Post Job Free

Resume

Sign in

Layout Design Piping

Location:
Mylapore, Tamil Nadu, 600004, India
Posted:
October 19, 2023

Contact this candidate

Resume:

BASKARAN A.R

Personal Data:-

Present Address

**/*, ********* ******,

Choolai, Chennai – 600112,

Tamil Nadu, India.

Permanent Address:

**/*, ********* ******,

Choolai, Chennai – 600112,

Tamil Nadu, India.

India Contact Numbers:

Mobile +91-944*******

Residence +91-44-438*****

Email:

ad0hnt@r.postjobfree.com

ad0hnt@r.postjobfree.com

Personal Details

Date of Birth : 20 May 1975

Sex : Male

Nationality : Indian

Marital Status : Married

Languages : Tamil, English, Hindi, German(Beginner)

Passport Details

Passport No. : Z6459680

Place of Issue : Abu Dhabi

Date of Issue : 06/03/2023

Date of Expiry : 05/03/2033

CAREER TO DATE

Total Experience : 20+ Years

Middle east Experience: 12 Years

Switzerland Experience: 1 Year

Profile

Overall 20+ Years of Experience in piping FEED and Detail engineering of Steam, Condensate, Water, Oil and gas piping.

Holding an Engineering degree in Mechanical from Bharathidasan University, Trichy, India. (1993- 1997)

Software Expertise

PDMS

Smart Plant Review

AutoCAD

PROBAD

Rohr2

CAE pipe

Caesar

MS office

Key Responsibilities

Plot Plan

Equipment Layout design

Piping Layouts design

BOQ of pipes and fittings of Carbon, Stainless and Alloy steel

Tie-in Index & Tie-in Isometrics

Demolition Layouts & Isometrics

Review of Vendor offers / Drawings

Isometric Drawings with Bill of Materials

Load details to Civil / IDC

Site Survey / Site Report preparation

Pipe Wall thickness calculations

Piping Design Documents - Piping Material Specification, Valve Data Sheet

Hydro Test Diagrams

Stress Analysis of piping

Pipe Support drawings

BOM

Working knowledge of Piping Standards – ASME B31.3, ASME B31.4, ASME B31.1, EN 13480

Saudi Aramco, SABIC, DEP (SHELL), SCHEM Standard

Organisation – I

REJLERS INTERNATIONAL ENGINEERING SOLUTIONS AB

Millennium Tower-13th Floor, Hamdan Street,

Abu Dhabi, United Arab Emirates (UAE).

Period: From September 2022 to April 2023 (8 months)

Designation: Senior Piping Engineer

Projects Handled:

1.Piping Detail Engineering for Replacement of Fire Water Ring Replacement at MOT (Fujairah) & MPS (Habshan) for ADNOC:

Detail engineering for Replacement of existing Fire Water Ring underground GRE piping to above ground Carbon Steel at MOT (Fujairah) & MPS (Habshan) for ADNOC

Design, Preparation and Review of

●Piping GAD’s

●Piping Layouts.

●Isometrics

●Pipe supports

●Clash resolution with TOPO survey and Site Survey team coordination

●Inter Discipline Coordination

●Participation in CRS Review with ADNOC

2.Piping Feasibility Study for Energy Reduction and Optimization at Ruwais Refinery for ADNOC:

To study the feasibility of Energy reduction & Optimization by recovering heat from Fractionator column, Diesel side stripper etc., and by adding turbines for power generation at Ruwais Refinery for ADNOC.

Feasibility study of various schemes and Preparation and Review of

●Unit plot plan

●Piping GAD’s with Tie-in’s & proposed routing

●Tie in Schedule

●Inter Discipline Coordination

●Participation in Review meeting with ADNOC

3.Select Study Galaxy Pipeline Project – Sales Gas Custody Transfer Flow Measurement System (CTMS) at Habshan & Asab Plant for ADNOC:

To perform select study to replace the existing Flow meters with new CTMS and to add new CTMS for accurate measurement of sales gas piping network at various facilities at Habshan 1, 2, 3, 4 & 5 and Asab 1 for ADNOC.

