Geronimo D. De Castro Curriculum Vitae

PROFESSIONAL PROFILE

CONTACT DETAILS

Current Address:

Bin Mahmoud Doha Qatar

Home Address:

J.P Rizal St. Brgy. Pob. 4

Tiaong Quezon, Philippines

Email:

ad0jxh@r.postjobfree.com

Mob. No.:

+974-********

EDUCATIONAL ATTAINMENT

Bachelor of Science in Civil

Engineering

Laguna College City of San

Pablo, Philippines

March 24, 1996

CERTIFICATION

Project Management

Professional (PMP)

Project Management Institute

PMP No.3014590

Grant Date: 04 June 2021

Exp. Date:03 June 2024

Lead Auditor

Global Academy Quality

Management

Global Certified ISO9001:2015

Cert. No. QMS/2020/1020

Issued: 21 Dec. 2020

(Held on 11-15 Dec.2020

Lead Auditor

BSCIC CERTIFICATION PVT. LTD

Quality Management System

Course based on ISO

9001:2008

Cert. No. BTQ/C176/09:0915

Issued: 2 Sept. 2015

(Held on 7-11 Aug. 2015)

An experience, self-motivated, enthusiastic, and competent QA/QC Civil Engineer with a wide range of skills and experience gained over 24 years of related working experience, more than 18 years of solid experience in Middle East (Doha Qatar and Riyadh Saudi Arabia) and 6 years in the Philippines. High level of execution and interpersonal skills to drive quality system handling a large scale of mega projects. High-rise building construction and infrastructure (land development, structural civil works, steel fabrication and erection, precast concrete, architectural finishing works and facade). Client teamwork in resolving issues and coordinating QA/QC objectives Implement and maintain Quality Management System. EMPLOYMENT HISTORY

July 2023 -

Present

IRIS CONSTRUCTION TRADING W.L.L

(Turkey Co.)

CIVIL/ STRUCTURAL QC ENGINEER

OIL AND GAS PROJECT

RLTO Expansion and offplot Facilities of the

Northfield Expansion Project

(EPC-3)

Ptoject Scope Cost: QR 400-600 million

Sulfur Facilities for the Northfield

Expansion (NFXP) Project – EPC4

Ptoject Scope Cost: QR 400-600 million

QATAR GAS

Tecnicas Reunidas

Client

Main Cont.

Main task

· Responsible for all Civil and Structural inspection including all Material Delivery at the site.

· Closely monitor construction works, all steel testing for reinforcement, and concrete, and continuously check material delivered to site, ensure compliance with QA/QC procedures, and ensure that all tests are carried out as per contract requirements.

· Monitor the performance of the construction team during the implementation of the approved plans, inspection and test plan (ITP), method statement, procedures, and schedules, including that of individuals. Identify the development and implementation of activities and methods to improve and support operational objectives.

· Perform routine and non-routine inspections and support other quality personnel

(coordinators and inspectors) in monitoring construction team work execution during the construction phase.

April 2021

June 2023

PORR QATAR CONSTRUCTION W.L.L

(Austrian Co.)

SENIOR QA/QC ENGINEER

Project Cost : QR 48 million

Projects

Undertaken

Construction of Pedestrian Bridge (Phase 1)

Pedestrian Bridge (SL-14)

Pedestrian Bridge (SL-18)

Pedestrian Bridge (SL-56)

Pedestrian Bridge (SL-58)

ASHGHAL

CDM SMITH

Client

Consultant

Page 2

Geronimo D. De Castro Curriculum Vitae

SEMINARS

ASTM Training and E-

Learning Building Sciences

Quality Assurance Past, Present

and Future, Project Qatar

Issued : 30 April 2019

Continuing Professional

Development Real Estate

Development

De-constructed A Project

Qatar Training

Project Qatar CPD Provider

Organization

Issued: 29 April 2019

Quality Assurance and

Quality Control for

Construction Services

Oryx Rotana Hotel, Doha,

Qatar Issued: January 28, 2011

Quantity Surveying

Oryx Rotana, Doha Qatar

Issued: October 15, 2010

Basic Safety Training ( Fire

Fighting )

