ENGINEER E&I specialist
Graduate Diploma: in June 1995 - Engineer in Instrumentation
Educational Qualification: SSC in June1995.
Training:
permit work course and Safety Inductions.
www.linkedin.com/in/********@*****.**
Career Summary:
Over 20 years experience in Instrumentation Oil filed projects, LNG (Gas plant), Petrochemical, Chemical plant Gas plant., maintenance, plant construction, Commissioning & Start-up assistance.
Calibration & repairs of various pneumatic and electronic field Instruments, Loop checks & Function test on Honeywell PKS C300,Honeywell TDC3000,Honeywell TPS System, DETA V Yokogawa Centum CS 1000 DCS & Bentley Nevada System. Able to read all applicable drawings including P&ID, Loop Sheets, Cable schedule, JB wiring Instrument Location & Instrument Hookup drawings, Instrument data sheets.
Responsibilities:
-Maintaining all safety aspects both at site and offices as per company HSE policy
-Knowledge for safe use of all tools and test equipment commonly used for industrial electrical installations.
- follow and fill up the daily inspection, according with quality team
- Classification of all inspection already done
- Verification of inspection form, using QCP and ITP Cods…
-Coordinate with clients and carrying timely inspection of construction activities with Client
-Preparation of documents from project data base, daily job planning, coordinate with sub-contractors, client representative and equipment vendor.
-Raise request for inspection letter (RFI) for all those activities which are mentioned in approved ITP as hold point and witness points...
-Carrying out Vendor / Material Inspection
-Inspection & Witnessing of SCADA, PLC, ESD & DCS Systems. and Gas Alarm System
-Pre-inspection, Installation inspection, Final inspection
-responsible for witnessing combined instrument loop check, commissioning at all instrument
-Commissioning of Fire gas detectors and smoke detectors
-Responsible for the calibration of all type process instrumentation Switches, Pressure Gauges, Sensors
-Assist the calibration of automatic valves. And ESDV, BDV valves and Control Valves and On-Off Valves
-Assist of calibration of instruments PG TT LT PT..
-Insulation Resistance test, continuity of power, control & Instrument cables before pulling and after installation (Mugger/ hi put)
-Supervising and testing the installation
-Cable tray supervision
- Dielectric test
- Inspection of the carcass paint condition
- inspection Auxiliary transformers
- Inspections pump and cooling system NORIA
-Inspection auxiliaries cabinets
-Hit tracing inspections
-Main transformer inspection
-HVAC system inspections
-Electrical connection test, and processes connection test
-loops required for inspection final acceptance
-Site Acceptance Test (SAT)
-Fire and gas detectors inspections
-Good use for P&ID plan and instrument HOOK UP details and isometric plan
-Good use for QCP (Quality Control Plan)
PROFESSIONAL EXPERIENCE:
01)-Employer :maire Tecnemont at REDMED hassi messaoud houd elhamra ZCINA
Client maire Tecnemont at REDMED
Designation : board operator DCS
From :01/07/2022to at this day
JOB RESPONTIESSIBLI
Utility and CPF
Starting and stooping all compressor air and package dryer
Starting and stooping package nitrogen and compressor nitrogen
Loop check simulation Open close all serial valve and all serial instrument
02)-Employer :maire Tecnemont at Cevielec hassi messaoud houd elhamra ZCINA
Client maire Tecnemont at Cevielec
Designation :instrumentation supervisor
From :01/06/2021to at 31/12/2022
JOB RESPONTIESSIBLI
Installation all support junction box and junction box support instruments and instruments support detector FGS.
Pulling cables primary and secondary. Installation cables tray secondary and primary
Glandage all cable secondary and primary. Daily reports situation in for all Installation.
Collaboration for technician in laboratory for calibration all equipment instrument and all
Valve control and valve ESD and BDV
03)-Employer :GJC hassi messaoud south satellit
Client :Solunel / GJC revemping project
Designation :instrumentation supervisor commissioning
From :22/11/2020 to 31/03/2021
JOB RESPONSIBILITY
various troubles shooting to Pressure transmitter, D.P.T Flow transmitters, Temperature transmitter, Level transmitter, Control valve, Switches and etc.
Repair and overhauling of Control valves and positioner calibration and stock check.
Operators DCS, Loop check & commissioning & fonctionnel test for FGS and ESD field Instruments. Involved in continuity checking, simulation & pre commissioning Trouble shooting of new loop and Modification of internal panel activity. wiring.
04)-Employer :Bonatti at sarl Cofeed
Client :Cofeed agrifood project in mohammadia mascara
Designation :instrumentation engineer
From :15/03/2020 to 10/11/2020
JOB RESPONSIBILITY
Installation cable tray junction box instrument, pulling main cable and branch cable.
