Post Job Free

Resume

Sign in

Lead Superintendent Fort Worth

Location:
Frisco, TX
Posted:
October 20, 2023

Contact this candidate

Resume:

Eric Hernandez Baca

Phone: 972-***-**** Address: 7201 Henneman Way apt. 163, McKinney TX 75070 email: ad0iom@r.postjobfree.com KEY QUALIFICATIONS:

** ***** ** ********** ** Structures Construction

Successfully managing projects of various sizes

Key contributor with broad knowledge to complete the scope of the projects on time and on budget

Bilingual-Fluent in both English and Spanish.

WORK HISTORY:

Dragados / Fairmont Line / Boston MA. – High speed Rail / Corcoran CA. Served as Lead Superintendent overseeing the demolition and replacement of railroad bridges on the Fairmont line. Responsible for scheduling and the management of sub-contractors on the job. Currently serving as Lead Superintendent overseeing the erection of Deer Creek Viaduct in California. April 1, 2021 – Present

KIEWIT /East Link Extension; E130 Seattle to S. Bellevue CMGC, sound transit /Seattle, WA $676,000,000 Served as Track Superintendent over the E130 - Downtown Seattle to South Bellevue Project. This project begins in the International District Station (IDS) in the Downtown Seattle Transit Tunnel (DSTI) and extends east approximately 6.9 miles to just east of the East Channel Bridge in South Bellevue. The alignment connects to the Center Roadway in 1-90 from the IDS via the D2 ramps, extends east in the center of 1-90 through the Mount Baker Tunnel (MBT), across the Homer M Hadley (HMH) Floating bridge, through the Mercer Island Lid (MIL), and across the East Channel Bridge

September 15,2019 – February 15, 2021

HERZOG -TEX RAIL / Fort Worth to DFW International Airport Terminal B CM-GC /Fort Worth, Tx. The TEX RAIL project is a 27.2- mile commuter rail system planned to operate between downtown Fort Worth, Texas and Northeast Tarrant County to the Dallas/Fort Worth International Airport. Served as the Stations Superintendent for this commuter rail line which consists of 9 stations, two of which are shared with the Trinity Railway Express (TRE) service in downtown Fort Worth. In addition to the two common stations downtown Fort Worth, the TEX RAIL LINE shares the DFW Airport- Station and the Terminal B Station with the future planned Dallas Area Rapid Transit (Dart) Cotton Belt East Line in North Dallas. There are 39 at grade road crossings and 23 bridges to be constructed including structures that cross the Trinity River, UPRR Peach Yard, and S.H. 114 spanning 16 lanes of traffic. January 15, 2016-March 1, 2019 FERROVIAL-AGROMAN /Trinity Infrastructure LBJ Express /Dallas, Texas Served as Structures Superintendent on this 2.7-Billion-dollar project for Trinity Infrastructure. Superintendent over all structures including sub- structure and super structure. This project was completed several months ahead of schedule. The 17-mile project consisted of bridges and paving that started at I-35 (Stemmons Freeway) at Northwest Hwy. and ended at 6B5 (LBJ Freeway) and 75 (Central Expressway). This project consisted of 4 main lanes, B continuous lanes of frontage lanes in each direction along with 3 managed lanes in each direction. September 15, 2010- December 25, 2015

HAYDON BUILDING CORP. /Grand Prairie and Forney, Texas Served as Structures Superintendent on bridges, paving, walls and underground utilities on two separate jobs which were both highway jobs both ranging from $10-$20 million. November 1, 2009- August 15, 2010 HERZOG /Dart Green Line LRT CM GC 3 /Dallas, Texas Served as Stations Superintendent on this $471 million LRT project, which spans 13.5 miles of double track. This project called for heavy civil construction of eight miles of elevated concrete or steel bridge structures, direct fixation and ballasted track installation, a 2,000-foot slurry wall open cut tunnel, utilities, road crossings, pavement, signage, 8 stations-3 aerial and 5 at grade, landscaping, electrical, mechanical, and systems signal and communication elements for train operations. April 30,2005-October 1, 2009 HERZOG /NMDOT Rail Runner Express Phase 11 Design-Build/Albuquerque, New Mexico Served as Structures Superintendent on this $128 million design-build project, led the teams to remain on-time and on-budget. This project included construction of 18 miles of new commuter rail line complete with approximately 2.3 million cubic yards of excavation, 1.9 million cubic yards of embankment, six railroad bridges, one highway bridge, five cut and cover boxes for rail access, 125,000 square feet of retaining walls, complete storm drainage system, various utility improvements, IB miles of new ballasted track, installation of railroad system and various improvements to existing freeway, frontage road and county roads. February 1, 2000-April 15, 2005 TRAINING AND CERTIFICATIONS:

OHSA 30 CERTIFIED

CPR CERTIFIED REFERENCES: Page two

REFERENCES:

Andy Payne Dustin Darby Craig Ebsold Harold Harris Legacy Foundations DBIA Colas, Inc. Herzog Contracting Co. Dana Corporation Project Manager US Director, AD Parts Project Manager National Filter Sales (retired) 310-***-**** 918-***-**** 214-***-**** 903-***-**** ad0iom@r.postjobfree.com ad0iom@r.postjobfree.com ad0iom@r.postjobfree.com ad0iom@r.postjobfree.com 73 Headquarters Plaza

Morristown, NJ. 07960

Chuck Emerson Bruce Howarth

Legacy Foundations Alpaugh Irrigation District

Superintendent District Manager

813-***-**** 559-***-****

ad0iom@r.postjobfree.com



Contact this candidate