Select study of includes Preparation and Review of

●Unit plot plan with Location of New CTMS

●Piping GAD’s with Tie-in’s & proposed routing to CTMS

●Tie in Schedule

●Inter Discipline Coordination

●Participation in Review meeting with ADNOC

Organisation – III

Wood Group

ARENCO Tower

PO Box 127862, Dubai Media City

United Arab Emirates (UAE) Tel. 971-***-*****

Period: From May 2018 to May 2020 - (2 Years)

Designation: Area Lead Engineer – Piping

Projects Handled:

4.Piping Detail Engineering of Umm Qasr – Rehabilitation of All Trains, Storage and Export system piping @ Iraq for BGC-Shell:

Detail engineering of Umm Qasr – Rehabilitation of piping in All trains in Storage terminal and piping connected to Berth 1 & 2 of Marine Terminal at Iraq for BGC - Shell.

Design, Preparation and Review of

●Plot Plan

●Isometrics, Tie-in Isometrics

●Demolition Work Packs

●Pipe supports

●Site Survey Check lists

●Piping Inspection Plan for Existing Piping

●Inter Discipline Coordination

●Participation in Client Model Review

●Resolving Model Review Tags

Organisation – IV

SNC-Lavalin

PO Box 391499, Dubai

United Arab Emirates (UAE) Tel. +971-*-***-****

Period: From September 2014 to August 2017 - (3 Years)

Designation: Senior Engineer – Piping

Projects Handled:

5.Piping Detail Engineering of West Qurna I – DS8 & DS7 Desalter Project @ Iraq for Exxon Mobil:

Detail engineering of New Desalter for DS8 & DS7 – Train C at West Qurna, Iraq for Exxon Mobil, FOD (Field Operating Division)

Design, Preparation and Review of

●Plot Plan

●Equipment Layouts

●Piping Layouts

●Isometrics, Tie-in Isometrics

●Demolition Drawings

●Pipe supports

●Site Survey Check lists

●Work Packs for Piping Construction scope

●Inter Discipline interface

●Participation in Client Model Review

●Resolving Model Review Tags

6.Piping Major Tie-ins at West Qurna-I Iraq for Exxon Mobil – PMC2:

Design, Preparation and Review of PMC-2 - Major Tie-ins / Various Optional Scope of Work for DS6, DS7 & DS8 Degasing Stations at West Qurna I. Iraq.

●Plot Plan

●Piping Layouts

●Isometrics, Tie-in Isometrics

●Pipe Supports

●Inter Discipline interface

Organisation – V

Petrofac Saudi Arabia Co. Ltd,

PO Box 77378, Al-Khobar 31952

Kingdom of Saudi Arabia, Tel. +966-*-***-****

Period: From June 2013 to August 2014 - (1 Year & 2months)

Designation: Senior Engineer – Piping

Projects Handled:

7.Piping Detail Engineering of Jazan Tank farm @ Saudi Arabia for Saudi Aramco:

Detail engineering of Jazan Tank farm with 117 number of storage tanks piping inside and outside the dyke @ Jazan, Saudi Arabia.

Design, Preparation and Review of

●Plot Plan for tank farm

●Unit Plot Plan

●Nozzle orientation drawings

●Piping Layouts

●Dyke retention calculation

●Inter Discipline interface

●Participation in Client Model Review

●Resolving Model Review Tags

Organisation – VI

Saudi Arabian Kentz Co. Ltd, (SNC Lavalin)

PO Box 3462, Al-Khobar 31952

Kingdom of Saudi Arabia, Tel. +966-*-***-****

Period: From September 2010 to May 2013 - (2 Years and 8 months)

Designation: Senior Engineer – Piping

Projects Handled:

8.Piping Feed & Detail Engineering for Jubail Port Expansion -2 @ Saudi Arabia for SABTANK/SABIC:

Feed and Detail engineering for expansion of loading and unloading facility by means of loading arms, slope drums, loading pumps, reinjection pumps and piping for Berth 36 and Berth 37 @ Saudi Arabia - Jubail Port.

