CURRICULUM VITAE
*.PERSONAL INFORMATION
Name : Dapot Debby Tampubolon
Date of Birth : 1 February 1978
Sex : Male
Marital Status : Married
Passport No. : C7320060
Mobile Phone/WA : +628**-****-****
Email : *****.***@*****.***
Address : Perumahan Rhabayu Regency, block A2 No. 12
Tanjung Riau – Batam, Indonesia
2.SUMMERY SKILL & EXPERIENCE
An ambitious, committed and enthusiastic QA/QC Inspector qualified Senior Welding Inspector CSWIP 3.2.1 who has more than 15 years of experience in Oil and Gas, the field of Piping/welding inspection. I work on Piping Schematic, Pipeline, Jacket and Platform installation. I also know how the X-Ray, PAUT and AUT category NDT works after a visual inspection on a Pipeline job. In Piping construction, I have done everything from Fit-Up, Welding Inspection, Mechanical Inspection to Hydro / Pneumatic test.
3.ACADEMIC BACKGROUND
Polytechnic University of North Sumatera 1998 – 2001
Diploma 3 majoring in Mechanical Engineering
4.CERTIFICATION AND TRINING
CSWIP 3.2.1 Cert. No.: 397915, Expiry: 12 December 2024
ISO 9001:2015 Lead Auditor (IRCA) Cert. No.: 338614
RI ASNT Level 2 Cert. No.: N21058.048, Expiry 20 Oct 2026
MT ASNT Level 2 Cert. No.: N21058.466, Expiry 31 Aug 2026
PT ASNT Level 2 Cert. No.: N21058.467, Expiry 31 Aug 2026
UT ASNT Level 2 Cert. No.: UT-14663, Expiry 24 Sept 2025
BOSIET + TSbB Vantage No.: 1091608, Expiry 11 May 2025
5.PROFFESIONAL QUALIFICATION
Well interpret based on Code/Rules/Standard will be used such as AWS D1.1, API 650, ASME VIII, ASME V, ASME B31.3, ASME IX, API 1104, API RP 2A, ABS Rule
Design, perform and judgment Welding Procedure Specification (WPS)
Well understand in Non-Destructive Test (RI, UT, MT, PT) and Destructive Test (Tensile, Bend, Impact, Hardness, Macro Etch Test)
Well understand in welding processes and basic of metallurgy
Performing visual inspection of welding
Familiar with Isometric Drawing (Piping and Structural), P&ID Drawing and AutoCAD
Familiar with Pneumatic and Hydraulic System
6.EMPLOYMENT HISTORY
Company : PT. Saipem Indonesia Karimun Branch
Project : EPC for North Field Production Sustainanblity Offshore & Pipeline Project
Client : Qatargas Operating Company Limited
Location : Saipem Indonesia Karimun Branch Yard (Onshore)
Position : QC Piping/Welding Inspector
Time Period : 10 April 2023 – 31 December 2023
Scope Job:
-Module Fabrication and Jacket
Standard used: AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Checking Fit-up, Visual Inspection and Reporting
Company : Saipem GPS (Global Petroprojects Services AG)
Project : Sakarya Gas Field Development Project
Client : Offshore Technology Center (OTC), Subsea 7 (SIA)
Vessel : CASTORO ONE
Location : Black Sea (Offshore)
Position : QC Welding Inspector
Time Period : 1 June 2022 – 30 November 2022
Scope Jobs:
-Welder Qualification Test C/S 16 inc WT 28.6 mm and C/S 10 inc WT 15.
-Pipeline installation C/S 16 inc WT 28.6 mm and C/S 10 inc WT 15 used process GMAW full automatic welding Main Line and GMAW and SAW for Combination Doble and Tripel Joint.
Standard used: API 1104
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Monitoring and filling report of the actual welding parameter in according to WPS.
Visual Inspection as per client specification.
Company : Oilfield Technical Inspection SDN BDH (OTI)
On behalf to : Nippon Steel Company Ltd
Project : EPCI of AWP-39, ARTHIT Phase 3D, G1/61 Phase 1A and G2/61 phase 1A
Client : PTTEP Exploration and Production Public Company ltd.
Vessel : DLB Kuroshio 1
Location : PT Nippon Steel Batam Yard (Onshore), Gulf of Thailand (Offshore)
Position : QC Piping/Welding Inspector
Time Period : 15 March 2020 – 20 October 2021
Scope Jobs:
-Running WPQT, WQT, Pipeline, Jacket, Platform, Riser and Spool, Bridges Installation.
Standard used: API 1104, AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Monitoring and filling report of the actual welding parameter in according to WPS.
