Post Job Free

Resume

Sign in

Power Plant High Speed

Location:
VasanthaNagar, Karnataka, 560001, India
Posted:
October 10, 2023

Contact this candidate

Resume:

Arumanai, Kanyakumari-Dt,Tamilnadu,India. Dated: *4/12/2021.

Dear Sir / Madam,

Compliments Of The Season & Wishing You a Great Day Ahead. My Respects, Regards, Affections & Merry Merry X-Mas Greetings To You All.

NEW SAFE ENERGY, ZERO EMITTING MEGA POWER PLANT

DESIGN, TECHNOLOGY & PRODUCT’S PROTOCOL

This Safe Energy, Zero Emitting Mega Power Plant-18, Can Be Erected @ Low Cost, When Compared To Thermal Power Plants, Needs Only 4 Grounds (2,400 X 4 =9,600 Square Feet) Of Land Area & Operation Cost Is Near “0” and The Time For Erection Is Less Than a Month. No Fuel Is Required & Hence There Is Zero Emission. Erect 4, One Meter Diameter, 12 Cm Thick Walled 500 Meters Long / High MS Iron Pipes With Their Base Is Planted In To The Soil / Ground For Appropriate Depth & In Four Corners Of a Square Of 25 Meters Being The Length Of The Side Wall Of The Said Square / Breath Of The Square, Vertically / Perpendicular To The Ground at 90 Degrees On All Sides.

This Plant Can Be Erected Anywhere On Ground On Sea Level, Even In The Center Of a City Or In Rural Areas Except That Of Areas In The Vicinity Of Airports, As Per The Requirement Of Power Or At Hill Stations Or Over Mountains Or Hillocks With The Difference That The Height Of All The 4 Said Pipes, Can Be Lesser If Erected Over Hills / Mountains.

At The Top Most Ends Of The Said 4 Pipes / Beams / Pillars, Fabricate The Generate Room / Alternator Room, So That The Roof Of The Said Generator / Alternator Room Does Not Protrude Above The Top Most Ends Of The 4 Pipes / Pillars / Beams With It’s Height Is As Appropriate, But Fabricated Within The 4 Vertical Pipes. At The Center Of The Said Generator / Alternator Room Is Fixed a 2, 3 Ball Bearing In The Vertical Plane At Desired / Required Intervals In Between, Through Which Passes The Central Shaft As Well As The Turbine Of The Alternator Whose Upper End Is Broader Than The Shaft, & Lies On a Horizontal Ball Bearing of Appropriate Dimensions, Mounted At The Upper Most Level Of The Said 4 Pillars. Just Above The Uppermost End / Tip Of The Said Broader Shaft Is Fixed 4-8 Horizontal Radical Spikes / Arms Of Appropriately 25 - 50 Meter Each & wHICH Are Well Supported With 4 Similar Arms Fixed On The Outer Tip Of The Said 4-8 Horixontal, Radical Spikes / Arms From a Higher Level Of The Vertical Support Rods / Thinner Shafts Fixed Up To a Height Of 25-50 Meters As Required Above The Broder End Of The Said Central Shaft Cum Turbile, In a Triangular Shape On The Vertical Side View.

From The Outer Tip Of The Said 4 To 8 Horizontal Arms Is Fixed / Is Hung 4-8 Tightly Twisted Steel Cable LIke The Brake Or Clutch Cables Used In Vehicles Of Minimum 30 Cms In Diameter / Breath Or MS Iron Thick Walled Pipes Of Minimum 30-45 Cm In Diameter & 200 To 300 Metrrs In Length Each, With Ball & Socket Joints On Both The Ends Including The One Tip That Is Tethered In The Outer Most End Of The Said 4-8 Horizontal Arms.

At The Lower Tips Of The Said 4-8 Hung Fabricated Twisted Steel Cables Or MS Iron Pipes, Are Fixed With a Ball and Socket, Well Lubricated 4-8 LPG Carrier-Like Tanks, With Rocket Like Tip On The Front Aspect, With Hollow Space In The Inner Aspect & Thick Walled Weing Around 20-30 Metric Tonnes, One Each In The Outer End The Said Horizontal Upper End-Arms & In The Outer Aspect, Upper Aspect In The From Aspect Through The Rocket Like Tipped Cylinder / LPG-Carier Shaped Tanks Are Fixed 3 Fans With Blades Of Appropriate Length & Twisted To Propel / Make Air Flow At High Speeds, Backwards Or Downwards, With The High Speed Electric Motors Those Rotate The 3 Fans In Said Each Cylindrical Tanks, Fitted Inside The The Said Cylinder / LPG-Carier Shaped Tanks & An Inverter / UPS & Tubular Acid & Lead or Lithium Batteries,

