CURRICULUM VITAE
NAME : Venkata Rajgopala Acharyulu Gunturu
FATHER'S NAME : G.V.S.R. ACHARYULU
DATE OF BIRTH
Nationality
Indian
MARITAL STATUS : MARRIED
CONTACT NO : 094********, 097********,
LANGUAGES KNOWN : ENGLISH, HINDI, TELUGU, ORIYYA, KONKANI MOTHER TONGUE : TELUGU
E MAIL : ad0h6z@r.postjobfree.com
ADDRESS FOR
COMMUNICATION
: USDMA UDRP_AF
4th Floor DPM Towers
Ajabpur Khurdh Haridwar bypass road
Deharadun Uk India
EDUCATION
QUALIFICATION
Place of work
:
M.Sc.(Geology))
Deharadun
CURRICULUM VITAE
Present Employer:
UDRPAF-World Bank project
Last drawn CTC
Expected CTC
NABCON
:
: Rs2000000/-
Considerable % hike
Responsibilities with the present employer
Expertise in Himalyan Geology and Slopes and bridges buildings for Infrastructure and Development Programme Disaster response recovery with Geological and Geo- Technically Sound design and redesign for new projects. DPR analysis and technical reviews compliance with and Technoeconomical perspective with effective operational excellence. Execution and implementation in Uttrakhandh state slopes and bridges and irrigation and building works Environmental and water and hydrological design of slopes with meticulous approach.
Execution of Infra and educational projects and capacity building in Tribalwelfre Govt of AP
Previous employer : VEDANTA(Sesasterlite) Goa operations PattoPanjim Goa. Designation
Passport no
: Manager(Geology)
M3665947
Expected CTC : Negotiable
Reporting to : GM (Mines)
Reason for job change : More creative work with better prospects EDUCATION
QUALIFICATION
UNIVERSITY/
INSTITUTION
YEAR OF PASSING DIVISON
% OF
MARKS
M.Sc. (Geology) Andhra University 1993 First 66.06 E-commerce BI.TECH (Chennai) 2001 B-grade
B.Sc Andhra University 1990 First 62.20
Higher secondary IBE(A.P. State) 1986 Second 52
Secondary BSE(A.P. State) 1983 Second 50
Projects done in Geology, Geochemistry and Geotechnical domain. CURRICULUM VITAE
1. Exploration of Greenstone belts of BIF of Dharwar craton of GOA group. 2. Sukindachromites project (Orissa)(IRON ORE SERIES Group) 3. Omkareswar H.E project(M..P)(VINDHYAN BASIN)
4. Baglihar H.E project (J&K)(HIMALAYN PROVINCE)
5. Pre Cambrian Geology, Genesis Geochemistry of Borra Area(EASTREN GHAT MOBILE BELTS)(Visakhapatnam) as a part of Dissertation at PG level Details of projects in chronological order
CURRICULUM VITAE
COMPANY NAMES
OR STATE
ENTERPRISES
NAME OF
THE
PROJECT
CONTRACTER COST TYPE DURATIO
N
JOB
RESPONSOBILITY
Worldbank/USDMA UDRP_AF Uttrakhandh state
disaster recovery
(USDMA( funded by
World Bank
200
0crores
Geological
projects in slope
stability in
Himalayan terrains
4 years Landslide
mitigation and
slope stablisation,
bridge and river
protection work
and flood contorls
NABARD TMSU TSP
FOR TRIBAL
DEVELOPME
NT
NABARD FOR AP
STATE TRIBAL
DEVELOPMENT
CORPORATION
15000
CRORES
MINING AND
INFRA
,HYDROGEOLOGCI
AL DEVELOPMENT
2 years Infra projects and
roads
VEDANTA PLC MINING OF
IRON ORE
VEDANTAPLC LTD 500
CRORES
IRON ORE
SHIPMENT AND
EXPORT 100% EOU
11years MINING OF IRON
ORE
J&K STATE
GOVERNMENT AND
NHEPC
JAIPRAKASH
INDUSTRIES FROM
INDIA
BAGLIHAR
HYDROELEC
TRIC POWER
PROJECT
INDIA
JAIPRAKASH
INDUSTRIES FROM
INDIA
THE
ESTIMATED
COST OF
THE
SECOND
PHASE OF
THE
PROJECT
WAS RS
3,113.19
CROREs
MAJOR MEDIUM
IRRIGATION
PROJECT
CONCRETE
GRAVITY DAM
TWO
UNDERGROUND
POWERHOUSE
1 year GEOLOGICAL AND
GEOTECHNICAL
SUPPORT AND
MONITORING and
tunneling 3d
logging
Banihal railway
tunnel works j&k
MINISTRY OF
RAILWAYS
Banihal
railway
tunnel.