Visual Inspection as per client specification.
Company : Saipem GPS (Global Petroprojects Services AG)
Project : Tangguh Expansion Project GPF EPCI, Zohr Field Development Project – ORU Phase, Provision of Oily Water System Upgrade – Sabratha Platform
Client : BP Berau ltd, PETROBEL, MELLITAH OIL AND Gas BV
Vessel : HILONG 106, CASTORO SEI, Safe Swift
Location : Bintuni Bay West Papua Indonesia (Offshore), Egypt Ocean (Offshore), Libyan Ocean (Offshore)
Position : QC Piping/Welding Inspector
Time Period : 26 June 2018 – 20 November 2019
Scope Jobs:
-Hook Up Development for Piping Installation (Materials: Carbon Steel, Inconel, Stainless Steel) Hydro Test as per Test Packet and Flange Management.
-Welder Qualification Test and Pipeline Installation for Carbon Steel 30 inc WT 38.7 mm.
-Jacket and Platform, Bridges Installation
-Pipeline installation CRA 24 inc WT 20.5 mm (17.5 mm API 5LD X65 QO FDU +3 mm UNS S31603, GMAW full automatic welding and IPW for root pass (internal welding).
Standard used: EEMUA 158, API 1104, ASME B31.3, AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Monitoring and filling report of the actual welding parameter in according to WPS.
Visual Inspection as per client specification.
Company : PT. Bureau Veritas Indonesia
On behalf to : YAMGAZ SNC (Consortium of Technip, Chiyoda and JGC)
Project : Yamal LNG Project
Client : YAMAL LNG
Contractor : YAMGAZ SNC
Location : PT. SOME Indonesia Yard (Onshore)
Position : QC Piping/Welding Inspector
Time Period : 1 May 2016 – 23 March 2017
Scope Job:
-Piping Installation for Carbon Steel, Inconel, Stainless Steel, Hydro Test per Packet.
Standard used: ASME B31.3, AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Conduct daily inspection for lay out and cutting, Fit-up, Visual inspection, dimensional, spool release activities prior to painting.
Review Visual report, NDT report, witness hardness test execution, positive material inspection, Magnetic Particle and Penetrant Test inspection.
Review and Piping line check inspection to ensure it comply both Engineering and Quality requirements, prepare are punch list, punch list cleaning on test package issued to subcontractor prior to release for testing.
Witness and inspection hydro testing and pneumatic test inspection to ensure that all requirements are meet the project specification standards.
Witness and inspection reinstatement and close out activities of piping system after completion of test as per approved drawing, specification and commissioning requirements.
Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.
Company : PT. Saipem Indonesia Karimun Branch
Project : Kaombo Project, Block 32 Offshore Angola
Client : Total E&P Angola
Location : Saipem Indonesia Karimun Branch Yard (Onshore)
Position : QC Piping/Welding Inspector
Time Period : 10 August 2015 – 9 February 2016
Scope Job:
-Module Fabrication (Block 32).
Standard used: AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Checking Fit-up and Visual Inspection.
Company : Sheffield Offshore Personnel Services Pte Ltd
On behalf to : Saipem Portugal Commercio Maritimo (SPCM)
Project : Ichthys Project – Gas Export Pipeline EPCI Contract
Client : Inpex Operations Australia
Contractor : Saipem Indonesia Karimun Branch (SIKB)
Location : Saipem Indonesia Karimun Branch Yard (Onshore)
Vessel : SEMAC 1
Position : QC Piping/Welding Inspector
Time Period : 23 March 2015 – 31 July 2015
Scope Job:
-Subsea Structures Mudmat, Counteract Fabrication, Sea Fastening and Welder Qualification Test (WQT).
Standard used: AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Checking report including material Mill Certification, consumable certificate, Welding Machine calibration, anything tools that its calibration has done, Visual report, NDT report.
Company : PT. PRIMA MITRANATA
Project : PROVISION OF KG & KF PLATFORM UNDERWATER INSPECTION AND PIPELINE SPAN INTERVENTION SERVICES
Client : STAR ENERGY (KAKAP) LTD
Vessel : MV HAILEY PRINCES
Location : NATUNA SEA KAKAP PLATFORM – INDONESIA (Offshore)
Position : ROV Report Coordinator
Time Period : 5 September 2014 – 19 November 2014
Scope Jobs:
-Under Water Inspection for Platform and pipeline.
Nature of work:
Compile record video and other data thru actual observation onboard.
Issued adequate document for company and client.
Finalize representing the final report for the company and client.