Which Initially Operate All The 3 Fans Fixed On The Outer, Upper & Front End Of The Said 4-8 Cylinder / LPG-Carier Shaped Tanks, Totally, Making The Hanging 200 To 300 Meters Long Twisted Multiple Steel Cables Of Appropriate Thickness Or With MS Iron Thick Walled Pipes Of 30 To 45 Cms In Diameter Fitted ith Ball And Socket Joints On Both Ends,Stretch Out Horizontally and To Rotate The Central Shaft Cum Turbine Ultimately.

The The 4-8 anging Units, Cylinder /Tank Shapped, With Built In Batteries, Inverter . UPS & 3 High Speed Electric Motors Those Operate All The 12-24 High Speed Fans Totally Fixed In The Periphery As Mentioned Above, So That The Turbine Cum Central Shaft States Rotating Anti-Clock Wise Or Clockwise As Required & As Erected & The RPM Of The Central Shaft Cum Turbine Will Be Low, But With Huge Torque & The RPM Of The Central Shaft / Turbine Is Made Very High As Required / As Specified / As Calculated / As Estimated, Using Toothed Gear Wheels, Mounted On The Generator / Alternator Room So That The Alternator Generates The Estimated MegaWatts Of Electricity Due To The Effect Of Huge Leverage, Heavy Mass Of All The 4-8 Cylindrical Tanks, Velocity & Momentum Thus Created. From The Generated Electricity All The 4-8 UPS Are Charged & Rest Of The Electricity Is Transmitted To The Adjacent Sub-Station THrough Well Thich Sheathed Copper Cables Of Appropriate Thickness, Through The Lumen Of The Vertical Pipes and Then To The Required Site Where There Is Requirement Of Power / Electricity. Thanking You, Yours Sincerely --Dr.Srinivasan Karthikeyan / Dr.Karthikeyan S, 8-69, Nediyasalai,Arumanai-P.O., Kanyakumari-Dt, Tamilnadu, India. Pincode:629151.

+91-735*******, +91-944*******, +91-465*-******.

On Wed, Nov 24, 2021 at 2:58 AM <ad0aep@r.postjobfree.com> wrote: Hi Compliments, I am looking for a possible tie up with a business or individual in your country so I can do some investments. Please, advise on investment opportunities in your country. By introduction, I am Li Yong, Executive Vice Chairman of China National Offshore Oil Corporation (CNOOC). Looking forward to your response. Best Regards, XX ad0aep@r.postjobfree.com CNOOC Limited NEW SAFE ENERGY, ZERO-EMITTING, SOLAR POWER

MICRO,MINI,MACRO & MEGA POWER PLANT DESIGN,

TECHNOLOGY & PROJECT’S / PRODUCT’S PROTOCOL-2

The Micro Safe Energy, Zero-Emitting Solar Power Plant Is Meant For Homes Mini Safe Energy, Zero-Emitting Solar Power Plant Is Meant For Apartments & Flats. Macro Safe Energy, Zero-Emitting Solar Power Plant Is Meant For Large Coomercial Establishments Like Multiplex Movie Theatres & Small Industries & Mega Safe Energy, Zero-Emitting Solar Power Plant Is Meant For Commercial Power Plant Projects Spread Over In Large Areas Of Land. In all The Above Said Micro, Mini, Macro & Mega Power Plants The Design, Technology, Power Plant Project / Product Are Same As Below, The Difference In Between Them Is 1) The Size Of The Concave Mirror & Convex Lenses and 2) The Number Of Such Units Like 1 To 1,000s :

For Example For a Independant Villa Of Built In Area Of 1,000 Square Foot, Built In a Land Area Of 2,400 Sq.Foot / 1 Ground, Erect a Concave Mirror Like Structure Of Diameter Around 1015 Meters & Made UpOf Some Reflective Surfaced Metal Like Tin Sheet Coated With Aluminium Paint On 2.3 Layers So That The Sun Light / U/V Light From Sun Light Get Reflected Near 100%.