Design, Preparation and Review of

●Equipment Layouts at Main and Cellar Deck of Berths

●Piping Tie-In Isometrics, Tie-In Schedule and Demolition Layouts & Isometrics

●Piping layout for pipelines of Methanol, Mono Ethylene Glycol, LAO, Benzene, LAB, Styrene, VAM including slope drum reinjection and N2 piping.

●Bulk MTO

●Piping Construction Scope of Work

●Hydro Test Diagrams

9.Piping Detail Engineering for Nitrogen Compressor Saudi Basic Industries Corporation (SABIC) – at Yanbu - Saudi Arabia:

Detail engineering for the addition New Nitrogen (N2) Compressor at SABIC – NIGC plant, Yabnu, Saudi Arabia.

Design, Preparation and Review of

●Equipment Layouts

●Tie-In Isometrics and Tie-In Schedule

●Piping layout.

●Isometric drawings

●Bulk MTO

●Hydro Test Diagrams

●Piping Construction Scope of Work

10.Piping Detail Engineering for Transportation of Treated Water from Taif City to Maaden Mine Site - Saudi Arabia:

Transportation of treated water through GRE and GRP pipes for a distance of 430 kms as per ASME B31.4

Design, Preparation and Review of

●Equipment Layouts

●Piping layouts at Treated water plant, Master pumps station & at Mine site

●Isometric drawings

●Bulk MTO

●Valve Data sheets

●Hydro Test Diagrams

●Piping Construction Scope of Work

●Involved in preparation of Alignment sheets

11.Piping Feed Engineering of Crude Oil cross country pipeline project at IRAQ:

Crude Oil Transportation from TUBA Tank farm to FAO Tank farm for LUKOIL, Iraq. Total length of pipeline is 115 kms and design as per ASME B31.4

Design, Preparation and Review of

●Equipment Layouts

●Tie-In Isometrics and Tie-In Schedule

●Piping layouts at TUBA and FAO Tank farms

●Wall thickness calculation

●Bulk MTO

●Valve Data sheets

12.Feed Engineering of Vapor Recovery System at Jubail Industrial Port, Saudi Arabia:

Vapor recovery during loading of Naptha and MOGAS at berths 51 & 61 through vapor recovery system located at Tank Farm area for SASREF, Saudi Arabia.

Design, Preparation and Review of

●Equipment Layouts

●Tie-In Isometrics and Tie-In Schedule

●Piping layouts at Tank farm area, Berth 51 and Berth 61

●Wall thickness calculation

Organisation – VII

AE&E I.D.E.A (India) Pvt., LIMITED, (NA Group company of AE&E Austria)

No. 53, Greams Road, Chennai, Tamil Nadu, India

Period: From June 2004 to August 2010 - (6 years and 2 months)

Designation: Senior Principal Engineer - Piping

Projects Handled:

13.Piping Feed and Detail Engineering for Newhaven project @ UK:

20MW Power Plant (waste heat incinerator – 2 lines) located in New Haven – East Sussex, North Quay, United Kingdom – Veolia Environmental Services for VonRoll-Inova, Switzerland.

●Preparation and review of Piping layouts, Stress analysis (in Rohr2), wall thickness calculation (in PROBAD), Fabrication Isometric drawings, Notified Body documentation and Pipe support Engineering of completed Water Steam Cycle piping with European Code EN 13480

14.Piping Feed Engineering for Riverside project @ UK:

73 MW power plant (waste heat incinerator – 3 lines) located in South banks of River Thames, United Kingdom.

●Modeling of equipment’s and pipe routing in PDMS

15.Piping Detail Engineering for Stassfurt project in Germany:

19MW power plant (waste heat incinerator – 2 lines) located in Stassfurt, Germany for VonRoll Inova, Switzerland.