JAIPRAKASH
ASSOCIATES FROM
INDIA
500
CRORES
RAILWAY AND
ROAD NETWORKS
1 year GEOLOGICAL AND
GEOTECHNICAL
SUPPORT AND
MONITORING and
tunneling 3d
logging
MP STATE
GOVERNMENT AND
NHEPC
JAIPRAKASH
INDUSTRIES FROM
INDIA
OMKARESH
WAR
HYDROELEC
TRIC POWER
PROJECT
INDIA
JAIPRAKASH
INDUSTRIES FROM
INDIA
3539.16
CRORES
GRAVITY DAM 4 months GEOLOGICAL AND
GEOTECHNICAL
SUPPORT
MONITORING
KSHIJV DELHI
METRO
DELHI
METRO
HCC LTD 1000
CRORES
THE KUMAGAI-
SKANSKA-HCC-
ITOCHU GROUP
(KSHI JV), NEW
DELHI, EXECUTING
“DESIGN &
CONSTRUCT
CONTRACT MC1A
FROM VISHWA
VIDHYALAYA TO
ISBT” UNDER
DMRC (DELHI
METRO RAIL
CORPORATION)
WAS THE MAIN.
2YEARS GEOLOGICAL AND
GEOTECHNICAL
SUPPORT
MONITORING
CURRICULUM VITAE
FACOR ALLOYS LTD
MINING
CHROMITE
MINERAL
FACOR ALLOYS LTD 100
CRORES
WINING OF ORE
WINGING AND
RAZING
0.5 MT ANNULY
6 YEARS EXPLORATION OF
CHROMITE AND
STOPPING USING
SUBLEVEL
STOPPING
METHOD.
OPENCAST AND
UNDERGROUND
MINES
DEVELOPMENT
AND QUALITY
CONTROL
20 years
Experience in Chronological employment
Name of the employer Date of
joining
Date of
leaving
Designation Duration in
years
World Bank/USDMA 1.08.2019 AS ON DATE Project Geologist For roads,
irrigation, slopes
and bridges and
buildings
15 months
NABARD CONSULTANCY 1.01.2017 1.08.2019 PROJECT
DISTRICT
CORDINATOR IN
MINING GEOLOGY
,INFR AND
HYDROGGEOLGY
2
VEDANTA(Sesasterlite) 29-05-2007 30.12.2016 Manager(geology) 11years 5 months
Jai Prakash Associates 12-02-2006 29-05-2007 Senior Geologist 1 year 3months
KSHI_JV(Delhi Metro) 27-09-2004 12-02-2006 Senior Geologist 1 year 5 months
Miracle Software
Systems(Systems
Integration Company)
5.05.2003 27.09.2004 Account manager
(Sales)
1year
Ferro Alloys
Corporation(Steel And
Ferro alloys)
20-03-1997
5.05.2003 Senior Geologist 6 years
Vedanta group (Sesa Sterlite (Panjim, Goa)
CURRICULUM VITAE
GEOLOGICAL EXPLORATION
1. Mine head to Beneficiation plants Shipments and quality quantity control activities. 2. Monthly and yearly Geological survey grade control and reconciliation. 3. Preparation of plans and sections
4. Estimation of Reserves.
5. Exploring sampling, Interpreting mapping the Geology of mine 6. Preparing presenting quality level of ore produced for reserves estimation 7. Conducting grade control from production to shipments 8. Mine Handling
9. Plant Performance
10. Mine Handling
11. Plant Performance
12. Monthly and yearly Geological survey grade control and reconciliation. Preparation of Plans and sections Estimation
of Reserves. Exploring sampling, Interpreting mapping the Geology of mine Preparing presenting quality level of ore produced for reserves estimation 13. Conducting grade control from production to shipments 14. Filtration Rheology Slurry Flocculation & Settling Transportable Moisture Limit
(TML)
15. Attritioning Blending Bulk Density
16. Beneficiation – Gravity, Magnetic, Flotation Bulk Density/Apparent Relative Density/True SG Davis Tube Recovery (DTR) Davis Tube Separation versus Grind Size Ericson Cone Heavy Media Separation
17. Cyclone Separation Dense Media Separation (DMS) Ericson Cone Heavy Media Separation Falcon Concentrator Heavy Liquid Separation (HLS) 18. Mine Handling
19. Plant Performance
20. Transport
21. Barge Loading
22. Steamer. Grade wise Stock Position
Stock position of ROM(Crude, Marginal &Sub grade Ore) & Finished Ore (Fines & Lumps)
23. Sales, Cargo preparation letter from marketing Dept. 24. Vessel loading program.
25. Preparation of Contribution Plan.
26. Preparation of Blending plan
27. Barge loading & monitoring the steamer quality as per contract specification 28. Mapped face positions on daily basis
•
29. Enhancing operation performance and maximize ore body recovery. CURRICULUM VITAE
30. Created MS Excel/acquire records of lithologies intersected during line mapping of pit floor and faces
31. •Captured lithology and structural data as polygons with SURPAC 32. •Updated geology map for every mined bench.