See That The Focal Point Of The Concave Mirror As Designed Above Is Around 10--15 Meters From The Base / Bottom Of The Said Concave Mirror & Mounted At a Height Of 3 Meters Above The Open Terrace So That The Open Terrace, Though Will Prevent Direct Sun Light From Illuminating The Open Terrace Can Be Used By The House Holds.

At The Focal Point Of The Concave Mirror, Is Fixed A Convex Lense Of Diameter 30-45 Cms To Furthur Condense The Converged Sun-LIght Reflected / Collected From The Said Concave Mirror &

A Bundled & Sheathed Flexible Glass Optical Fibre Of Appropriate Thickness / Breath Is Mounted At The Focal Point Of The 30-45 Cms Dia Convex Lense To Transmit The Condensed Sun Light From An Area Of The Hemi-Spherical Concave Mirror To The Convex Lense To Furthur Condense To Smaller But Many Times Hotter Beam Of Sun Light Of Around 5-10 Cms & The Other Tip Of The Said Bundled & Sheathed Flexible Glass Optical Fibre Is Immersed / Focussed In To The Water In The Water Tank In Whose Roof Is The Said Bundled Glass Optical Fibre Is Penetrating Through To The Water Inside The Water Tank Of Ariund 2 x 1 x 05 Meter Dimension In Which Water Is Filled Up To 75% Of The Height & Arrangements To Auto-Fill Is Made Using Pumping Of Water Using Lase Beam / Ultra Sound Sensor So That Water Continuously Vapourises At a Temperature Of Minimum 200 Degrees Celcious Transmitted By Condensed Sun Light, Through The Bundled Glass Fibre & The Steam Collected Is Taken Through a Pipeline To An Adjacent Old Railway Steam Engine Of Miniature Sized Piston & Cylinder, Which Propels The Turbine Of The Alternator To Generate Electricity From Sun Rise To Sun Set, Provided The Direction Of The Axis Of The Sun Light Collecting Concave Mirror Is Adjaceble Either Automatically Using a Gear & Small Electric Motor With MInimum RPM Or By Manual Tilting, So That The Direction Of The Axis Of The Sun Light Collecting Concave Mirror Faces The Sun Directly At an Angle Of 90 Degrees As Of The Bottom Of The Concave Mirror

A Portion Of The Generated Electricity Is Stored In Tubular / Lithium Batteries So That It Can Be Used At The Night Times After Sun Set Till Sun Rise, Using An Inverter / UPS. For Mini, Mcro Safe Energy, Zero-Emitting Solar Power Plants The Number Of Such Units & The Enhanced Dimensions Of The Concave Mirror & The Convex Lense What Matters.

In Mega Safe Energy, Zero-Emitting Solar Power Plants 100s Or 1,000s Of Such Units Will Be Required & The Number Of The Steam Engines Used & The Dimensions Of The Steam Engines Used In Appropriate Proportions. Thanking You, Yours Sincerely--Dr.Srinivasan Karthikeyan, Arumanai-P.O., Kanyakumari-Dt,Tamilnadu, India. Pincode: 629151. +91-735*******, +91-944*******.

NEW SAFE ENERGY, ZERO EMITTING MEGA

POWER PLANT PROJECT’S DESIGN,

TECHNOLOGY & PRODUCT’S PROTOCOL.

Erect 4 Verical Fabricated Iron / Stainless Steel Towers Like That Of a Mobile Radio-Waves Transmitter Tower Of Each Of a Height / Lenth Of Around 250-500 Meters Each Positioned As One Of The 4 Points Of Covergence Of a Square Of 500-1000 Meters In Breath / Length Of Each Side / Wall Of The Said Square.

Fabricate The Roof, Linking The 4 Corners Of The Square With Appropriate Linking Mesh Of MS Iron / Stainless Steel Structure On The Top Of The / Over The Said 4 Vertical Towers As Said Above Of & Of a Height Of 250-500 Meters With a Square Stronger Platform Of at The Center Of The Top

& Roof Mesh Fabrication Of A Lenth & Breath Of 20-25 Meters To House / Mount The Generator / Alternator Room Above The Roof Mesh Lying At a Height Of 250-500 Meters Above Ground Level &

