Post Job Free

Resume

Sign in

Quantity Surveyor Civil Engineering

Location:
Saudi Arabia, Dakahlia, Egypt
Salary:
30000 SAR
Posted:
October 18, 2023

Contact this candidate

Resume:

CURRICULAM VITAE

Proposed Position : Quantity Surveyor

Name : Muhammad Asghar Khan

F/ Name : Muhammad Afsar Khan

Nationality : Pakistani

Profession : Engineer

Date of Birth : 01.04.1974

Years of Experience : 23 Years (15 years in Gulf and 8 years in Pakistan)

Religion : Islam

Passport # : WN 4105533

Iqama Status : Transferable

Marital Status : Married

Contact # : 006*-*********

E- Mail Address : ad0f1r@r.postjobfree.com

Membership : Saudi Engineering Council (Valid))

Approvals : Approved from Dubai Sports City (UAE)

: Approved from Jeddah AMANA (KSA)

: Approved from RCRC, Riyadh Metro (KSA)

: Approved from (LREDC) Lusail City (Qatar)

: Approved from RCRC, Green Riyadh (KSA)

Driving License : Saudi Arabia (Valid)

KEY QUALIFICATIONS:

Mr. Muhammad Asghar Khan has more than 23 years’ experience mostly of Roads, Civil, infrastructures, Metro and Canal Projects for clients, consultants and contractors in Pakistan, UAE and KSA.

Working on lump sum,re-measurement and Design and Build Projects. Involved in dispute on new rates between the client and contractoe, computation of quantities, updating of BOQ’s, preparation of Variation Order, Preliminary and Final Handover, and rate analysis of various items and full account of the project within stipulated time limit, attend the projects meeting, provide data for monthly progress reports to Planning department. Provide technical engineering support including updates of project status, correspondence to the Client/Consultant and Contractors, constructions, and estimates. And perform various roles including managing the costs and finances of a project, calculating quantities and other related QS tasks.

PROFESSIONAL EDUCATION:

Bachelor of Technology in Civil Engineering from Al-Khair University (AJK) – 2011.

Diploma in Civil Engineering, Govt. College of Technology, Rasul (Lahore Board Punjab) -1994

COMPUTER SKILLS:

Proficient in Computer Applications: Aconex, Shared Point, (Windows XP/Microsoft Office Applications: MS Word & MS Excel & AutoCAD.

EXPERIENCE RECORD:

June, 2023 – up to Present : Saudi Arabian Parsons Ltd, Riyadh, K.S.A.

Position : Quantity Surveyor

Project Name : Green Riyadh

Consultancy Cost of Project : SAR 90 Million

Construction Cost of Project : SAR 3,438 Million

Responsibilities : Duties detailed as follows:

Working with Parsons as a Quantity Surveyor Green Riyadh and the current role being QS are 1. Interim Payment Certificate 2. Preparation of Change Request 3. Assessment of cost and preparation of Variation Order 4. Maintain of changes 5.IPA logs 6. Cost look heads 7. Estimate of completion with the re-measurement contract

Worked Article/Clauses follow by the Construction Law under the Islamic/Sharia Law Legal System in Saudi Arabia.

Prepares and summarizes the bases of estimate (BOE) development, including estimate scope, estimate method of development, pricing utilized, labor, material and equipment rates included in the estimate, assumptions and exclusions, escalation, parametric comparisons using previous estimate data from similar projects, estimate quality control (QC) review and results, and estimate conclusion and recommendation.

Prepare new rate is a similar item from an existing BOQ with derived by pro rating, interpolating, market rates and quotations are required from market and on new rates between the client and contractor successfully negotiated.

Prepare of earned value reports.

Participate, record, and assist in the preparation of the progress meetings.

Prepare and analysis project costing for tenders, such as materials, quantities, labor and time.

To visit site periodically, communicating with the Contract Manager for progress and variations.

Check & review contractor quantities/work done at the end of the month for the monthly progress report and Monthly Payment Certificates.

Providing advice on contractual claims.

Analyzing outcomes and writing detailed progress reports.

Valuing completed work and arranging payments.

The works under RCRC projects comprises the construction.

Jan, 2023 – May, 2023 : Associated Consultancy, Pakistan.

Position : Quantity Surveyor

Project Name : Dualization of Mardan–Swabi Road

Consultancy Cost of Project : US Dollars $ 5 Million

Construction Cost of Project : US Dollars $ 75 Million

Responsibilities : Duties detailed as follows:

Working with ACC as a Quantity Surveyor Roads & Civil, involve in the quantity take-off.

To visit site periodically, communicating with the Construction Manager Progress and variations.

Manages all costs relating to civil engineering projects, from the initial calculations to the final figures.