●Design, preparation and review of Piping layouts, Stress analysis (in Rohr2), wall thickness calculation (in PROBAD), Fabrication Isometric drawings, Notified Body documentation and Pipe support Engineering of completed Water Steam Cycle piping with European Code EN 13480

16.Piping Detail engineering of Klabin Paper Plant @ Brazil:

●Modeling of Equipments, Pipe routing in PDMS, Isometric generation and BOM for BABCOCK POWER ESPANA, SPAIN.

17.Piping Detail engineering of Utility piping for Heimdal project @ Norway:

●Preparation of Fabrication isometric drawings for Cooling water, fuel oil lines, dosing lines and other utility piping for Heimdal project in Norway for VonRoll Inova, Switzerland.

18.Gautami Power Limited -469 MW Combined Cycle Power Plant, AndraPradesh - for M/s. Alstom Power Limited., New Delhi.

●Design, Preparation and review of Piping layouts, Fabrication Isometric drawings and Pipe support Engineering of IBR and Non-IBR lines for the Boiler.

19.GVK Industries Limited - 228 MW Combined Cycle Power Plant, AndraPradesh - for M/s. Alstom Power Limited., New Delhi.

●Design, Preparation and review of Piping layouts, Fabrication Isometric drawings and Pipe support Engineering of IBR and Non-IBR lines for the Boiler.

Organization –VIII

Avant-Garde Engineers and Consultants Pvt. Ltd,

Porur, Chennai, Tamil Nadu, India

Period: From January 2001 to May 2004 - (3 years & 6 months)

Designation: Engineer - Piping

Projects Handled:

20.Aarti Steels Limited - 40 MW Captive Power Plant Cuttack, Orissa for M/s.Alstom Power India Limited, Vadodhara & for M/s. Aarti Steels

●Design, Preparation and review of Piping layouts, Stress analysis using CAESAR, Hanger engineering, Stress Isometric & Fabrication Isometric drawings of IBR and Non-IBR lines

21.Shri Doodhaganga Krishna Sahakari Sakkare Karkhane Niyamit - 20 MW Cogeneration Plant, Chikodi, Karnataka

●Design, Preparation and review of Piping layouts, Stress analysis using CAEPIPE & Stress Isometric drawings of IBR and Non-IBR lines

●Design and Preparation of Tenders, Review of offers and evaluation of following piping bought-outs such as Control Valves, De-Super heaters, Safety Valves, Butterfly Valves, Gate, Globe & Check Valves, Strainers.

22.Davengere Sugars Company Limited - 24.45MW Cogeneration Plant, Kuklawada, Karnataka for M/s. TDPS, Bangalore.

●Design, Preparation and review of Piping layouts, Stress isometric using CAEPIPE, Fabrication isometric drawings, Stress analysis of IBR and Non-IBR lines of Turbine Piping

Organization - IX:

Integral Coach Factory (ICF)

Perambur, Chennai, Tamil Nadu, India

Period: From 1999 to 2000

Designation: Graduate Apprentice

●Graduate Apprenticeship training for a period of one (1) year at Integral Coach Factory at Perambur, Chennai

Origination - X:

Elite Industries

Ambattur, Chennai, Tamil Nadu, India

(Manufactures of Precision Turned Components for Auto mobiles & Electrical Light and Heavy machinery Spares)

Period: From 1997 to 1999

Designation: Production Engineer

●Production supervision and Quality control

References:

Mr. Joys Samuel, Engineering Manager

Kent Engineering International Co. Ltd,

Al-Khobar, Kingdom of Saudi Arabia, Tel. +966-*-***-****, Mob. No.+966-***-***-***

Mr. Kamala Kannan, Lead Piping Engineer

Wood PLC, Arenco Tower, Dubai Media City.

United Arab Emirates (UAE) Tel. 971-***-*****

Mob. No.+971-*********

Place:

Date: A.R.BASKARAN



Contact this candidate