Post Job Free

Resume

Sign in

Process Control Project Manager

Location:
Houston, TX
Posted:
October 22, 2023

Contact this candidate

Resume:

David J. Becerra

Mobile:+1-269-***-**** / +1-346-***-**** / +58-414******* or +58-412******* /

Email: ad0j0h@r.postjobfree.com / Skype: becerradavid Ask for references in PDVSA Oil & Gas Company: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Supervisor) SENIOR ENGINEER

(OIL & GAS & PHARMA / PROJECT & OPERATION)

“PROJECT MANAGEMENT, AUTOMATION, INSTRUMENTATION & PROCESS CONTROL, COMPUTER SCIENCE, TELECOMMUNICATIONS, BUSINESS & TECHNOLOGY ADVISER” http://www.linkedin.com/pub/david-becerra/22/46/32 PROJECTS&OPERATIONS MANAGEMENT (OIL & GAS & Pharma), AUTOMATION, INSTRUMENTATION & CONTROL,

SYSTEMS, TELECOMMUNICATIONS

AND BUSINESS&TECHNOLOGY ADVISOR

(DAVID BECERRA / COVER)

David J. Becerra

Mobile:+1-269-***-**** / +1-346-***-**** / +58-414******* or +58-412******* / Email: ad0j0h@r.postjobfree.com / Skype: becerradavid Ask for references in PDVSA Oil & Gas Company: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Supervisor) SENIOR ENGINEER

(OIL & GAS & PHARMA / PROJECT & OPERATION)

“PROJECT MANAGEMENT, AUTOMATION, INSTRUMENTATION & PROCESS CONTROL, COMPUTER SCIENCE, TELECOMMUNICATIONS, BUSINESS & TECHNOLOGY ADVISER” http://www.linkedin.com/pub/david-becerra/22/46/32 Senior Engineer with +26 years’ experience in Automation, Process Control, Instrumentation, Computer science, Telecommunications (A.P.I.C.T) (Business & Projects & Operation) related to Oil and Gas Processes “Offshore & Onshore” and Power Plants. I have been working in “Petroleum of Venezuela S.A.” (P.D.V.S.A) since 1994 until Nov 2021 When I move to Pharma Process from Dec 2021 until present / Pfizer Covid 19 Projects. / Ready to relocate Last 20 years, I have been involved in Mega Projects and Operations / All related to Process control, instrumentation, IT and Telecommunication. Oil&Gas Plants: Upstream “Offshore and Onshore" & Midstream “Storage/Compressor/NGL/Transport” & Downstream “Refinery/LNG/LPG/Petrochemical” & Pharma.

• Operations: Interface & Optimization & Training and Delivery to operation teams from Automated Infrastructures (5 years)

• Integration & Programming directly any control equipment in field "DCS, Scada, PLC s, Instruments, Networks, Database, Applications, etc" (5 years)

• Projects: Pre-Feed, Feed, Procures, Contracts, Budgets, Human resources, FAT, Construction, Mechanical Completion, SAT, Pre-Commissioning, Startup, Run test. (+15 years

“Engineering&4 years / Interface&3 Years / Procure&1 year / Construction&4 years / Coordinator&4 years”) Current Skills:

• “IT Architecture & ERP & Business” Project Management (Oil & Gas & Pharma Platforms) / Validation & Verification Test Engineer (Pharma & Projects)

• Projects Coordinator and Engineering management. (Process control System / Oil & Gas & Petrochemical & Pharma)

• Automation & Process Control Leader (Project & Operation)

• Business Advisor & Optimization & Leader (Automation & Process Control) / (Project & Operation) Shutdown Automation Engineer (Pfizer Plant / 2023) / Verification Test Engineer ((Implementation of Pfizer Procedures "SOP&GMP&VT&NC&IPR& Walkdowns Drawings Correction" in Pharma Processes) & Automation Test Engineer (Factory Talk & PLC Allan Bradley) (Pre-commissioning). Development and supervise engineering (Pre/Feed), procure and contracts support, Budget defense, RFP s clarifications, prepare and supervise procedure related to: "FAT, SAT”, Verification Test and Coordination Pre-Commissioning (As-Built Design), Startup, Run test and Delivery”. Leading project engineer’s team (Engineering, procure, Construction and Startup phases). Joint Venture & Consortium Coordination “Foreign Companies”: Chinese “CNPC” & France