Manila Philippines

Issued: February 9, 1999

Basic Safety Officer and

Quality Control

Engineering Insurance Analysis

of Policy Condition and Loss

Adjustment

Manila, Philippines

Issued: Sept. 4, 1999

TRAINING

VMT Segment

Documentation

Segment Management

· Module Management

· Concrete Ordering

· Concreting and Demoulding

· Damaged Documentation

· Picture Documentation ·

· Capture and manage

Damage ·

· Block/ Trash Segment

· Segment Stocking

· Storage Administration · ·

· Hardware component

· Segment Delivery

Issued on: 14 Oct. 2014

Main Task

· Responsible for preparing technical submittals such as MST, ITP, MAR, PQN, and PQP in compliance with project specifications and QCS requirements for client representative review and approval.

. Prepare an audit schedule and conduct internal and external quality audits on subcontractors, manufacturers, and material suppliers. Conduct performance assessments to ensure that they are complying with quality requirements.

. Ensure that non-conformities, corrective action requests, complaints, and improvement recommendations from audits and other sources are formally recorded, that progress toward solutions that include preventive measures is made, and that the process is completed in writing.

· Participate notice of meetings and agendas with other trade contractors and client representatives to discuss quality issues, concerns and improvements (NCR, SOR, CAR, MIR, IRE, MAR, PQN, PQP, QCDD Requirements and Handing Over) for the settlement of all non- conformities as stipulated in the project specification.

· Prepare appropriate control logs for tracking the subcontractor's performance and identifying any delayed work so that all necessary efforts and corrective actions can be implemented.

· Lead and participate in the QA/QC Tool Box, Training, Monthly Reports and Lessons Learned, QA/QC Weekly Reports for Open Items and Submittal Tracker, Minutes of Meetings, and Submission of All Test Reports to the Client.

· Ensure all materials received for the project are in compliance with the approved submittal, are maintained properly, and are suitable for use in the project. Then, confirm and document the information.

Jan. 2020

Mar.2021

DAR ALHANDASAH CONSULTANTS

SHAIR & PARTNERS

LEAD QA/QC ENGINEER

Project Cost: QR 7.0 Billion

Projects

Undertaken:

Package BP-12A (Lusail Plaza Tower 1) 4 Basements + Ground + 50 storey building, Estimated GFA is

139,000m, Car park spaces1,599 number, Low rise

commercial buildings surrounding the tower,

Landscaping and external furniture. Package BP-12B

(Lusail Plaza Tower 2) 4/5 Basements + Ground + 50 storey building, Estimated GFA is 139,000m, Car park spaces 1,599/1,999 number, Low rise commercial

buildings surrounding the tower, Landscaping and

external furniture.

Package BP-12C (Lusail Plaza Tower 3) 5 Basements + Lower Ground + Ground + 69 storey building,

Estimated GFA is 172,000m, Car park spaces 2,225

number, Low rise commercial buildings surrounding

the tower, Landscaping and external furniture

Package BP-12D (Lusail Plaza Tower 4) 5 Basements + Lower Ground + Ground + 69 storey building,

Estimated GFA is 172,000m, Car park spaces 1,906

number, Low rise commercial buildings surrounding

the tower, Landscaping and external furniture.

Client LREDC- Lusail Real Estate Development Company Client Rep. QPM -Qatar Project Management

Page 3

Geronimo D. De Castro Curriculum Vitae

BASIC SAFETY TRAINING

Personal Survival Technique

· MO Model Course 1.19

Fire Prevention and Fire

Fighting

· IMO Model Course 1.20

Elementary First Aid

· IMO Model Course 1.13

Personal Safety and Social

Responsibility

Conducted Date:

From: Jan. 29, 2001

To : Feb. 09, 2001

Tunnel Safety Awareness

Fire Safety

Confined Space

Rebreathes

First Aid

Issued on: Sept. 02, 2015

Doha Qatar

VMT Segment

Documentation

SDS key Users

· Segment Management

· Quality Management

· Captured, Manage damage

· Block / Trash Segments

· segment Stacking

· storage Administration

· Manage Segment Deliveries

· User Administration

Issued on: 14 Oct. 2014

Doha Qatar

COMPUTER APPLICATION

Autocad Rel.14 with Color

Microcadd Technologies

Company, Manila, Philippines

June 1999 - August 1999

(70 Hrs.)