Check quantities/work done at the end of the month.

Preparing & Review of Monthly & Final Payment Certificates.

Preparing & Review of Revised BOQ comparison to original BOQ.

Preparing & Review Monthly Financial Reports.

To continuously update the estimate of the final contract value.

Providing advice on contractual claims.

Preparing & analyzing outcomes and writing detailed progress reports.

Preparing & Valuing completed work and arranging payments.

Jan, 2022 – Dec, 2022 : Dorsch Consultant Qatar

Position : Quantity Surveyor/Estimator

Project Name : LUSAIL CITY. CP7C-1A, CP7C-1B & CP07B

Client : LREDC (Lusail Real Estate Development Company)

Responsibilities : Duties detailed as follows:

Working with Dorsch as a Quantity Surveyor Roads & Civil, involve in the quantity take-off.

To visit site periodically, communicating with the Construction Manager Progress and variations.

Manages all costs relating to civil engineering projects, from the initial calculations to the final figures.

Prepares material takeoffs on pre-construction assigned contracts, projects, or programs from engineering drawings, plans, and specifications.

Prepares to perform standard estimating activities typical to the engineering and construction industry is required.

Prepares & Review of Monthly & Final Payment Certificates.

Prepares & Review of Revised BOQ comparison to original BOQ.

Preparing Monthly Financial Reports.

To continuously update the estimate of the final contract value.

Preparing a complete and comprehensive estimate of probable cost based on the proposed contract documents inclusive of contract terms and conditions.

Providing advice on contractual claims.

Analyzing outcomes and writing detailed progress reports.

Valuing completed work and arranging payments.

June, 2015 – Oct, 2021 : WSP, Riyadh, K.S.A.

Position : Quantity Surveyor

Project Name : Riyadh Metro

Consultancy Cost of Project : US Dollars $ 265 Million

Construction Cost of Project : US Dollars $ 7.89 Billon

Responsibilities : Duties detailed as follows:

Working with WSP as a Quantity Surveyor Riyadh Metro Line 5 (Green Line) and the current role being QS are 1. Interim Payment Certificate 2. Preparation of Change Request 3. Assiment of cost and preparation of Variation Order 4. Maintain of changes 5.IPA logs 6. Cost look heads 7. Estimate of completion with the Design and build lump sum contract.

Worked Article/Clauses follow by the Construction Law under the Islamic/Sharia Law Legal System in Saudi Arabia.

Prepares and summarizes the bases of estimate (BOE) development, including estimate scope, estimate method of development, pricing utilized, labor, material and equipment rates included in the estimate, assumptions and exclusions, escalation, parametric comparisons using previous estimate data from similar projects, estimate quality control (QC) review and results, and estimate conclusion and recommendation.

Prepare new rate is a similar item from an existing BOQ with derived by pro rating, interpolating, market rates and quotations are required from market and on new rates between the client and contractor successfully negotiated.

Prepare of earned value reports.

Participate, record, and assist in the preparation of the progress meetings.

Prepare and analysis project costing for tenders, such as materials, quantities, labor and time.

To visit site periodically, communicating with the Contract Manager for progress and variations.

Check & review contractor quantities/work done at the end of the month for the monthly progress report and Monthly Payment Certificates.

Providing advice on contractual claims.

Analyzing outcomes and writing detailed progress reports.

Valuing completed work and arranging payments.

The works under RCRC projects comprises the construction.

Feb, 2012 – Feb, 2015 : Saudi Arabian Parsons Ltd, Jeddah, K.S.A.

Position : Lead. Quantity Surveyor (Roads & Civil)

Project Name : CMS/Jeddah

Consultancy Cost of Project : SAR 250 Million

Construction Cost of Project : SAR 1,275 Million

Responsibilities : Duties detailed as follows:

Working with SAPL as a Quantity Surveyor Roads & Civil, involve assisting to Construction Manager and Commercial Manager in leading and delivery of all aspects of quantity surveying from inception of a project to completion.

To visit site periodically, communicating with the Construction Manager Progress and variations.

Manages all costs relating to civil engineering projects, from the initial calculations to the final figures.

Check quantities/work done at the end of the month.

Assists the Estimating Leads for historical data and estimate database management with the accumulation, evaluation, and documentation of cost data retrieved from completed discrete design and/or construction contracts, inclusive of work activity, delivery means and methods, productivity, activity durations, supervision, and craft man-hour utilization.

Prepares & Review of Monthly & Final Payment Certificates.

Prepares & Review of Revised BOQ comparison to original BOQ.

Preparing Monthly Financial Reports.

To continuously update the estimate of the final contract value.

Providing advice on contractual claims.