“Thecnnip” & German “Siemens” & Italy “ENI” & South Korean “SK” & Japan “JGC” & Indian “Essar” & Japan “Hyundai” & Russian “Belorussia/Gazprom” & US Teams

“Chevron/Halliburton/Schlumberger”. Upstream & Midstream & Downstream Projects. Involved Multiples Mega Projects (Total Budgets between 50 to 800 million $. Human Resources between 5 to 50 peoples. Handling directly around 10 to 15% total Budget, related to

“Instrumentation & Process control & IT & Telecom activities). Ability to plan / schedule, manages, coordinate, technically guide, engineering design, resources, budget and construction. Prepare, review and update Engineering (equipment list, calculations, specifications, procedures, P&ID, datasheets, etc.) about Automation and Control Technologies (Instrumentation, Measurement systems, Batch & Sequential Control processes, Process network, Process control systems, Process safety system “ESD and F&G”, Rotary Control, Control and monitoring “Package unit & services”, Supervision System, Processes Automation, Asset Management, Communications Systems and strategies & tactical systems). I have also participated: Cause Effect, MOC, HAZOP, SIL, Value Engineering, Constructability Analysis, PHA and QRA. Understanding common international codes and standards for the design and construction of liquid/gas infrastructures related to hydrocarbon projects. The ability to manage and establish business strategies. I am capable to liaise with contractors and company requirements. Assist the company with bids and proposals. Formulate and submit procedures following company and client requirements. Guarantee technical leadership, mentoring and multidisciplinary team’s coordination. Interfaces support. Responsible for identifying execution strategies behind each task taking the appropriate actions; including reporting such scoping issues to the respective management. Provide daily coordination of technical resources, preparing client status reports or meetings, goals deliverables, scheduling, cost & man-hours tracking and providing input concerning potential obstacles that could prevent successful completion of a project.

Identify, analyze, and resolve significant technical issues as related to projects and operations. Develops the strategies needed to integrate all process control. Follow all safety rules and guidelines as established by the process related. Ability to apply advanced aspects of technical/engineering field to practical business problems; Ability to apply managerial, leadership concepts and techniques (Business strategy, plan, execute, direct, coach, mentor, evaluate and control). Executes tasks efficiently. Effective communication. Interpersonal and Verbal Skill, oral presentations, report draft to any level. English language Domain. Office software domain. Effective Performance under pressure. Dynamical and Proactive. Creative and Innovative. Honest and responsible. Ethical and moral values. Stimulates efficiency in any role and function exercised. Looking for new professional Challenges. Highly self-motivated. Available to travel to any locations.

•Current Location / Relocation / Sponsor: USA / 100 % available / Work Permit required Worldwide / USA EAD Vigent

•Availability / Notice Period: October 23 / 30 days (After received commitment letter)

•Current / Expected Salary: US$110.000 / US$ 130.000 ("Per year") Thank you for your time and consideration Regards, David Jesús Becerra Giménez David J. Becerra

Mobile:+1-269-***-**** / +1-346-***-**** / +58-414******* or +58-412******* / Email: ad0j0h@r.postjobfree.com / Skype: becerradavid Ask for references in PDVSA Oil & Gas Company: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Supervisor) SENIOR ENGINEER

(OIL & GAS & PHARMA / PROJECT & OPERATION)

“PROJECT MANAGEMENT, AUTOMATION, INSTRUMENTATION & PROCESS CONTROL, COMPUTER SCIENCE, TELECOMMUNICATIONS, BUSINESS & TECHNOLOGY ADVISER” http://www.linkedin.com/pub/david-becerra/22/46/32 PROJECTS&OPERATIONS MANAGEMENT (OIL & GAS & Pharma), AUTOMATION, INSTRUMENTATION & CONTROL,