At The Mid Point Of The Said Roof Mesh Resting Over The 4 Towers Lying At a Distance Of 600-1000 Meters On Each Corner / Point Of Convergence Of The Broader Square Fix a Heavy Duty Ball-Bearing Of The diameter of The Inner Wall / Lumen Of The Bearing, Through Which an 1 Meter Diameter Iron Shaft Made-Up Up Of 12 Cms Thick Walled MS Iron Pipe Of A Height Protruding Up To 10-20 Meters Up & 10 Meters Below The Level Of The Ball-Bearing &

The Upper End Of The Hanging MS Iron Pipe Of Totally 20-30 Meters Long Thick Walled MS Steel Pipe, Act As The Turbine Of The Mega Power Project, That Is Fixed At The Upper End Of The Generator / Alternator Room Also, As Appropriate & At The Lower End Of The Said Vertically Mounted Central Thick Walled Pipe Acting The Central Shaft As Well As The Turbine, Fix An Appropriate Thick MS Steel Cross With 4 Well Supported (To Bear A Hanging Weight Of Around 80-120 & The Centri-Fugal Calculated / Estimated Force Exerted On It) Radical Spikes Radiating Horiontally From The Central Midpoint At 90 Degrees With Relation To The Said Central Cylinder Like Thick Walled Pipe Of Length Of Each Spike Being 10-20 Meters As Appropriate / As Required.

At Each End Of The Horizontal 4 Radical Spikes / Arms Hang An Appropriate Thick Rope Like Tightly Twisted ( As That Of a Clutch Or Brake Cable) Steel Wires Of Appropriate Thickness

& Length Of Around 400-450 Meters To Withstand The Wieght Of 20-30 Metric Tonne Massed Diesel Carrier- Tank Shaped Cylinders With Required Thickness Of The Said Cylindrical Tank.

At One / Front End Of The 4 Hanging / Hung Said Cylindrical Tanks Fix A Very High Speed Electric Fan With Blades Of Appropriate Length That Will Rotate At The Speed / RPM Like That Of a Boeing / Jet Engine, Each, With an Inverter & Battery Back-Up / UPS Of Required Amperes & Voltage Inside The 4 Tank-Cylinders,

So That If All The 4 Tank-Cylinders Of Each Weing 20-30 Metric Tonne, Each Start Working With All The Said 4 Electric Fans The Central Cylindrical Thick Walled Shaft As Well As The Turbine (At The Upper-End) Rotates In Either Clock-Wise Or Anti-Clock Wise At Calculated / Estimated Speed / RPM To Rotate The Turbine Alternator Shaft To Generate Estimated Elecricity In 100s / 1000s Of Mega Watts Proprotional To All The Dimensions Of The Entire Fabricated Network System & As Per The RPM Of Each Of The 4 Electric Fans and Lenth Of All The Fan Blades.

The 4 Batteries Are Charged While The Generator / Alternotor Is Operational & Rest Of The Electricity Is Transmitted To The Nearby Sub-Station Through Thick Walled Electricity Conducting CablesTaken Within The Core Aspect Of All The Fbricated Netwirk & Hanging Units, Passing Through / Originating From The Central Cylinder Like Shaft Cum Turbine, Through The Fabricated Roof, Mounted Over The 4 Weight Bearing Cell Phone Tower Like Towers Of Height Of 250-500 Meters & Lying On Each Corner Of The Said Basal Square & Then To The Grid Or As To Required Places For Distributation.

Erect As Many Units Like This Any Where To Meet The Requirements Of Power / Electricity.

Thanking You,

Your’s Sincerely,

Dr.Srinivasan Karthikeyan, Arumanai, Kanyakumari-Dt, Tamilnadu, India. Pincode: 629151.

+91-735*******, +91-944*******.

NEW DESIGN, TECHNOLOGY, PROJECT & PRODUCT’S

PROTOCOL OF SAFE ENERGY ZERO EMITTING

HYDRO-ELECTRIC POWER PLANT, THAT DOES NOT

REQUIRE A DAM-6

Arumanai-P.O., Kanyakumari-Dt, Tamilnadu, India.

Dated 18th November 2021.