Autocad 2002 (Level 1 & 2 )

with Color Rendering

Microcadd Technologies

Company, Manila Philippines

Sept. 2003 – Sept. 2003

(70 Hrs.)

Microsoft Word

Microsoft Excel

Microsoft Power Point

MAIN TASK

· Responsible for managing and performing daily QC responsibilities in all factories (Structural Steel Fabrication, Pre-cast, Façade, Batching Plant & Trial Mix, and other architectural materials) to ensure that the work is completed in accordance with project standards. The role includes oversight and review of the entire documentation and physical inspection.

· Verify and document that all materials received for the project are in conformance with the approved submittal, stored appropriately, and are acceptable for use in the project.

· Provide daily QC reports that highlight activities being built in accordance with each individual project and constructively address non-conformance to deliver the intended result in a timely manner.

· Responsible for all site (Tower 1, 2, 3 & 4) quality control inspection and testing in adherence with contract requirements. Assist the Residence Engineer and Construction Manager in all quality-related issues.

· Monitor the process of steel fabrication and site installation, and verify if all welders are certified. Check that all tests (MPT, LPT, Ultrasonic test, fit up, visual welding dimension and painting) have been completed.

· Conduct an external quality audit of the main contractor, including sub-contractors, manufacturers, and material suppliers.

· Chair and document the weekly QC meeting with the production manager, QC manager, and engineers regarding quality concerns, issues, and improvements.

·

Review of technical submittals such as Prequalification document, method statements and ITP, Material submittals and all test report in compliance with project specifications and QCS requirements.

Mar.2014

Mar.2019

PORR BAU GMBH W.L.L (PSH JV) QATAR

(Austrian Co.)

SENIOR QA/QC ENGINEER

Project Cost: USD 2.25 Billion

Project

Undertaken

Doha Metro Rail Green Line Underground

Construction of The White Palace Station

(Civil Structure & Architectural finishing works

and Hand Over) Transfer level, Base B1 Level,

Platform P1 Level Concourse Level, Roof Level

Ground Level, 1st and 2nd Floor 1-8 Pup Level,

Ground Level + 1st and 2nd Floor Pup ups. Reinstatement, Road works and asphalting

Doha Metro Rail Blue Line Underground

Construction of The Blue Line Station

Underground (Civil Structure and Finishing

Work) Lower Basement, Transfer level,

Intermediate Level, Concourse Level, Roof

Level, Ground Level + 1st and 2nd Floor Pup ups

MLPA-Major Logistic Production Area Construction of Precast Factory

(Structural Steel, Civil Works and Roads ) Fabrication of Precast Segment (Tunnel Ring)

Client Qatar Rail

Client Rep. ASTAD PMC

Hill International PMC

Page 4

Geronimo D. De Castro Curriculum Vitae

PERSONAL PROFILE

Date of Birth : May 11, 1973

Civil Status : Married

Citizenship : Filipino

Religion : Roman

Catholic Passport No :

P2186661B

QID : 273********

Drivers License : Available

ORGANIZATION

PICE - Philippine Institute of

Civil Engineer

PICE - Philippine Institute of

Civil Engineer

OTHER SKILLS

PADI – Dive Master

(Scuba Diving)

Diver No. DM-370559

Cert. Date: 2 Oct. 2015

Inst. No. OWSI-478983

Jonathan F. Almanon

PADI – Rescue Diver

(Scuba Diving)

Diver No. 1507UE5283

Cert. Date: 24 July 2015

Inst. No. OWSI-478983

Jonathan F. Almanon

PADI – Advance Open Water

(Scuba Diving)

Diver No. 1506UC3437

Cert. Date: 11 June 15

Inst. No. OWSI-478983

Jonathan F. Almanon

PADI – Open Water

(Scuba Diving)

Diver No. 1405UD0809

Cert. Date: 24 May 14

Inst. No. OWSI-478983

Jonathan F. Almanon

MAIN TASK

· Responsible for the implementation of Quality Management System (QMS) reviewing all work procedures, method statement, material submittals, site testing and approved shop drawings in compliance with good work practices and delegate the task to the respective QC Engineers, QC inspectors and material and lab engineers.