SYSTEMS, TELECOMMUNICATIONS

AND BUSINESS&TECHNOLOGY ADVISOR

(DAVID BECERRA / RESUME)

David J. Becerra

Mobile:+1-269-***-**** / +1-346-***-**** / +58-414******* or +58-412******* / Email: ad0j0h@r.postjobfree.com / Skype: becerradavid Ask for references in PDVSA Oil & Gas Company: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Supervisor) SENIOR ENGINEER

(OIL & GAS & PHARMA / PROJECT & OPERATION)

“PROJECT MANAGEMENT, AUTOMATION, INSTRUMENTATION & PROCESS CONTROL, COMPUTER SCIENCE, TELECOMMUNICATIONS, BUSINESS & TECHNOLOGY ADVISER” http://www.linkedin.com/pub/david-becerra/22/46/32 FULL NAME: David J. Becerra BIRTH DATE: March 22, 1969 PROFESSION /

CERTIFICATION: Electronic Engineer / CIV-96.199 STATUS / PASSPORT: Single / 146512843

EXPERIENCE: +26 years PROFILE: Projects / Operations / Interface / Management / Business

LANGUAGES: Spanish (Native) and English (Speaker) NATIONALITY: Venezuelan EMAIL: ad0j0h@r.postjobfree.com SKYPE Davidjesus3000 Linkedin: http://www.linkedin.com/pub/david-becerra/22/46/32 SUMMARY

A specialist on Projects & Operations related to "Automation, Instruments & Process Control". Engineering Leader (Pre-Feed / Feed). Project Engineer (Pre- Feed / Feed / EPC / Commissioning / Startup / Run Test and Delivery). Project assembly leader & System integration support: PlantPAx Allen Bradley Technologies. Interface Leader & Technology Adviser (Instrumentation, Measurement, Wells Artificial lift Systems, Process Control System, Process Safety System, Batch & Blending Processes, Supervision System, Systems Integration, Computer Science, Telecom System “LAN/WAN”, Best practices, Learned lessons, design, operations, strategies, Guidelines, standards and procedures). Hydrocarbon Specialist “Productivity Integral Methodology (PIM)”. Knowledge’s: Management, Business&Market Advisor, Planning, Processes optimization (Oil & Gas / Subsoil and Surface). Handling: Finances, budgets, purchases, contracts, resources and policies. +26 years ample knowledge in operations and projects related to Oil and Gas processes (Exploration & Production / Conditioning & Processing / Refinery / Petrochemical / Transport & distribution and Power Plants) and Pharma Process. EDUCATION

B. Sc. Electronic Engineering, Instituto Universitario Politécnico Fuerzas Armadas Nacional (IUPFAN) or National Force Army Polytechnic University Institute, Maracay, Venezuela (1994)

WORK EXPERIENCE

P.D.V.S.A. (Petróleos de Venezuela S.A.) / Process: Oil & Gas & Petrochemical (1995 to Oct 2021)

• All experiences related to its resume has been acquired in PDVSA Oil & Gas Company, located in Venezuela, South America / + 2 years US included.

• The candidate has +26 years of ample knowledge in operations and projects related to Oil and Gas processes “Offshore & Onshore”. (Exploration

& Production / Conditioning & Processing / Refinery Petrochemical / Transport & distribution / Power Plants) specifically on disciplines: Automation, Process Control, Instrumentation, Computer science and Telecommunications (A.P.I.C.T). (Project & Operation). Pfizer (USA/Michigan/Kalamazoo / Pharma Process. Projects. Verification test Engineer. (Nov 2021/2022/2023)

(PHARM ENGINEERING TECHNOLOGY “Canada” & PFIZER “US”) Senior Project Engineer “Disciplines Process Control & Instrumentation” (Period 2023)

• (January 2022-Current): Senior Project Engineer (Automation & Instrument & Process Control). Projects: “Pfizer Plant. Upgrade US MI Kalamazoo. Functions: Validation & Verification Test Engineer ((Implementation of Pfizer Procedures "QAT&SOP&GMP&VT&NC&IPR&GCR& Walkdowns Drawings Correction" in Pharma Processes) & Automation Test Engineer (Factory Talk & PLC 5000 Series Allan Bradley) (Pre-commissioning and Start up).