Company : Heerema Marine
Project : Helwin 2
Client : Tennet, Siemens
Contractor : Heerema Marine
Vessel : Heerema THIALF
Location : The Ocean area of German (Offshore)
Position : QC Piping/Welding Inspector
Time Period : 22 June 2014 – 29 July 2014
Scope Jobs:
-Topside and Bridge Installation.
Standard used: AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Monitoring and filling report of the actual welding parameter in according to WPS.
Checking Fit-up and Visual Inspection.
Company : Saipem S.A., Energies
Project : P55 SCR – MODULE 3 RONCADOR FIELD
Client : PRETROLEO BRASILIERO SA – PETROBRAS
Contractor : SAIPEM FDS 2
Vessel : SAIPEM FDS 2
Location : Northern area of Campos Basin (Brazil offshore)
Position : QC Piping/Welding Inspector
Time Period : 13 October 2013 – 29 December 2013
Scope Jobs:
-Welder Qualification Test GMAW full automatic for pipe line CRA (CS + Clad 3 mm).
Standard used: API 1104
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Checking report including material Mill Certification, consumable certificate, Welding Machine calibration, anything tools that its calibration has done, Visual report, NDT report.
Company : Swiber Offshore Construction Pte. Ltd.
Project : PRP 2 – Offshore Pipeline Installation; Zawtika Development Project Phase 1A; Provision of 16” Offshore Pipeline Installation
Client : Brunei Shell Petrolium; PTTEP International Ltd; Pertamina PHE WMO
Vessel : Swiber Resolute, Swiber Conquest, Swiber PJW 3000
Location : Coast of Brunei (Offshore); Asia World Port Terminal of Myanmar (Onshore); North Madura Sea of Indonesia (Offshore); Coast of Myanmar (Offshore)
Position : QC Welding Inspector
Time Period : 20 September 2012 – 3 August 2013
Scope Jobs:
-Pipeline, Jacket, Platform, Riser, Spool, Welding Pipeline Beachpull, Spool Fabrication.
Standard used: API 1104
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Monitoring and filling report of the actual welding parameter in according to WPS.
Visual Inspection as per client specification.
Company : Oilfield Technical Inspection SDN BDH (OTI); PT Samudera Oceaneering
On behalf to : Nippon Steel Company Ltd
Project : Chevron 2011 Installation Campaign; Arthit Field Development – Project Phase 1D (Pipeline); TOTAL South Mahakam Field Development–Project Phase 1&2
Client : Chevron Thailand Exploration and Production Ltd; PTTEP Exploration and Production Ltd; TOTAL E&P INDONESIE
Vessel : DLB Kuroshio 1, DLB Kuroshio 2
Location : Gulf of Thailand (Offshore), South Kalimantan Sea of Indonesia (Offshore); PT Nippon Steel Batam Yard (Onshore)
Position : QC Piping/Welding Inspector
Time Period : 18 November 2010 – 21 August 2012
Scope Jobs:
-Pipeline, Jacket, Platform, Riser and Spool Installation; Running WPQT, WQT.
Standard used: API 1104, AWS D1.1
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Monitoring and filling report of the actual welding parameter in according to WPS.
Visual Inspection as per client specification.
Company : PT MMI Indonesia
SubContactor : PT Batamec Shipyard Batam
Project : New Shipbuilding Fabrication
Location : PT Batamec Shipyard Batam Yard (Onshore)
Position : QC Piping/Welding Inspector
Time Period : 7 December 2008 – 5 October 2010
Scope Jobs:
-New Shipbuilding.
Standard used: AWS D1.1, DNV-OS-C101
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Checking Fit-up and Visual Inspection.
Company : Drydocks World Graha (PT GrahaTrisaka Industri)
Project : Jack Up Drilling Rig Fabrication
Client : Standar Drilling, Master Marine AS
Location : PT GrahaTrisaka Industri Batam Yard (Onshore)
Position : QC Piping/Welding Inspector
Time Period : 19 December 2006 – 25 November 2008
Scope Jobs:
-Running WPQT, Witness WQT, Inspection per RFI.
Standard used: AWS D1.1, ASME B3.3
Nature of work:
Review ITP, WPS, NDT procedure, Welder approval and other documents as approved by authorized.
Checking Fit-up and Visual Inspection.
Company : PT Jembo Energindo
Project : Supply of electrical energy
Client : PLN Batam
Location : PT Jembo Energindo Yard Batam
Position : Engine Driver/Mechanic
Period : 1 December 2003 – 01 December 2004
Scope Jobs:
-Supply of electrical energy with capacities 24 Megawatt from Diesel Power Plant.
Nature of work:
Record and check list the maintenance report every hour.
Helping technician if any problem.