· Attend a series of meeting and agenda concerning quality issues (NCR, SOR, SCAR-Site Corrective Action Report, CSR- Client Site Construction Report, MIR, IRE Rejection for the closure and settlement of all non-conformities as stipulated in the project specification.

· Responsible for managing and performing the daily QC responsibilities to ensure that all structural fabrication, concreting and architectural finishing is constructed in accordance with project specification that includes, factory visit, material inspection, Site installation and review the entire documentation. Develop training modules for various construction activities.

· Investigate non-conformance in product and site construction, identify the root cause, and develop a corrective action plan to prevent it from occurring again. Analyze test failure trends and NCR information.

· Prepare snag list for architectural and mechanical works, front of house, back of house, amenities, and coordinate to other trade contractor to closed witness by the client representative and Qatar rail prior to handing over of the station.

· In charge of pre-cast factory quality control for tunnel segments and slab tracks (fabrication, delivery, and installation). responsible for all site measurements, weekly reports, and monthly reports, as well as the preparation for handing over requirements such as QCDD requirements, as-built drawings, QC dossier, operation and maintenance manual, spare parts and warranties, closed out of work inspection requests, as well as material inspections and technical submittals from Codes "B" and "C" into Code "A."

Feb.2011

Feb.2014

BOYGUES BATIMENT INTERNATIONAL

Qatar (French Co.)

SENIOR QA/QC ENGINEER

Project Cost: QR 16.8 Billion

Projects

Undertaken

Qatar Petroleum Financial

District / Qatar Energy

(9 Towers) Iconic Project a

700,000 m office complex.

The project consist of 9

Office Towers Ranging

between 16 and 47 Floors

+ 1 5 Basement + 405

Rooms, Five Star Hotel and

Car Park with 5,340 places

and a conference center.

Client Qatar Petroleum Company

Client Rep. ASTAD Project Management

QPM Qatar Project Management

Consultant Keo International Consultants

MAIN TASK

· Responsible in supervising quality control personnel and inspection operation.

· Report issues to the QA/QC manager for non- conforming work or processes. Manage the NCR to ensure it is resolved in a timely manner to the satisfaction of the client in coordination with the construction department.

· Monitor, review and approved Quality Control Documentation progressively compiled during the project to ensure that all activities are recorded and reported as required. Taking care QA/QC documents include certificate, calibration, test results, Inspection request, NCR, CAR, and site Inspection.

Page 5

Geronimo D. De Castro Curriculum Vitae

· Review, work procedure method statement and material submittal in compliance with project requirements and delegate to the quality control personnel on their respective responsibilities.

· Develop, implement and manage the Construction inspection and Test Plan (ITP) for all the temporary and permanent works jointly with the client representative and construction team member.

· Closely monitor construction works, all steel testing for reinforcement and all concrete testing, all concrete precast and structural steel fabrication, and continuously check material delivered to site, ensure compliance with QA/QC procedures, and ensure all tests are carried out as per contract requirements.

· Preparing and conducting regular weekly, bi-weekly and coordination meeting with the construction team, sub-contractor and supplier to monitor and enhance the quality and performance of executed work.

· Monitor the process of steel fabrication and site installation and verify if all welders are certified. Check that all tests (MPT, LPT, Ultrasonic test, fit up, visual welding dimension and painting) have been completed.

· Participate in product Qualification activities by reviewing test protocols and reports to ensure product quality meet the specified requirements.

Dec.2009

Nov.2010

BILFINGER BERGER QATAR (German Co.)