• Shutdown Automation Engineer (Pfizer Plant / 2023)

(P.D.V.S.A. and INTECH PROCESS AUTOMATION) Interface & Senior Project Engineer “Disciplines A.P.I.C.T” (Period 2009-2021)

• (January 2020 – Dec 2021): Refinery Division Instrumentation & Control Lead / Functions: Project Coordinator (Fields: Automation/Process Control/Instrumentation/Telecommunications). Projects related: “Update the emergency shutdown system for furnaces and boilers. “Update the fire and gas detection system in the Product Dispatch Docks”. “Update the distributed control system”. “Update Recipe Blending System (Delta V) and Flow meters”. “IT Architecture & ERP & Business” Project Management (Oil & Gas & Pharma Platforms. All in the Puerto la Cruz Refinery” Venezuela.

• (January 2019 – Dec 2019): E&C Division Instrumentation & Control Lead / Functions: Engineering Leader (Fields: Automation/Process control/Instrumentation/Telecommunications). INCAERO Project. /. Functions: “Automation & Process control engineering” Interface coordinator. “100 TBPD

/ Oil Production Handle & Increasing Project”. Functions: EPC Leader (Fields: Automation/Process control/Instrumentation/Telecommunications).

• (May 2018- January 2019): E&C Division Instrumentation & Control Lead / Functions: Engineering Leader (Fields: Automation/Process control/Instrumentation/Telecommunications). Assigned to US-Houston by PDVSA and returned to Venezuela in January 2019. /. Functions: “Automation & Process control engineering” Interface coordinator. “240 TBPD / FAJA Junin Oil Production Increasing Project”. Functions: EPC Leader (Fields: Automation/Process control/Instrumentation/Telecommunications).

• (July 2015-May 2018): E&C Division Instrumentation & Control Lead / Functions: Engineering Leader (Fields: Automation/Process control/Instrumentation/Telecommunications). SUFAZ Project (EPC) / Functions: Integration Leader. 330 TBPD / Sinovensa Oil Production Increasing Project) /. Functions: “Automation&Process control engineering” Interface coordinator. “240 TBPD / FAJA Junin Oil Production Increasing Project”. Functions: EPC Leader (Fields: Automation/Process control/Instrumentation/Telecommunications).

• (May 2014-June 2015): Senior Project Engineer (Automation & Instrument & Process Control). Projects: “Naphtha Stripper Plant. Upgrade Carito-Pirital Compressor Plant”. PDVSA Venezuela. Functions: Engineering Leader (Any discipline) & Construction Leader (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• (February-May 2014) Assignment 4 months US Houston: Intech Process Automation Company (Automation & Process Control Engineer). Project assembly leader and system integration support. Projects: ESS&BCPS System Cardon IV (Saipem/Tecnicas Reunidas). Feed Gas Dryer Package Control System (Willians Energy Canada). ESS&BPCS (Chevron Nigeria Limited). ESS&BCPS (BHP Billiton). (PlantPAx Allen Bradley Technologies). Functions: Controls cabinet Assembly leader. Control System Integration Leader. FAT Leader. Shipping to Customer Facilities.

• (2009/2014): Senior Project Engineer (Automation & Instrument & Process Control): “LNG/Power Plants/Junin” Projects. Functions: Engineering Manager and Technical Quality adviser (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• (2008/2011): Mega Projects Superintendent “Gas Business” (Automation & Instrument & Process Control). Functions: Engineering & Construction National Coordinator (Fields: Automation/Process control/Instrumentation/Telecommunications).