Insulation Resistance test, continuity of power, control & Instrument cables before pulling
05)- Employer : Bonatti at AKKA TECHNOLOGIE
Client : GTIM groupement Timimoun
Designation : Coordinate commissioning WELL PAD
From : 01/08/2019 at 28/02/2020
JOB RESPONSIBILITY
loop check and functional tests Site Acceptance test (sat) for panel (RTU ) inprotec
Site acceptance test (sat) for well head control panel at prove
Site acceptance test (sat) corrosion inhibitor injection
Site acceptance test (sat) solar power system functional tests
Logique diagramme fonctionnel test ESD 1/2/3
06) Employer : ANSALDO ENERGIA ( RINA )
Client : KDM & SPE power plant project HMD
Designation : Elec & inst QC
From : 15/11/2014 at 10/05/2017
JOB RESPONSIBILITY
QC Elec & instruments, inspection & Control on site,. Doing inspection of Equipment & materials, with the present of Client as per the specification & Standards also require all certificates
-Maintaining all safety aspects both at site and offices as per company HSE policy
-Knowledge for safe use of all tools and test equipment commonly used for industrial electrical installations.
- follow and fill up the daily inspection, according with quality team
- Classification of all inspection already done
- Verification of inspection form, using QCP and ITP Cods…
-Coordinate with clients and carrying timely inspection of construction activities with Client
-Preparation of documents from project data base, daily job planning, coordinate with sub contractors, client representative and equipment vendor.
…
07) Employer : ANSALDO ENERGIA
Client : SPE renovation
Designation : supervisor in Instrumentation (commissioning & maintenance)
From : 01/04/2013 to 15/07/2014
JOB RESPONSIBILITY
Co- operation with operation, preparing equipment for maintenance.
Field modification, Fault Diagnosis & Trouble shooting.
Safety preparation (job Distribution, Safety talk, Tool box Talk, Permit Authorization etc.) .
Good experience in all type of electronic instruments also calibration, commissioning
Experienced in various troubles shooting to Pressure transmitter, D.P.T Flow transmitters, Temperature transmitter, Level transmitter, Control valve, Switches and etc.
Repair and overhauling of Control valves and positioner calibration and stock check.
Loop check & commissioning of field Instruments. Involved in continuity checking, simulation & pre commissioning activity. Trouble shooting of new loop and Modification of internal panel wiring.
08) Employer : MLE project bloc 4005
Client : Saipem
Designation : Instrument super visor construction & commissioning
From : 09/11/2011 to 31/12/2012.
JOB RESPONSIBILITY:
I had done calibration of control valves with smart positioners SVI & SVI 2, Presser Transmitters, flow transmitter, level- trolls and also removed and reinstallation of thermowells and also calibration Temperature transmitters. I have to provide all required document for calibration, and loop checking...
Prepare work permit, vehicle entry permit as per requirement., daily reports manager
09) Employer : Bonnati & Carlo Gavasi
Client : EL RAR AINE AMINAS sonatrach
Designation : Instrument supervisor
From : 07/06/2011 to 08/10/2011.
JOB RESPONSIBILITY
I had attended their shut down of TRAIN # 1&2& BOILER # 1&2 & Compressor Area. I had attended their calibration of control valves on-off valve, various type of transmitter& switches. Start up activities.
10) Employer : Benntini
Client : NAFTAL
Designation : E & I SUPER VISOR (pré commissioning commissioning)
From : 10/2010 to 10/ 2011.
JOB RESPONSIBILITY
Working as a Group Leader For Loop Testing, Functional Test, Pre Commissioning, and Commissioning Activities Of Various Instruments Related to Process, Utilities & Offsite. Also Involve in Maintenance Job during the Warranty.
Preparing the report on punch list for any problem/abnormality encountered on the device/instrument on actual field & correction for wiring termination in the junction box cabinet & instrument technical room (ITR).
Testing, calibration and maintenance during pre start-up of the system on the temperature, pressure, flow & level transmitter instrument/device using hart 375/475 communicator.
Hot and cold loop checks and functional test of field instruments and signals to central control room (CCR) via hard wiring and serial link.
Test simulation of the control valve percentage of opening & closing.
Doing as build on the instrument loop diagram & mark up for any changes or discrepancies.
Verification of the ESD trip on the control panel
11) Employer : Bentini (S.P.F.M.E)
Client : Project ASR NAFTAL
Designation : supervisor Instrumentation (pre-commissioning & commissioning)
Duration : 06/2010 to 09/2010
JOB RESPONSIBILITY
Testing, calibration and maintenance during pre start-up of the system on the combustible/toxic gas detector, flame detectors, smoke detectors, heat detectors, line off sight instrument/device.