QA/QC ENGINEER

Project cost: QR 4.89 Billion

Project

Undertaken

CONSTRUCTION OF BARWA CITY PHASE 1

Residential Housing Projects will cover a 2.7 million square meter land in Musameer, just outside the

heart of Doha. The development consists of 128

apartment buildings, 6000 flats and 1024 studios.

The houses are classified in three different type: Type A and Type B with up to 7 Floors (G+6) and

Type C with 2 Floors (G + 1st Floor)

Client Barwa Real Estate Company

Client Rep Aecom/ Mounsell

MAIN TASK

· Manage quality control of all precast concrete fabrication for wall, beam, Hollow core and all required reports Measurements, Concreting, damage documentation de-molding, deficiency report, precast storage, trash concrete, concrete repair and Delivery.

· Review all work procedure, method statement and material submittal in compliance with good work practices and delegate task to the respective QC personnel, Material and lab engineers of their respective responsibilities.

· Monitor all the precast installation activities and execution of work and prepare daily and weekly report as per site accomplishment and participate notice of meeting and agenda together with other trade contractor conducted with the owner’s representative.

· Prepare and maintain quality record WIR Status, Cube sampling, Testing Status, Histogram chart, MIR, and concrete delivery, Ensure that the required inspections and test result are carried out and that all quality records are adequately completed and taking care off.

· Ensure that the Non-conformities, corrective action request, complaints, recommendations for improvement from Audits and elsewhere are recorded formally, are progress to solutions that include preventive measures were implemented and are close out in writing.

Page 6

Geronimo D. De Castro Curriculum Vitae

July 2006

Nov. 2009

HIGGS & HILL / INTERBETON (ROYAL BAM INT’L)

(Dutch / British Co.)

SENIOR QA/QC ENGINEER

Project

Undertaken

AL HITMI OFFICE BUILDING (Project Cost: EUR 43

Million) A high quality commercial building

complex is divided into two wings. The East wing

comprises two basements, a ground floor, a

transfer level, six rentable office floors and a roof garden. The west wings also comprise two

basements, a ground floor and a transfer level, but has seven rentable office floors and a roof that is used to house complex’s chillers. The middle area

comprises an Atrium with seven bridges

connection the wings.

AL HITMI RESIDENTIAL BUILDING (Project Cost:

EUR 40 Million) Construction of an eighteen-floor

high quality residential building with 31,500 m

surface area. In first instance plan as a residential building with 84 apartments, the design was

changed during construction into a more luxurious

140 apartment building.

Client:

Client Rep.:

Ali Bin Khalifa Al Hitmi & Co.

NORR Group Consultants International DIWAN

DOHA BANK TOWER NEW HEAD QUARTERS

Construction of 27 storey skysctaper with 3

basement Concrete finished on sub-structure and

super structure.

Doha Bank

Hyder Consulting Middle East

Adil Jaidah & Associates

Client:

Client Rep.:

Client:

RAS LAFFAN FORT EXTENSION (Oil & Gas) (21.5

km Brake Water) Six Construction and Interbeton

JV

(QP) Qatar Petroleum

Page 7

Geronimo D. De Castro Curriculum Vitae

MAIN TASK

· Implement the Project Quality Plan to ensure an effective Quality Management System and Responsible to organize, Implement, conduct and manage the QA/QC program as per the company’s policy and contract specification requirements to the project. Work as a senior QA/QC Engineer give instruction to all inspectors and coordinate all inspections as per PQP and Contract Specs in attainment of quality requirements, liaise with client representative for conducting day to day inspection of the site activities.

· Supervise Structural Steel Fabrication and Inspect all structural steel erection and all welding test (MPT, LPT, Ultrasonic test, IRN-Inspection Release Note, FUR- Fit-up Report, WVT- Weld Visual Report, VDR-Visual & dimensional Report, Painting Report )

· Prepare quality control status register (WIR Status, Cube sampling, Testing Status, Histogram Chart and MIR, Concrete delivery status, Weekly and Monthly status report, )., Ensure that the required inspections and test result are carried out and that all quality records are adequately completed and taking care off.