• (2009/11): LNG Technologies (Analysis). FEED and EPC (Design LNG Plants). Cost Vs Benefits (Analysis). LNG Market (Analysis). Risk (Analysis). Budget

(Strategies). Transportation (Strategies). LNG Supply (Analysis). Global Energy (Analysis). Potential Global Energy demand (Analysis). LNG Contracts

(Analysis). LNG Short&Long Term & Trading (Analysis). Power Plants Projects (National Scope). Junin Project “Oil Surface facilities”. Functions: Technical Quality adviser (Fields: Automation/Process Control/Instrumentation/Telecommunications).

(P.D.V.S.A.) Operations & Technology Adviser / Project Leader “Disciplines A.P.I.C.T” (Period 2006-2008)

• (GAS Projects Management “national level”: Anaco Gas Project (Six Productions Plants/Domestic Gas), José 250 (Extraction Train and Ethane project), ACFJ

(Fractionation capacity expansion Cryogenic Jose), ICW (Expand pipelines/Center- Western), Colombo-Venezuela (Gas pipeline). CCW “Complex Cryogenic Western”. EGPV Projects (Expand Gas pipelines Venezuela/Industrial&Domestic Gas). Delta Caribe Projects (Platform/Subsea/Power Plants&Sub Station Electricals/Suitability plots plants, bays and ports, warehouses, administrative and control buildings, highways, heliports, etc.), PAGMI (Domestic gas conditioning plant), Sinorgas (Eastern&North Center pipelines/Industrial&Domestic Gas). LGN Plants (FEED&EPC “International Consortium Contract: David J. Becerra

Mobile:+1-269-***-**** / +1-346-***-**** / +58-414******* or +58-412******* / Email: ad0j0h@r.postjobfree.com / Skype: becerradavid Ask for references in PDVSA Oil & Gas Company: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Supervisor) SENIOR ENGINEER

(OIL & GAS & PHARMA / PROJECT & OPERATION)

“PROJECT MANAGEMENT, AUTOMATION, INSTRUMENTATION & PROCESS CONTROL, COMPUTER SCIENCE, TELECOMMUNICATIONS, BUSINESS & TECHNOLOGY ADVISER” http://www.linkedin.com/pub/david-becerra/22/46/32 JGC/Chiyoda/Technip/Saipen/Inelectra), LNG process (FEED&Advisers Linde Contract), 2008/2009. Functions: Engineering & Construction Coordinator

(Fields: Automation/Process Control/Instrumentation/Telecommunications).

• Cultural Interchange around Europe and USA "own initiative" (Florida, Louisiana, Texas, Italy, Switzerland, Austria, Hungary, Germany, Czech Republic, Holland, Belgium and France). 2007/2008.

• Venezuela Supplies & Business Plants Technical Operations Engineering Supervisor (Level: All Country) 2007. Functions: Operation Leader (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• Automation Management Technological Adviser. Eastern PDVSA. 2007. Functions: Technical Quality adviser (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• Business Plans Adviser 2007_2013. Eastern PDVSA. 2006. Functions: Business adviser (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• (P.D.V.S.A.) Business Cases Adviser & Project Leader: “Disciplines A.P.I.C.T” (Period 2004-2005)

• Business Cases Adviser: Integrated Automation Subsoil Surface “AI2S Eastern”. 2005. Functions: Business adviser (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• Leader AGP (Anaco Gas Major Project). Factory Test in Germany (Duisburg) and USA (San Diego) “Turbocompressor Solar&Siemens”. “Delta Caribe-Project” Adviser. 2004. Functions: Engineering & Construction Coordinator (Fields: Automation/Process Control/Instrumentation/Telecommunications).

• Project Leader: “Venezuela Fuels Distribution & Storage Plants Automation (FDS) - PDVSA Eastern”. Emergency Shutdown, Fire and Gas, Tank Measurement Systems Updating “Eastern FDS plants” (San Tome, Maturín, P.Ordaz, P.Ayacucho, C.Bolivar and PLC). S.I.L. Study. 2004. Functions: Engineering & Construction Coordinator (Fields: Automation/Process Control/Instrumentation/Telecommunications).

(P.D.V.S.A.) Technology Analyst / Project Leader “Disciplines A.P.I.C.T” (Period 2003)

• Technical Adviser. Project “A.I.2.S” Front End Loading (F.E.L.). Engineering Business case, Benefits and Processes related.