Analyzing outcomes and writing detailed progress reports.

Valuing completed work and arranging payments.

The works under Jeddah Municipality projects comprises the construction of Jeddah.

July, 2008 – Dec, 2011 : M/s Khatib & Alami Consultant’s, Dubai, U.A.E.

Position : Quantity Surveyor

Project Name : Dubai Sports City

Consultancy Cost of Project : DH 72 Million

Construction Cost of Project : DH 365 Million

Responsibilities : Duties detailed as follows:

Working with Khatib & Alami as a Quantity Surveyor, involve in the quantity take-off.

To correspond and meet with the client and team liaison on a regular basis to ensure valuations are update and the final account.

Prepares & verify the steel reinforcement stock on site and keep records up to date.

Coordination meeting with client/contractor.

Manages all costs relating to civil engineering projects, from the initial calculations to the final figures.

Progress meeting with client/Engineer.

To re-measure works as required.

To measure and value new rates and variations.

To oversee the monitoring of labour, materials`, plant and formwork.

Follow works as per FIDIC conditions of contracts & CESMM methods of measurement.

The Road & infrastructure works for Dubai Sports City comprises the construction, including, Bridge and Filtration Room, Cricket Stadium.

March, 2006 – May, 2008 : A.A.Al Khodari Sons Company, K.S.A.

Position : Quantity Surveyor

Project Name : MOT

Consultancy Cost of Project : SAR 62 Million

Construction Cost of Project : SAR 475 Million

Responsibilities : Duties detailed as follows:

Have a clear understanding of, and ability to work with, construction contract commercial documents, drawings, and specifications.

Floating Cross -Section in Soft Ware Earth Work Program.

Calculate Concrete Quantity & make Bar Bending Schedule for Bridges, Box culverts, and Pipe culverts.

Preparation of Monthly Payments Certificate’s & Submission to Consultants Preparation of shop drawings & submission to Consultant for Approval.

Preparation of Monthly Progress & Daily Progress Reports.

Prepare a Survey Sheet for Request form and Submitted to Consultants.

Nov, 2002 – Feb, 2006 : Khyber Consulting Eng. International, Pakistan

Position : Quantity Surveyor

Project Name : FHA

Consultancy Cost of Project : RS 67 Million

Construction Cost of Project : RS 400 Million

Responsibilities : Duties detailed as follows:

Road from Chakdra to Landaki Road Project.

Responsibilities include Quantity estimation, rate analysis, and Non BOQ items.

Preparation of Engineer's estimates and preparation of Reports for different projects.

Valuations of monthly payment certificate.

Preparation of Monthly Progress Reports.

May, 2000 – Oct, 2002 : SAPAC Construction Co, K.S.A.

Position : Quantity Surveyor

Project Name : MOT

Consultancy Cost of Project : SAR 55 Million

Construction Cost of Project : SAR 355 Million

Responsibilities : Duties detailed as follows:

Worked on Dualization of Arar- Turaif Highway Project.

Preparation of Bar Bending Schedule, and Calculate concrete quantities for Bridges, Box Culverts. Floating Cross - Section in AutoCAD.

Calculate Quantity of Concrete & Pavements etc.

Preparation of IPC & Submission to Consultants.

Preparation of shop drawings & submission to Consultant for Approval.

Oct, 1996 – Feb, 2000 : Swabi Scarp Consultant, Pakistan

Position : Quantity Surveyor/ Sub-Engineer

Project Name : SSC

Consultancy Cost of Project : RS 76 Million

Construction Cost of Project : RS 850 Million

Responsibilities : Duties detailed as follows:

Working on Canal Road, Construction of new Bridges, Cross regulator, head regulator, and Crum weir concerts Lining Earthworks.

Responsible for Checking of quality control, Monthly Interim Payment Certificate.

Preparation of Monthly & Daily Progress Reports.

Preparation of Shop Drawings, As built Drawings, Variation Orders.

Dec, 1994 – Sep, 1996 : M/s Gitec-Rsl Joint Venture, Pakistan

Position : Quantity Surveyor/ Site Engineer

Project Name : SSC

Consultancy Cost of Project : RS 15 Million

Construction Cost of Project : RS 140 Million

Responsibilities : Duties detailed as follows:

Supervised the construction of Service Road along with the canal 50 KM.

In- charge of bridges, cross regulator, head regulator, and Crump weir concrete lining.

Quantities estimation, site supervision, material checking, quality control and preparation of progress reports.

LANGUAGE CAPABILITY Speaking Reading Writing

English Good Good Good

Urdu Excellent Excellent Excellent

Pashto Excellent Good Good

Arabic Good Excellent Good



Contact this candidate