Field simulation for graphic checked in Central Control Room and to ensure the proper orientation of instruments & motors and correct address to the Input/ Output card/ module.
Hot and cold loop checks and functional test of field instruments and signals to central control room (CCR) via hard wiring and serial link.
Preparing the report on punch list for any problem/abnormality encountered on the device/instrument on actual field & correction for wiring termination in the junction box cabinet & local equipment room (LER).
Responsibilities included construction activities like cable & gladding, Cable tray work, Impulse tubing, Marshalling rack & JB termination.
12) Employer : ANSALDO ENERGIA
Client : Power Plant project L’arabaa (Alger)
Designation : Instrument Supervisor (Commissioning)
Duration : fevr2009 to December 2009
JOB RESPONSIBILITY
Use the permit to work system before work on the assign system & sub-system.
Making the Instrument test report (ITR-B) for every loop completed.
Involve in the tri-party walk down with the client.
Assist on vendor to test the skid system communication to ICSS (Integrated Control Safety System).
Involve in doing the by-pass on on/off valves & control valves for the preparation for test pack for N2 leak testing.
Work with latest protocol like Hart Communicator Familiar with 375 Field Communicator, Instrument loop testing, Functional test, Calibration & Commissioning Activities in process area Instrument like (Yokogawa ff) control valve with Fisher DVC 6000F Series Positioner & Metso & Siemens Positioner, SOV, ESDV, On-Off Valve, Thermocouple, RTD.I am working with Honeywell TDC3000.
Doing the as built on all loop drawing of Safety Instrumented System (SIS), Process Automation System (PAS), & Fire & Gas System as per Engineering new revision drawings.
Installing End of line & do function test with system . F&G system.
13) Employer : Entrepose Contracting
Client : MLN project
Designation : Instrument Technician (Construction & Commissioning)
Duration : 05/02/2007 to 25/12/2007
JOB RESPONSIBILITY
My responsibilities are to make permit and arrangement for all technicians as will as for all zero checking, calibration, valve overhauling, material inspection, pressure testing, loop checking, removal & fixing of different types of Instruments & Provides all requirement to make job easy and in time and to satisfy our clients and to complete all jobs and to maintain all documents for clam.
To make all arrangements to do pre- commissioning for the new DCS controlled system and its associated process loops and installation and commissioning of process instrument. My special skill to make any task in time.
I was engaged in erection, commissioning, start up and modification of different loops and instrument as per process requirement.
Hot and cold loop checks and functional test of field instruments and signals to central control room (CCR) via hard wiring and serial link.
14) Employer : SARPI & ABB
Client : Bir Berkine processing oil
Designation : Instrument Technician Construction &Commissioning
Duration : 01/04/2005 to 26/10/2006
JOB RESPONSIBILITY
Installation of instruments, cable termination and loop checking, commissioning calibration, and troubleshooting for all kinds of loops
Lab calibration of Various electronic & Pneumatic field and panel instruments
Walk down on all sub-system and updating all the drawings on actual field installation base on the piping & instrument diagram (P&ID).
Testing, calibration and maintenance during pre start-up of the system on the temperature, pressure, flow, level transmitter on/of valves & control valves instrument/device using hart 375/475 communicator.
Hot and cold loop checks and functional test of field instruments and signals to central control room (CCR) via hard wiring and serial link.
Correction of wiring termination in the junction box cabinet & instrument technical room (ITR).
15) Employer : SARPI & ABB
Client : Biskra renovation & mark 2 change the system to mark 6
Designation : Instrument Technician
Duration : 01/02/2004 to 01/12/2004
JOB RESPONSIBILITY
Association work with preventive and corrective maintenance overhauling and shut down job. I had done overhauling of control valve & all instruments calibrated fire alarm systems and related logics. Calibrated and tested smoke detection systems, flare system. I had done interlock checking ESD checking and shut down. Well experienced in all types of electronic instrument calibration, commissioning and servicing. Experienced in various troubles shooting to pressure transmitters, D.P.T. Flow transmitters, temperature transmitters, R.T.D. I/P converters, level trolls and etc.
Float actuation type tank level indicator
.
Langues : Spoken Read Written
Arabic Very good Very good Very good
French Very good Very good Very good
English good good good
Computer knowledge :
- Mastery of office software: Microsoft Word, Excel, PowerPoint
Other:
- www.linkedin.com/in/********@*****.**
Drive license
Travel
hard worker
Mobility international
Full Name: Mimoun Abdelkader
Family Status: Married, 3 child
Address: Mocta douz rue n 17
el Amir Abd-el-Kader Mohammadia –Mascara
Age; 50 years old
Mobile : +213-***-**-**-** / 077*-***-***
E-mail : ********@*****.**
**********.******.***@*****.***
expired passport date; February 28/2029
Passport: to 14/02/2029