This Modified New Dam-Less, Safe Energy Zero Emission Hydro Electric Power Plant, With Production Capacity Of 500-1000 MegaWatt Can Be Erected Adjacent To Mountain Clif / Suicide Projects, Preferably Or In The Slopes Of The Mountains For Example Western Ghats & Easter Ghats In Tamilnadu, At Altitude Of Minimum 1,000 Feet In Height. The Technology, Power Plant Project & Product’s Design Are Same As Below, Except That The Concrete Pipe Lines Mentioned As Central Broad Pipe Line, Peripheral Thinner & Multiple Pipe Line & Except The Concrete Large Basal Double Walled Tank & Apical Tank Are Replaced As Below: All The Said Pipe Lines Are Replaced With Cement / Concrete Ready Made Interlockable Pipelines, Mounted / Housed / Fixed To The Side / Slope Of The Adjoining Mountain Vertical Wall / Slope As Applicale, With Appropriate MS Iron Plate Fabrication Clamps Of Appropriate Thickness Over Concrete Housing Bases Erected, With Strong

Foundations, On The Side Wall / Slope Of The Adjacent Mountain Wall At Appropriate Intervals To Reduce The Cost Of Erection By 75% and Reducing The Time For Erection By 75% and To Make Maintainance Easier.

The Double Walled Basal Tank Of 50-100 Meter Diameter Concrete Tank Is Erected / Constructed As Per The Below Mentioned Project &

The Apical Concrete Tank Of 50-100 Meters In Diameter & 15-25 Meters In Height Is Built On The Flat Floor Made For Erecting The Said Tank On The Side Wall / Slope Of The Adjacent Mountain Wall, With Strong Foundation As

Appropriate.

All Other Structural and Functional Parts / Aspects Of The Below Mentioned New Dam-Less Hydro-Electric Power Plant Project’s Protocol & Kindly Refer To It & Modify Accordingly For Gross Reduction Of Erection & Maintainance Costs: This New Dam-Less, Safe Energy Zero Emission Hydro Electric Power Plant, With Production Capacity Of 500-1000 MegaWatt Can Be Erected Anywhere, On Form Soil, As Required, Even As Off-Shore One.

On The Ground Level or In Basement Construct A Leak-Proof Double Outer Walled, But Inter Connected Concrete

Reservoir Of Around 50-100 Meters In Diameter & 25-50 Meters In Height, With 10-20 High Speed Exhaust Fans Of Around 10-20 Meters In Diameter Placed On The Inner Wall In All Directions At Desired / Available Gaps &

The Outer Wall Does Not Consist Of Any Deficits / Holes With High Speed Exhaust Fans As In The Inner Wall & From The Upper Roof Of It Erect a Concrete Circular Pipe Line Of 10-20 Meters In Diameter & Around 1000 Feet / 333 Meters In Height, As Possible At The Center Portion, Starting From The Roof As Said Above So That It Contains a Generator / Alternator Room, Constructed Adjacent To The Base Of The Central Concrete Pipe Line & a Circular Room, In Continuity Of The Inner Lumen Of The Central Pipe Line at The Basal Level Over The Over / Above The Basal Broader Circular Concrete Tank For Housing The Mid-Line- Turn Table Of Appropriate Dimensions With Multiple Jet Holes Placed As Appropriate To Rotate The Said Turn Table Within or In The Opposite Adjacent Portion Outside The Central Pipe Line, Which In Turn Rotate The Alternator / Generator, Erected In The Alternator / Generator Room Connected With Appropriate Transmission System Of Rods & Gears, To Generate

Electricity Of 500-1000 MegaWatt, Produced as Said Above. Erect Another 4-8 Peripheral Concrete Pipe LInes, Of Around 7.5 -15 Meters In Diameter & Same Height (Around 1,000 Feet / 333 Meters High) & All The Vertical Central & Parallel Peripheral Concrete Pipe Lines End Up / Are Connected In To The Apex Concrete Tank Of Around 50-100 Meters In Diameter & 15-25 Meters In Height & All The Said Single Central & 4-8 Peripheral Concrete Pipe Lines Are Constructed So As To Act As Pillars To Hold / Bear The Weight / Mass Of The Apical / Top-Most Concrete Circular Tank.

Erect Outer Steel MS or Pig Iron Pipe Lines Of Around 50 Cms In Diameter & Around Or Little Higher / Longer, Number As Required Which Originate From The Base & Are Used To Pump Water, With The Help Of Electrical Motors Of

Appropriate Horse Powers Mounted In The Ground Level, In To The Entire Inner Aspect Of The Apical & Basal Circular Boader Concrete Tanks, Central & All Peripheral Concrete Pipe Lines & The Sealed Turn Table Room and It’s Sealed Internal Jet Oulet Hose Structures To Initially Fill All The Above Said Lumens & To Pump Water Again When

Necessary, When The Water Level Drops In The Apical Concrete Circular Tank With The Help Of a Sensor

Automatically To Maintain The Water Level As Said While The Plant Is On Continuous Operation & Constant Production Of Electricity Of 500-1000 MegaWatt, Which Is Transmitted To The Adjoining Sub-Station & From There To Needy Places As Decided.