•Created 2D cross-sections through benches to trace structures and lithology
•Liaise with mining engineers to discuss position of all structural features to be utilized in blast pattern design.
33. •Liaise with Mineral Resource Geologist for update of geology models.
•Liaise Exploration Geologists during the near mine exploration
•Ensuring full ISO 9001:2008,OHSAS18001 and ISO14001 compliance during mining and grade control activities
JaiprakashAssociates(JAL)
Project Geologist:
Foundation mapping, Slope Mapping,Geo-technical support systems, Rock bolts, Execution of Tunneling works for underground and opencast power project in dams sites. Geological Execution and Mapping and Tunneling, Blasting, Rock-Bolting, Foundation. Mapping, Slope Mapping and 3 D Logging. For underground tunneling works and implementation of NATAM(New Austrian tunneling methods), Norwaingn Tunneling methods. KSHIJV Delhi Metro:
Geologist (Support Systems)
Geotechnical monitoring and instrumentation with support systems ground conditions, underground water levels, tilt and settlement of nearby buildings or other structures of interest in the vicinity of the tunnel alignment. Instrumentation monitoring for metro railway tunnels includes monitoring of the structures under construction together with the ground, buildings and other facilities within the predicted zone of influence. Furthermore, instrumentation and subway tunnels in and around them increase accuracy of the different layers of the earth and excavation of the surrounding structures and make safety and accuracy.
Miracle software systems
Inside and outside GIS software sales and software implementation and system integration
Ferro Alloys Corporation (KuansBhadhrak, chrome ore division )6years from (1997to 2003) Exposure to work and jobs handled in Under Ground and Open cast mines information 1. Review of exploration programs
2. Valuation of exploration properties
3. Proprietary system to analyze mineral exploration performance –Preparation of Independent Geologist’s and Independent Technical Reports 4. Geological modeling and underground Geotechnical instrumentation. CURRICULUM VITAE
5. Quality Control activity from mine head to Beneficiation plants Shipments and quality quantity control activities.
6. Selection of underground mining method slope stability evaluvation. 7. Pit optimization and Geotechnialoveriview of the projects 8. Owner versus contractor comparison
9. Ventilation surveys and studies
10. Backfill system design and optimization
11. Waste dump management
12. Design and review of exploration drilling programs 13. Geological modeling
14. Resource and reserve estimates, reviews and audits 15. Scoping, pre-feasibility and feasibility studies 16. Planning, design, scheduling, optimization and simulation 17. Geotechnical investigations, reviews and support design 18. Technical expert reports, due diligence reviews and valuations 19. Expert witness assignments
20. Evaluation of mining concepts, mining methods and production rates
• Technical expert reports, due diligence reviews and valuations 21. Expert Witness Service straining
•
• Design and review of exploration drilling programs• 22. .
Training Certificates:
GIS certification For mapping accuracy and Evaluvation of water and geotechnical and slope stability studies
OSHAS certification Safety standards 1800:2007
Environmental Management systems of ISO certification 9001.2008 Quality Management Systems ISO certification 1400.2004 Qualtiy audits certificates for Accredition ISO 17025 Slope stability software’s certification
SOFTWARE PROFICIENCY:
a. E-commerce and Enterprise Software
CURRICULUM VITAE
b. Exposure to latest software technologies, C++, Java, Adv Java, Oracle, HTML, DHTML, Java script.GIS,ArcGIS, Concepts of Database Management Systems
c. Introduction and Overview of GIS – Part I & II
d. Introduction to Remote Sensing
e. Overview of ARC GIS
f. Metadata and GIS
g. Introduction to Geostatistics
h. Geodatabase Design Concepts, Distributed GIS – Internet GIS Applications i. Introduction to web GIS - Bhuvan
j. Customizing in GIS with Visual Basic
k. Customizations in GIS (OOPS, Scripting)
Role of GIS in Groundwater Prospecting – Water Quality aspects Membership: AMGI,(MGMI),NRSA
G V R ACHARYULU
Station :Deharadun
Date:18.03..2023