• Cultural Interchange around Europe's "own initiative" (Great Britain, Spain, Italy, Switzerland, Austria, Hungary, Germany, Czech Republic, Holland, Belgium and France).

• Support FEL for Cryogenic and Refining Projects (Jose and Refinery PLC).

• Technical Leader. Supporting Operational Coordination San Tome: Court Tanks Office, Trunk 51, Re-pump Miga/Melones, Dation and Lasmo Units LACT. Perez Compan Company.

• Technical Supports Leader “Joint Venture Ameriven / Cerro Negro PTO, Units LACT, Main pipelines and Jose Station”.

• South District Project leader: San Tome, Morichal and Anaco.

(P.D.V.S.A.) Oil and Gas Process Analyst “Master Specialization / Productivity Integral Methodology (PIM) ”(Period 2002)

• Specialization “Process Optimization in Hydrocarbon Deposits”: Rock Analysis, Static and Dynamical Model Analysis, Petrophysics and Geological Analysis, Decline and Potential Calculate, Exploitation Plan Analysis, Stimulation Design, Bacterium, Fractures, Pressures bottom Analysis, PVT Analysis, Buzamientos's Analysis, Reserves Estimation, Secondary Recovery Plan Analysis. Damages Estimation.

• Specialization “Wells Completion Process Optimization”: Drainage radius Analysis, Wells historical Analysis, Geomechanics Analysis, Logs Analysis, Cementation Analysis, Well Reserves Estimation, Decline and Potential Calculate, Completions Analysis and Designs, Neighboring wells Analysis, Sand Control Designs, Gun Analysis and design, Artificial Lift system analysis and design (PCP, ESP, GAL, and MP), Injection Plan Analysis, Bottom sensors Specification, Well Head Instrumentation Design, Surface-Well Pressures Analysis, RA/RC's Designs. Well Separation Technologies Evaluation, Wells Damages Estimation.

• Specialization “Production Process Optimization “Surface”: Flows Stations, Compression Plants, Storage Plants, Pumping and Shipping. Oil and Gas Pipelines Optimization.

• Specialization Integral Optimization Hydrocarbon Deposits- wells –Surface”: Operation Analysis, Maintenance and Procedures, Failures Analysis Statistics, Nodal Analysis, IP's Determination.

• Specialization “Risks and Costs Analysis”: Economic Model design (Profitability, NPV, RIT, EVA, ROCE, Benefits), Risk Design (Sensibility, Uncertainty), Resources Estimation.

• Specialization “Justification and Planning”: Capital investment optimization and Costs Reduction, Benefits explanation, Plan Design, Optimization Solutions

“hydrocarbon deposits-Well-Surface” related to Oil and Gas Business “Exploration/Production/Storage and Shipping”.

(P.D.V.S.A.) Technology Analyst & Project Leader “Disciplines A.P.I.C.T” (Period 2000-2001)

• Project Leader “Control Rooms and management Eastern”: FEL. Plants: San Tome, Morichal, and Punta Mata.

• Corporate Project Leader “Implantation Middleware Eastern”. FEL Eastern Optic Fiber Project.

• Annual Report for Eastern Management: Automation Fair, Atlanta Georgia, USA.

• Corporate Project Leader “Automaco, Eastern Zone”: Autofitra, Automega, Autocen, Autocon, and Simaco.

(P.D.V.S.A.) Integration Engineer / Technology & Quality Analyst “Disciplines A.P.I.C.T” (Period 1998-1999)

• English Intensive Training for 3 levels. Reaches level VI. CIED (Advanced)

• Assignment 4 months Bently Nevada Corporation. Carson City, Nevada USA. Integration department. Saudi Aramco Projects, etc.

• Project “Eastern Diagnosis Rotary Center (Cendero)”. F.E.L, Purchase and Construction for the plants: COA, COT, Jusepín 2 and 6, PIGAP, Resor, Mini plants, F. S. Musipan, F.S. Muri, F.S. Carito, PTT, Rb2, Rb1, PTO, PTA, Jobo 2 and Jobo 3.