Once Water Is Filled As Said In To The Entire Network Of The System, The High Speed Exhaust Fans Fitted In The 10-20 Meters In Diameter Pores / Holes In The Inner Wall Of The Basal Concrete Tank, Of 10-20 In Numbers To See That The Water Start Moving / Circulating, By Transferring & Emptying The Inner Portion Of The Inner Wall Of The Central Concrete Tank To The Outer Compartment Around The Inner Wall Of The Basal Concrete Tank & Subsequently Rise WithIn All The Peripheral Pipe Lines & In To The Apical Tank, Using The Cenrtripetal Forces Exerted By All The 10-20 High Speed Exhaust Fans Pushing Out The Water From The Inner

Compartment Of The Basal Tank To The Outer Aspect Of Said Basal Tank,

Which Will Empty The Inner Portion Of The Basal Tank Where The Outlet Of The Turn Table Instrinct Structures, Drain Their Exit / Drainage / Output Water, So That The Turn Table Starts Rotating At The Specified Specifications, Thus Rotating The Turbun & The Alternator / Generator To Generate The Specified Electricity, Continuously Without Any Interruption, Except One Day Each Month For Maintenance Works As Mandated.

As The Water In The Basal Tank, Both Within & Outside Of The Inner Wall Are In The Same Plane & Water Pressure There Won’t Be Any Difficulty For The 10-20 Exhaust Fans Mounted & Operative In The Holes / Pores Of The Inner Wall Of The Basal Tank & There Is No Need To Pump All The Outlet /Drainage Waters To Higher Altitudes

If The Diameter Of The Central Concrete Pipe Line Is 10 Meters In Diameter The Production Capacity Will Be 500 MegaWatt & If It Is 20 Meters In Diameter, Production Of Electricity Will Be 1,000 MegaWatt.

We Can Erect As Many Units As This Plant At Intervals Of 200-500 Kilometers, Spead Across In The Vertical & Horizontal Dimensions, As Required As Per The demand Of Each Area, The Total Production In The Wide-Spead Net Work Of Hydro Electric Power Plants Can Replace The Total Production Of Electricity, From All The Thermal Power Plants Spread Across The Nation Like India & Any Nation On The Globe For Instance, Causing Zero Emission.

Thanking You,

Yours Sincerely,

Dr.Srinivasan Karthikeyan, Arumanai, Kanyakumari-Dt, Tamilnadu, India-629151.

NEW DESIGN, TECHNOLOGY, PROJECT & PRODUCT’S

PROTOCOL OF SAFE ENERGY ZERO EMITTING

HYDRO-ELECTRIC POWER PLANT, THAT DOES NOT

REQUIRE A DAM.

This New Dam-Less, Safe Energy Zero Emission Hydro Electric Power Plant, With Production Capacity Of 500-1000 MegaWatt Can Be Erected Anywhere, On Form Soil, As Required, Even As Off-Shore One.

On The Ground Level or In Basement Construct A Leak-Proof Double Outer Walled, But Inter Connected Concrete

Reservoir Of Around 50-100 Meters In Diameter & 25-50 Meters In Height, With 10-20 High Speed Exhaust Fans Of Around 10-20 Meters In Diameter Placed On The Inner Wall In All Directions At Desired / Available Gaps &

The Outer Wall Does Not Consist Of Any Deficits / Holes With High Speed Exhaust Fans As In The Inner Wall & From The Upper Roof Of It Erect a Concrete Circular Pipe Line Of 10-20 Meters In Diameter & Around 1000 Feet / 333 Meters In Height, As Possible At The Center Portion, Starting From The Roof As Said Above So That It Contains a Generator / Alternator Room, Constructed Adjacent To The Base Of The Central Concrete Pipe Line & a Circular Room, In Continuity Of The Inner Lumen Of The Central Pipe Line at The Basal Level Over The Over / Above The Basal Broader Circular Concrete Tank For Housing The Mid-Line- Turn Table Of Appropriate Dimensions With Multiple Jet Holes Placed As Appropriate To Rotate The Said Turn Table Within or In The Opposite Adjacent Portion Outside The Central Pipe Line, Which In Turn Rotate The Alternator / Generator, Erected In The Alternator / Generator Room Connected With Appropriate Transmission System Of Rods & Gears, To Generate