· Preparing and conducting regular weekly, bi-weekly and coordination meetings with client, Contractors and suppliers to monitor and enhance the quality and performance of executed works.

· Responsible for snagging/ de-snagging and preparation for handing over requirements such as the as built drawings operation and maintenance manuals, warranties, and spare parts and Responsible for preparing handover completion certificates and related closing out documents

April 2005

June 2006

SWAYEH CO. LTD

Kingdom of Saudi Arabia

QA/QC ENGINEER/ PROJECT ENGINEER

Project

Undertaken

AUTO AUCTION YARD Construction of land development with 150 hectares Car Park + 2 Petrol Station + Car Wash Building + Commercial Building 3 Storey. Construction of roads concreting and asphalting

Client: (ADC) Arriyad Development Company

Client Rep.: Zuhair Fayes Partnership

MAIN TASK

· Analyze plan and specification and coordinate to the Design Department with reference to the approved plan for the preparation of field inspection, Conduct site inspection together with the consultant Civil Inspector to check if the actual construction are properly done as per specification and approved plan.

· Prepare all Material Testing and Inspection with (RFI) Request for Inspection, for all Building Structure, Architectural Finishing and Land Development Activity and Prepare testing for backfilling material as well as Barrow and Sand Materials.

· Prepare Land Development compaction testing or Field Density test by using Nuclear Method Test and Sand Cone Test to determine the required Maximum Density as per project specification.

· Prepare Quality Control of Fresh Concrete specifying its Slump Test and Concrete Temperature as per project specification and monitor all concrete delivery by proper coordination with the ready mixed company, and write technical report updating the progress of actual site construction

· Prepare weekly program activity as per Bar Chart Schedule prepare by Planning Engineer, Conduct site inspection and checked if the provided pan were followed and provide instruction to foreman a systematic approach to actual site inspection and implement Safety program and policies.

· Coordinate to the project/site engineer in-charge and prepare daily and weekly report as per site accomplishment and participate notice of meeting together with the Consultant with respect to site condition.

· Arrange all files and documents in properly and orderly manner to obtain easy access and location. Page 8

Geronimo D. De Castro Curriculum Vitae

Dec.2002

Jan. 2005

HUNTER DOUGLAS PHILIPPINES Inc. (Philippines)

PROJECT ENGINEER

Project Cost: P 150 Million

Project

Undertaken

G.T International Tower (Architectural and Finishing Works) G.T Int’l Tower is an office skyscraper located in Makati, Philippines. G.T Stands for George Ty, the building owner and chairman of the Metro Bank

Group. Standing at 217 meters, it is currently the 12th tallest building in the country and Metro Manila as well as with 43 Floors Height 217.2 m/ 713 ft. + 5 Basement

LKG Tower (Architectural and Finishing Works) LKG

Tower (Architectural and Finishing Works) the City. Standing at 180.1 Meters (590.88 Feet), the building has 38th Floors above ground, and 5 basement level for parking. The LKG tower is owned By international

Copra Export Corporation (ICEC), Land Corporation and was Design by Architectural firm Kohn Pedersen Fox Associates.

Project Cost: P110 million

JG SUMMIT TOWER (Architectural and Finishing

Works) JG Summit Center is an office skyscraper

located in the Philippines. It is own by JG Summit Holding Inc., It stands at 174 meters (570.87 Feet) 43/F 3- Basement It is currently the 9th tallest building in the Philippines.

Metro Bank

International Copra Export Corporation (ICEC)

JG Summit Holding Inc. & Robinson Land Corporation. Client:

Designer &

Client Rep.:

GF & Partners Architects and Gozar Planners Philippines Kohn Pedersen Fox Associates

Hellmuth, Obata + Kassabaum (HOK)

Main Task

· Responsible for reviewing and responding to all clarifications, materials and shop drawings submittals in compliance with tender specification and project requirements to ensure the quality of works in accordance with the time frames and mile stones.

· Prepare and analyse reflected ceiling plan, showing the location of Electrical lightning fixtures, HVAC supply and return diffusers, mechanical fixtures as the basis for actual Installation to prevent error in the Implementation of metal and aluminium clip-in and lay-in tile ceiling.

