (WIR Status, Cube sampling, Testing Status, Histogram Chart and MIR, Concrete delivery status, Weekly and Monthly status report, )., Ensure that the required inspections and test result are carried out and that all quality records are adequately completed and taking care off.
· Preparing and conducting regular weekly, bi-weekly and coordination meetings with client, Contractors and suppliers to monitor and enhance the quality and performance of executed works.
· Responsible for snagging/ de-snagging and preparation for handing over requirements such as the as built drawings operation and maintenance manuals, warranties, and spare parts and Responsible for preparing handover completion certificates and related closing out documents
April 2005
June 2006
SWAYEH CO. LTD
Kingdom of Saudi Arabia
QA/QC ENGINEER/ PROJECT ENGINEER
Project
Undertaken
AUTO AUCTION YARD Construction of land development with 150 hectares Car Park + 2 Petrol Station + Car Wash Building + Commercial Building 3 Storey. Construction of roads concreting and asphalting
Client: (ADC) Arriyad Development Company
Client Rep.: Zuhair Fayes Partnership
MAIN TASK
· Analyze plan and specification and coordinate to the Design Department with reference to the approved plan for the preparation of field inspection, Conduct site inspection together with the consultant Civil Inspector to check if the actual construction are properly done as per specification and approved plan.
· Prepare all Material Testing and Inspection with (RFI) Request for Inspection, for all Building Structure, Architectural Finishing and Land Development Activity and Prepare testing for backfilling material as well as Barrow and Sand Materials.
· Prepare Land Development compaction testing or Field Density test by using Nuclear Method Test and Sand Cone Test to determine the required Maximum Density as per project specification.
· Prepare Quality Control of Fresh Concrete specifying its Slump Test and Concrete Temperature as per project specification and monitor all concrete delivery by proper coordination with the ready mixed company, and write technical report updating the progress of actual site construction
· Prepare weekly program activity as per Bar Chart Schedule prepare by Planning Engineer, Conduct site inspection and checked if the provided pan were followed and provide instruction to foreman a systematic approach to actual site inspection and implement Safety program and policies.
· Coordinate to the project/site engineer in-charge and prepare daily and weekly report as per site accomplishment and participate notice of meeting together with the Consultant with respect to site condition.
· Arrange all files and documents in properly and orderly manner to obtain easy access and location. Page 8
Geronimo D. De Castro Curriculum Vitae
Dec.2002
Jan. 2005
HUNTER DOUGLAS PHILIPPINES Inc. (Philippines)
PROJECT ENGINEER
Project Cost: P 150 Million
Project
Undertaken
G.T International Tower (Architectural and Finishing Works) G.T Int’l Tower is an office skyscraper located in Makati, Philippines. G.T Stands for George Ty, the building owner and chairman of the Metro Bank
Group. Standing at 217 meters, it is currently the 12th tallest building in the country and Metro Manila as well as with 43 Floors Height 217.2 m/ 713 ft. + 5 Basement
LKG Tower (Architectural and Finishing Works) LKG
Tower (Architectural and Finishing Works) the City. Standing at 180.1 Meters (590.88 Feet), the building has 38th Floors above ground, and 5 basement level for parking. The LKG tower is owned By international
Copra Export Corporation (ICEC), Land Corporation and was Design by Architectural firm Kohn Pedersen Fox Associates.
Project Cost: P110 million
JG SUMMIT TOWER (Architectural and Finishing
Works) JG Summit Center is an office skyscraper
located in the Philippines. It is own by JG Summit Holding Inc., It stands at 174 meters (570.87 Feet) 43/F 3- Basement It is currently the 9th tallest building in the Philippines.
Metro Bank
International Copra Export Corporation (ICEC)
JG Summit Holding Inc. & Robinson Land Corporation. Client:
Designer &
Client Rep.:
GF & Partners Architects and Gozar Planners Philippines Kohn Pedersen Fox Associates
Hellmuth, Obata + Kassabaum (HOK)
Main Task
· Responsible for reviewing and responding to all clarifications, materials and shop drawings submittals in compliance with tender specification and project requirements to ensure the quality of works in accordance with the time frames and mile stones.