Electricity Of 500-1000 MegaWatt, Produced as Said Above. Erect Another 4-8 Peripheral Concrete Pipe LInes, Of Around 7.5 -15 Meters In Diameter & Same Height (Around 1,000 Feet / 333 Meters High) & All The Vertical Central & Parallel Peripheral Concrete Pipe Lines End Up / Are Connected In To The Apex Concrete Tank Of Around 50-100 Meters In Diameter & 15-25 Meters In Height & All The Said Single Central & 4-8 Peripheral Concrete Pipe Lines Are Constructed So As To Act As Pillars To Hold / Bear The Weight / Mass Of The Apical / Top-Most Concrete Circular Tank.

Erect Outer Steel MS or Pig Iron Pipe Lines Of Around 50 Cms In Diameter & Around Or Little Higher / Longer, Number As Required Which Originate From The Base & Are Used To Pump Water, With The Help Of Electrical Motors Of

Appropriate Horse Powers Mounted In The Ground Level, In To The Entire Inner Aspect Of The Apical & Basal Circular Boader Concrete Tanks, Central & All Peripheral Concrete Pipe Lines & The Sealed Turn Table Room and It’s Sealed Internal Jet Oulet Hose Structures To Initially Fill All The Above Said Lumens & To Pump Water Again When

Necessary, When The Water Level Drops In The Apical Concrete Circular Tank With The Help Of a Sensor

Automatically To Maintain The Water Level As Said While The Plant Is On Continuous Operation & Constant Production Of Electricity Of 500-1000 MegaWatt, Which Is Transmitted To The Adjoining Sub-Station & From There To Needy Places As Decided.

Once Water Is Filled As Said In To The Entire Network Of The System, The High Speed Exhaust Fans Fitted In The 10-20 Meters In Diameter Pores / Holes In The Inner Wall Of The Basal Concrete Tank, Of 10-20 In Numbers To See That The Water Start Moving / Circulating, By Transferring & Emptying The Inner Portion Of The Inner Wall Of The Central Concrete Tank To The Outer Compartment Around The Inner Wall Of The Basal Concrete Tank & Subsequently Rise WithIn All The Peripheral Pipe Lines & In To The Apical Tank, Using The Cenrtripetal Forces Exerted By All The 10-20 High Speed Exhaust Fans Pushing Out The Water From The Inner

Compartment Of The Basal Tank To The Outer Aspect Of Said Basal Tank,

Which Will Empty The Inner Portion Of The Basal Tank Where The Outlet Of The Turn Table Instrinct Structures, Drain Their Exit / Drainage / Output Water, So That The Turn Table Starts Rotating At The Specified Specifications, Thus Rotating The Turbun & The Alternator / Generator To Generate The Specified Electricity, Continuously Without Any Interruption, Except One Day Each Month For Maintenance Works As Mandated.

As The Water In The Basal Tank, Both Within & Outside Of The Inner Wall Are In The Same Plane & Water Pressure There Won’t Be Any Difficulty For The 10-20 Exhaust Fans Mounted & Operative In The Holes / Pores Of The Inner Wall Of The Basal Tank & There Is No Need To Pump All The Outlet /Drainage Waters To Higher Altitudes

If The Diameter Of The Central Concrete Pipe Line Is 10 Meters In Diameter The Production Capacity Will Be 500 MegaWatt & If It Is 20 Meters In Diameter, Production Of Electricity Will Be 1,000 MegaWatt.

We Can Erect As Many Units As This Plant At Intervals Of 200-500 Kilometers, Spead Across In The Vertical & Horizontal Dimensions, As Required As Per The demand Of Each Area, The Total Production In The Wide-Spead Net Work Of Hydro Electric Power Plants Can Replace The Total Production Of Electricity, From All The Thermal Power Plants Spread Across The Nation Like India & Any Nation On The Globe For Instance, Causing Zero Emission.

Thanking You,

Yours Sincerely,

Dr.Srinivasan Karthikeyan, Arumanai, Kanyakumari-Dt, Tamilnadu, India-629151.

Mobile Nos: +91-735*******, +91-944*******. Land Line No: +91-465*-******.