• ISO 9000:2000 applied A.P.I.C.T Management. Asset Management Specification applied to A.P.I.C.T Management.

• Project “Y2k PDVSA”. Justification and managing for Eastern Contract. Assignment Kenonic Controls, Calgary, Canada. Detection and Fix Eastern plants

“Exploration and Production”: San Tome, Morichal, Bitor, Sisor, Punta Mata, Maturín, Anaco and Puerto la Cruz.

(P.D.V.S.A / CORPOVEN) Technology Analyst / Project Engineer “Disciplines A.P.I.C.T” (Period 1995-1997)

• Project “ACRO Phase II”, Jose Cryogenic. Database and HMI. TDC 3000. Train # 2.

• Project "Eastern Oil Managing Optimization". F.E.L, Purchase and Construction around Eastern PDVSA, Operational Coordination Business Plants (C.O.O.): PTT, Jusepín, Rb2, Rb1, PTO and PTA, As well as valves stations “pipelines 51 / 54”.

(P.D.V.S.A / CORPOVEN) Thesis & Intership “Electronic Engineering” (Period 1994)

• Thesis in Palito Refinery: Data Integration System between IA Foxboro and TDC 3000. Palito Refinery.

• Internships in Palito Refinery: Fire System Optimization to Deltanet.

(P.D.V.S.A / CORPOVEN) TRAINING

• Industrial Electronic applied. Personal Overcoming “Control Silva” Texas USA.

• Control Systems Configuration, programming and installation: TDC 3000, S3, PLC, SLC and RTU. Rockwell, Schneider Group, Honeywell and Metso.

• “Basic Level Applications”: Visual Basic, Turbo C++, HTML, JavaScript, Front-Page and Excel Macros. David J. Becerra

Mobile:+1-269-***-**** / +1-346-***-**** / +58-414******* or +58-412******* / Email: ad0j0h@r.postjobfree.com / Skype: becerradavid Ask for references in PDVSA Oil & Gas Company: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Supervisor) SENIOR ENGINEER

(OIL & GAS & PHARMA / PROJECT & OPERATION)

“PROJECT MANAGEMENT, AUTOMATION, INSTRUMENTATION & PROCESS CONTROL, COMPUTER SCIENCE, TELECOMMUNICATIONS, BUSINESS & TECHNOLOGY ADVISER” http://www.linkedin.com/pub/david-becerra/22/46/32

• Protocols OPC, DDE and NDDE, Modbus RTU and ASCII, TCPIP.

• Fieldbus, Hart, Fibers optics, LAN and WAN Networks. Topologies, Hubs, Routers. ULA (Andes University). Merida. Venezuela.

• Office Tools: Project, PowerPoint, Word, AutoCAD 2000, Microsoft Access, Excel and Internet.

• English: Level I, II, III, IV, V, VI and Conversational. PDVSA CIED Institute.

• Telecommunication Systems. Optic Fiber, Antennas, Satellite, Microwave, Wireless and GPS. ULA (Andes University). Merida, Venezuela

• Control System Analysis and optimization (Y2K). Software and Hardware. Kenonic Controls, Calgary, Canada.

• Project management. Front End Loading (F.E.L.) and Value Engineer. Pathfinder, Texas EEUU.

• Health, Safety and Environmental (HSE), Hazard & Operability (HAZOP), Analysis Cause Root, Change Handling and Processes Safety Management. System Integrated Level (SIL)

• Rotary equipment’s Expert System Diagnose and Configuration: MCM2000, DM2000, 2201, 3500. Bentley Nevada Corporation. Carson City, Nevada., USA.

• Automation Fair, Georgia, Atlanta, USA.

• (PIM): Surface / Suboil Integration Training: Oil and Gas deposit Integral Analysis, Surface Process Wells and Integral Analysis. Intevep, Baker, EPS, Corelab, Schlumberger and Halliburton Companies.