· Prepare and analyse reflected ceiling plan, showing the location of Electrical lightning fixtures, HVAC supply and return diffusers, mechanical fixtures as the basis for actual Installation to prevent error in the Implementation of metal and aluminium clip-in and lay-in tile ceiling.
· Organized a working group of skilled manpower for the metal and Aluminium clip-in and lay-in tile ceiling set up and write technical report like updating the on-going installation checked if the provided plan were followed.
· Responsible for monitoring and managing site supervision team in compliance with the Project Specification and checking of documentations related to the works and reviewing of the contractor’s monthly valuations and reports.
· Create bar chart and the schedule of the construction project, together with the logbook of the daily construction activities.
· Prepare as-built drawings of constructed projects for future business references and maintenance purposes and arrange all files and documents in proper and orderly manner to obtain Easy access and location. Page 9
Geronimo D. De Castro Curriculum Vitae
Feb. 2001
Nov. 2002
AQUARIOUS CONSTRUCTION ENGINEERING ( Philippines) ) PROJECT ENGINEER
Project Cost: P50 Million
Projects
Undertaken
Mc Donalds & Jollibee Fast Food Chain Construction Structural works and architectural finishing and renovation.
Residential housing and Landscaping Construction of Bungalow 2 Bed room house GT Tower International (Sky lite pick Structural Crown, Painting Works ) Client: Jollibee & MC Donalds Corp.
Main Task
· Prepare detail estimate and quantity take off as the basis for material requisition and conduct canvassing of prices of construction materials as often as practicable from at least three decent suppliers as comparison to prices being billed by sub-contractor under cost project.
· Prepare daily and weekly report as per site accomplishment and participate notice of meeting and agenda.
· Evaluate material cost and schedule of man power and equipment. Provide instruction to foreman a systematic approach to actual site construction and implement safety program and policy
· Keep informed the Project Managers / Construction Managers concerning the status of the project to expedite the works essentially in order to avoid delay in the completion of the project.
Dec. 1998
Jan.2000
PLARIDEL ADJUSTERS AND APPRAISER INC.
(Philippines)
QC INSPECTOR/ ESTIMATOR ( Engineering Department ) Projects
Undertaken
Building and Residential (Fire Lost and Damages)
Heavy Equipment Warehouse ( Fire Lost and Damages) Garments and Socks Factory ( Flood Lost and Damages) Main Task
· Establish the physical damage claim value of assigned losses and develops, documents and continually updates a plan of action, including maintaining an effective diary to manage file inventory and bring the claim to resolution in a timely manner.
· Determine taxability and values of properties, using method such as field inspection, actual measurements, calculation, sales analysis, market trend studies, and income and expense analysis.
· Inspect properties, considering factors such as market value, location, and building or replacement cost to determine appraisal value.
· Analyze in trend sales prices, construction cost in order to assess property values and/ or determine the accuracy of assessment.
· Communicate claims damage assessment following negotiation of value repair facilities.
Oct.1997
Oct. 1998
GLOBE TELECOMMUNICATION
(Infrastructure & Facilities)
PROJECT ENGINEER
Project Cost: P 150 Million
Projects
Undertaken
Tanay Rizal Cell Site
(60 Meters Tower Steel structure)
Siniloan Laguna Cell Site
(80 Meters Tower Steel Structure)
Binangonan Rizal Cell Site
(60 Meters Tower Steel Structure)
Angono Rizal Cell Site
(60 Meters Tower Steel Structure)
Page 10
Geronimo D. De Castro Curriculum Vitae
Main Task
· Responsible for reviewing and responding to all clarifications, materials and shop drawings submittals in compliance with tender specification and project requirements to ensure the quality of works in accordance with the time frames and mile stones.
· Supervising structural works of the project construction for the installation of form works and fixation of steel bars, form works, for structural foundation, column, Beams and slabs and other related structural works.
· Responsible for quality inspection of fabrication and erection of structural steel cell site to ensure that all structural fabrication is constructed in accordance with approved shop drawing and project specification.
· Preparation of all required control logs to monitor the contractor and subcontractors performance for the sequence of work and to I identify any delayed activities to deploy all required efforts and corrective actions.
· Preparing and conducting regular weekly, bi-weekly and coordination meetings with