· Organized a working group of skilled manpower for the metal and Aluminium clip-in and lay-in tile ceiling set up and write technical report like updating the on-going installation checked if the provided plan were followed.

· Responsible for monitoring and managing site supervision team in compliance with the Project Specification and checking of documentations related to the works and reviewing of the contractor’s monthly valuations and reports.

· Create bar chart and the schedule of the construction project, together with the logbook of the daily construction activities.

· Prepare as-built drawings of constructed projects for future business references and maintenance purposes and arrange all files and documents in proper and orderly manner to obtain Easy access and location. Page 9

Geronimo D. De Castro Curriculum Vitae

Feb. 2001

Nov. 2002

AQUARIOUS CONSTRUCTION ENGINEERING ( Philippines) ) PROJECT ENGINEER

Project Cost: P50 Million

Projects

Undertaken

Mc Donalds & Jollibee Fast Food Chain Construction Structural works and architectural finishing and renovation.

Residential housing and Landscaping Construction of Bungalow 2 Bed room house GT Tower International (Sky lite pick Structural Crown, Painting Works ) Client: Jollibee & MC Donalds Corp.

Main Task

· Prepare detail estimate and quantity take off as the basis for material requisition and conduct canvassing of prices of construction materials as often as practicable from at least three decent suppliers as comparison to prices being billed by sub-contractor under cost project.

· Prepare daily and weekly report as per site accomplishment and participate notice of meeting and agenda.

· Evaluate material cost and schedule of man power and equipment. Provide instruction to foreman a systematic approach to actual site construction and implement safety program and policy

· Keep informed the Project Managers / Construction Managers concerning the status of the project to expedite the works essentially in order to avoid delay in the completion of the project.

Dec. 1998

Jan.2000

PLARIDEL ADJUSTERS AND APPRAISER INC.

(Philippines)

QC INSPECTOR/ ESTIMATOR ( Engineering Department ) Projects

Undertaken

Building and Residential (Fire Lost and Damages)

Heavy Equipment Warehouse ( Fire Lost and Damages) Garments and Socks Factory ( Flood Lost and Damages) Main Task

· Establish the physical damage claim value of assigned losses and develops, documents and continually updates a plan of action, including maintaining an effective diary to manage file inventory and bring the claim to resolution in a timely manner.

· Determine taxability and values of properties, using method such as field inspection, actual measurements, calculation, sales analysis, market trend studies, and income and expense analysis.

· Inspect properties, considering factors such as market value, location, and building or replacement cost to determine appraisal value.

· Analyze in trend sales prices, construction cost in order to assess property values and/ or determine the accuracy of assessment.

· Communicate claims damage assessment following negotiation of value repair facilities.

Oct.1997

Oct. 1998

GLOBE TELECOMMUNICATION

(Infrastructure & Facilities)

PROJECT ENGINEER

Project Cost: P 150 Million

Projects

Undertaken

Tanay Rizal Cell Site

(60 Meters Tower Steel structure)

Siniloan Laguna Cell Site

(80 Meters Tower Steel Structure)

Binangonan Rizal Cell Site

(60 Meters Tower Steel Structure)

Angono Rizal Cell Site

(60 Meters Tower Steel Structure)

Page 10

Geronimo D. De Castro Curriculum Vitae

Main Task

· Responsible for reviewing and responding to all clarifications, materials and shop drawings submittals in compliance with tender specification and project requirements to ensure the quality of works in accordance with the time frames and mile stones.

· Supervising structural works of the project construction for the installation of form works and fixation of steel bars, form works, for structural foundation, column, Beams and slabs and other related structural works.

· Responsible for quality inspection of fabrication and erection of structural steel cell site to ensure that all structural fabrication is constructed in accordance with approved shop drawing and project specification.

· Preparation of all required control logs to monitor the contractor and subcontractors performance for the sequence of work and to I identify any delayed activities to deploy all required efforts and corrective actions.

· Preparing and conducting regular weekly, bi-weekly and coordination meetings with



Contact this candidate