• (PIM): Wells Productivity Training’s: Applications “Stimcade, Fradcade, CoilCade, SandCade, Pansystem, Xero, OFM, SPAN, WTO, Sigemap, Wells files, PCPump, Conformance technology, CoilCade”. Intevep, Baker, EPS, Corelab, Schlumberger and Halliburton Companies.

• (PIM): Production Methods Training’s: Natural and Artificial Methods: “PCP, ESP, GAL, MP, Wellflo, Sedla, Isis, Pipesim, Perform 3.0.” Intevep, Baker, EPS, Corelab, Schlumberger and Halliburton Companies.

• (PIM): Surface Process Training: Applications”Pipephase, Pipesim-net, Fieldflo, REO”. Baker, EPS, Corelab, Schlumberger and Halliburton Companies.

• (PIM): Estimation, Planning and Risks Training’s: MAEP, Primavera, Crystal Ball, Project management. IESA Institute.

• Tank Farm Measurements. Radar Technologies: SAAB System. Configuration, installation and faults diagnosis. P&B Company.

• Safety Instruments Systems (SIS). Intevep SHA.

• Organization and Leadership: Leadership and Innovation, Organizational Change, High-Performance Teams, Balance Scorecard and Achievement Motivation

• Technical: Oil and Gas Process, Process Engineering, Design Practice, ISO 9000, PDRI, Process Simulation, Troubleshooting, oil and Gas process Automation, National and International Seminars.

• Turbines Compressor Control/Maintenance (Siemens) “Germany, Duisburg”.

• Compressor Control (Solar) / TT`s Seminars 2005, Solar interchange (San Diego, USA)

• PMI International Certification. (Test, January 2013, London)

• LNG Market Adviser. 2008/2009. Special Training led by LNG Marketing advisers (Andy Flower/David Ledezma)

• Rockwell Technologies Seminar. Puerto la Cruz City, Venezuela

• Logic 5000 Family Certification. Houston Texas, Allen Bradley Woodlands. February 2014. Skills and Attitudes

• Knowledge: Management, Planning, Market Analyst, Processes optimization (Oil & Gas / Subsoil and Surface).

• Handling: Finances, budgets, purchases, contracts, resources and policies. Interpersonal and Verbal Skills, oral presentations, report draft to any level. English language Domain

• Effective Performance under pressure. Dynamical and Proactive. Creative and Innovative

• Aptitudes and Effective Teams work Managing. Planner and organized. Analytical based on tools and quality philosophies.

• Performance Capacity in areas: Exploration and Production Processes, Optimization, Fluids Management, Administrative Processes, Consult, Audits, Planning and Management.

• Justification and Managing Oil and Gas contracts. (Resources, Purchase and follow-up).

• Knowledge’s ISO Procedure 9000:2000, Quality Control and Strategic Planning.

• Honest and responsible. Lead on ethical and moral values. Perfectionist and dedicated to fulfilling goals. Excellent interpersonal relations. Challenges Creator stimulating efficient role development and function exercised.

• Looking for new professional Challenges and Ready to travel whichever place around the world in fulfilling his duties.

(P.D.V.S.A / CORPOVEN) PUBLICATIONS / EVENTS

• "Surface - Suboil" Integrated Automation Workshop.

• Productivity Integral Methodology (PIM) Workshop. OTHER REFERENCES

• Jose E. Becerra. Chemical & Process Engineer. 001-780-***-****. Edmonton. Canada. Email: ad0j0h@r.postjobfree.com

• Jose A. Becerra. Chemical & Process Engineer. +58-414-*******. Puerto la cruz, Venezuela. Email: ad0j0h@r.postjobfree.com

• Luis A. Becerra. Computer Science Engineer. +1-832-***-****. Emerson, Houston, Texas. USA. Email: ad0j0h@r.postjobfree.com

• Howard Rosi. Mechanical Engineer. +1-832-***-****. Foster Wheeler. Houston, Texas. USA. Email: ad0j0h@r.postjobfree.com

• PDVSA Oil & Gas Company references: Mobile +58-416******* (Mr Luis Martinez / Project Manager / Current Supervisor)



Contact this candidate