ICE STORM IN TANZANIA OF AUSTRALIA & EXPANDING

MAGNITUDE & QUANTUM, MANYFOLD OF VERY HIGH

ALTITUDE HOT AIR CIRCULATION LEADING TO CLOUD

CRASH, SNOW STORMS, DEPRESSIONS, CYLONES,

ECT, IN RECENT TIMES.

Recently Australia’s Some Province ( I, Remenber It As Tanzania) Was Hit By Snow-Storm Within a Week’s Time. Chennai Of Tamilnadu State, India Experienced a Cloud Crash During 8-12/11/2021 Like Somany Places Like

Chatiskar State, India, Mumbai Of Maharashtra State, Kolkotha Of West Bengal State, India, Hydrabad Of Andhra Pradesh State, India, ect Leading To Severe Flooding & Induntation Of Flood Waters Causing Severe Hardships To The Residents Of Affected Places With Loss Of Invaluable Human Lives, Loss Of Cattle & Huge Loss Of Properties, Both Public & Private Ones, In The Past 1 Year Like Kanyakumari

–Dt Of Tamilnadu State Of India Recorded 9 Times Of Average Rainfall In November Between 13-15/11/2021, With Same Consequences In Most Places Of The Said Dt. And Most Nations Like Germany, Netherland & Begium Of EU and Cities Like Newyork, Washington, USA, London, UK & Provinces Like Columbia Adjacent To Bay Of Mexico, In USA, Got Affected Similarly With Floods Washing Away Cars, Trucks, Making Fly The Roofs, Ect In The Last 1 Year. The Reason Of The Said Disaster In Kanyakumari-Dt, Tamilnadu, India, Where I Live Is The Clouds Accumulated For a Height 3.6 Kilometers From Above 4,000 Feet From Ground / Mean Sea Level Up To 3.6 kMS X 3,333’ = 11,999 / 12,000 Feet From Above 4,000 Feet Mean Sea / Ground Level = 4,000 To 16,000 Feet In Altitude, In Which Altitude The Temperarure Will Be Less Than 2-4 Deg.Cl, Or Near “0”, Triggering Condensation Of All Clouds, Triggering Simultaneous Conversion Of Water Vapour(Clouds) @ Lower Levels To Liquid State From Gaseous State Resulting In Cloud-Crack & Very High Downpoir & Height Of Clouds OF 12,000 Feet and Extending Up To Around 1,000 Kms Sothwards & Eastwards Of Kanyakumari-Dt, From 13-15/11/2021, As Per Satellite Pictures Of Tamilnadu State & Meteriological Department Director’s Statement & Forecast 2 Days In Advance, Caused By Very high Altitude Hot Air Circulation Originating From South Of Thailand, Indonesia From Pacific Ocean To Indian Ocean & Andhaman Islands, 1,000 kms East Of Chennai In Bay Bangal, Nearly 6,000 Kilometers In Diameter To Cause The Said Disaster In Kanyakumari-Dt, Tamilnadu, India, During 13-15/11/2021 and Even Now Causing Heavy

Downpour In Alappuzha-Dt Of Kerala Stare & Again In Kanyakumari-Dt, From 7pm On 17/11/2021.

The Reason For The Increase Of Magintude & Quantum Of Very High Altitude Hot Air Circulation Are Many Fold Of The Constitutions, Though / Which Are Broadly Attributed To Global Warming To Emission Of Greenhouse Gases Manyfold In The Past 1 Decade Leading To Increasing Porosity & Thinning Of The Ozone Layer, / O3 Layer / Layer Made-Up Of Molecules With Three Oxygen Atoms, Existing Like An Outer Transparant Shield / Cover, 100 Kms Above & Around The Entire Planet Earth, The Time-Zone As Said Above.

Some Of Which Are 1} Dissolving Of Around 50,000 To 75,000 Metric Tonnes Of Burnt Carbon Waste / Ash Of 100s Of Thermal Power Plants Throughout India / Day, In To To The Adjacent Bay Of Bengal & Arabian Sea & Ultimately To All The Nearby Oceans, Which / The Burnt Carbon Waste, Contains Carbon Micro Particles, Highly Visose & Black Coal Tar & It’s Derivatives, Which (The Carbon Micro-Particles Of Around 50,000 To 75,000 Metric Tonnes Of Burnt Carbon Waste / Day)



Contact this candidate