● Charles Bradley Dover
Calhoun, TN 37309
ad0gox@r.postjobfree.com
Education
Chattanooga State Community College
Diploma: Associate of Applied Science: Engineering Systems Technology
Certificate: Electrical Instrumentation Controls
Graduation Date: December 2014
GPA: 3.4/4.0
Cleveland State Community College
Concentration: Pre-Engineering
Dates Attended: August 2003-December 2004
Relevant
NFPA 70E Certification, Auto Cad, Supervisory Management, Process Controls, Computers in
Courses
Engineering, Industrial Safety, Digital Circuits, PLC’s (Allen-Bradley and Siemens), Binary Logic, Electric Motor Control Circuitry
Class
Projects
Allen-Bradley PLC : Assembled a three-station mechanical laboratory
trainer. Mapped out inputs/outputs and wrote a
complete program for the PLC that integrated
all three stations for operation.
Siemens PLC: Mapped out a pre-assembled
lab station for inputs and outputs. Wrote a
complex program to incorporate robots into
the operation.
Binary Logic and Control Circuitry: Built a four button-two switch pendent for the Allen-Bradley automation labs. Drew schematics, assembled the pendent case, and wired the buttons and switches.
Experience.
Multi-Craft Maintenance Technician June 2017-Present
Mueller Company
Chattanooga, TN 37406
●Maintain 4 induction furnaces by following a preventative maintenance plan
●Repair of breakdowns on furnaces, shot blast machines, powder coating booths, machine shop, and assembly
●Repair and rebuild of ballscrew/servo items and hydraulics on CNC lathes
●Welding, fabricating, pneumatics, hydraulics, electrical, and some pipe fitting are all skills that must be used at this position
Millwright Maintenance Oct. 2015-Jan. 2017
Columbus McKinnon
Chattanooga, TN 37406
●Emergency repairs during production runs
●Electrical troubleshooting of 480 volt cabinets for faults
●Welding of equipment and tooling (MIG/stick)
●Fabrication of guards and necessary parts
●Maintain maintenance logs with bench mate
Millwright Maintenance June 2015- October 2015
Aerotek recruiting
Columbus McKinnon
Chattanooga, TN 37406
●Emergency repairs during production runs
●Electrical troubleshooting of 480 volt cabinets for faults
●Welding of equipment and tooling (MIG/stick)
●Fabrication of guards and necessary parts
Multi-Craft Maintenance Tech. April 2015- June 2015
Aerotek recruiting continued
Denso Corporation
Athens, TN 37406
●Removal/replacement of contactors, safety relays, and controllers
●Teaching robot point to point placement
●Utilizing PLC’s program to troubleshoot issues with equipment
●Motor and pump removal/installation
CMMS utilizing SAP R/3
Machine Set-Up Technician February 2015- March 2015
Woodbridge Formed Plastics
Chattanooga, TN 37406
●Installation and removal of tooling from presses
●Emergency repair of presses during production
●Tooling set-up and repair
●Maintena
Order Picker October 2011- February 2012
Integrity Staffing (Amazon.com)
Charleston, TN 37310
●Picked items from warehouse racks to complete orders
●Operated a cherry picker and stand-up forklift (certified on both)
●Maintained 100+ percent after the second week
Maintenance Mechanic June 2006- August 2009
International Paper
Cleveland, TN 37311
●Corrugator preventative maintenance as assigned weekly coupled with any break-down issues that arise during production runs
●Maintained all lubrication for the entire facility
●Ordered all lubrication supplies and air equipment
●Rebuilt ink pumps, air equipment (regulators, oilers, and separators), and automatic greasers
●Constructed grease manifolds for remote grease lines (cut lubrication time by two-thirds) on Corrugator
●Performed PM duties on designated equipment (weekly)
●Completed repairs on equipment break downs during operation
●Assigned to a corrective action team to solve issues associated with equipment
Steel Press/Injection Molding Tech. April 1994- July 2003
Duracell USA
Cleveland, TN 37312
●Operated Redicon, Bruderer, and dual- feed steel presses
●Recorded all quality audits into the InfinityQS system
●Executed equipment change-overs and first piece samples for Quality Control
●Assigned to an equipment/material qualification team for new equipment and material
●Injection molding press operator/set-up technician (3 yrs)
Additional
Computer Knowledge: RSLinx, Studio 5000 (Allen-Bradley), SIMATIC S7
Information
(Siemens), Microsoft Word, Excel, and PowerPoint