SUMMARY

Decisive Mechanical Construction Manager and Owner’s Representative, with extensive proficiencies working in Oil, Natural Gas, Specialty Gases, and Coal Construction as well as other Industries. My 40+ years of experience consists of site management and quality control for Civil, Mechanical and Electrical field engineering. Safety oriented to regulations, disciplined for budgets, schedules, dependable for coordinating efforts of the team and facilitating good communications. I offer skills to supervise quality control functions QA/QC, for modification projects, new construction, maintenance planning, estimating, and scheduling. My expertise includes the ability to recognize the impact of changes on the project and to use effectiveness measurement tools to deliver the project on time and on budget with quality results.

CORE CAPABILITIES and EXPERIENCE

Consistently implement and maintain organizational standards and regulatory requirements.

Experienced operator on P&H Omega 25-ton crane as well as driving a 15-ton cherry picker and DROTT.

Final work package walk-downs, start-up, and commissioning for all Civil, Mechanical and Electrical Engineering

Implement & supervise Engineering for Millwrights, Pipefitters, Welders, Boilermakers, Electricians, and QAQC

Lead cross-functional teams [75-300] resolving multiple complex organizational, mechanical, and technical issues.

Prioritize & manage multiple tasks & Projects that include high-visibility initiatives, innovation, teamwork & planning.

Proficient verbal, written and presentation skills; communicate clearly, with credibility and confidence.

Responsible for critical lifts in new and operating facilities up to three hundred metric tons

Revisions as per ASME Boiler Codes for shutdown, start-up/commissioning, and demobilization activities

EDUCATION / HONORS / ACADEMIC AFFILIATIONS

University of Southern Mississippi, College of Business Administration, Hattiesburg, MS MBA/MPA Administration 20 Hours completed.

Elected Outstanding Member, Sigma Iota Epsilon Management Honor Fraternity

Southern College, Collegedale, TN / Bachelor Science Business [GPA 3.42]

Jones Jr. College, Ellisville, MS / associate degree, General Engineering

American College of Health Care Administrators

President - Sigma Iota Epsilon Management Honor Fraternity

Member - Gamma Beta Phi Honor Society

Vice President - Society of Manufacturing Engineers

Member - Phi ETA Sigma Freshman Honor Society

CURRENT PROFESSIONAL LICENSES / CERTIFICATIONS / TECHNICAL SOFTWARE

API 510/570 Test Candidate

AWS Certified Welding Inspector (CWI) Certificate #14062531

Blue Beam Revu Extreme 2022

Certified Radiographic Interpreter (CRI) Test Candidate

FAA Part 107 UAS Remote Pilot Certificate #4696258

Microsoft Office Excel, PowerPoint, Word, Outlook

NCCER Pipefitter Certification Plus #3759677

OSHA 30 / OSHA Basic Plus, Houston Safety Council

PMI Member # 5173760, PMP Test Candidate

Primavera P6 (19.12 Certificate)/Microsoft Projects 2021

Acorn Pipe, Navisworks and other model viewers

TWIC expires May 2024

USA Passport

RECENT WORK EXPERIENCE

04/2022-12/2023: On Site Construction Manager/Owners Representative, Sterlington, Louisiana Hunt, Guilliot & Associates, LLC. (HGA) (Advancion) 603 E Reynolds Drive. Ruston, LA 71270 318-***-****

Provided project oversight using continuous improvement to drive project(s) to success and low cost.

Final Reviews of Daily, weekly, monthly reports, safety audits, EWOs, RFIs, QA/QC audits, Redlines and As-Builts

Develop and finalize all added work scope documents for RFQs to contractors.

Developed Bid Tabs from Contractors bids for blind review before awarding work.

Developed and Maintained “As Demoed” and “Site prep” progress using MS Projects

Maintained Issues log and lessons learned. Advise facility management as appropriate.

Functioned as the key individual who will be responsible for understanding the technical needs of the facility and leading the project to execute assigned construction activities and technical tasks.

Responsible for compliance of all regulatory requirements including emissions permits (air, water, and solid wastes), and Process Safety Management (PSM). Actively manage Process Hazard Analyses (PHA), Management of Change (MOC), corrective and preventive actions (CAPA), and Process Safety Information (PSI).

Develop, maintain, and track project schedules to ensure that project execution is timely and on budget.

Develop and manage engineering and capital budgets.

Manage engineering contractors and equipment vendors as needed to support operations and projects.

Coordinate input from plant operations, maintenance, EH&S to ensure all needs are supported in day-to-day activities and in projects.

Develop strong working relationships with all facility personnel, subcontractors, and suppliers (e.g., process technology, catalyst, and water treatment).

Work cross-functionally to support incident investigations, root cause analysis, and reliability activities.

Participate in a variety of budget, status, and management team and consultant meetings, model, and design reviews to provide input and resolve issues.

Lead and direct a staff of engineers, project managers, and computer-aided drafters providing support to one or more projects and/or sub-projects.

Travel as needed, to support multiple facilities and their activities.

04/2022-08/2022: On Site Construction Manager/Owners Representative, Terre Haute, Indiana Hunt, Guilliot & Associates, LLC. (HGA) (Bolder Industries). 603 E Reynolds Drive. Ruston, LA 71270 318-***-****

De-commissioning and Demolition activities of Furnace Area before turning over Finishing Area to Bolder Operations

Final Reviews of Daily, weekly, monthly reports, safety audits, EWOs, RFIs, QA/QC audits, Redlines and As-Builts

Develop and finalize all added work scope documents for RFQs to contractors.

Developed Bid Tabs from Contractors bids for blind review before awarding work.

Developed and Maintained “As Demoed” progress using MS Projects

Maintained Issues log and lessons learned.

Project used both Union and non-union contractors.

09/21-12/17/2021: ON SITE CORPORATE CONSTRUCTION COORDINATOR, Longview, TX

ICON Information Consultants, Inc. (ICON) (Air Liquide). Houston, TX 77007 · 713-***-****)

Final Reviews of Daily, weekly, monthly reports, safety audits, EWOs, RFIs, QA/QC audits, Redlines and As-Builts

Final High Pressure Pneumatic Testing up to 1380 PSIG

Finalize all QA/QC for Air Liquide HYPOX (ASU5/POX3) Air Separation Unit (ASU5) Partial Oxidation unit (POX3)

Overall final inspection of documentation all Structural steel, equipment setting, and piping systems including insulation (Stainless Steel, Carbon steel to B31.3 service and Oxygen clean requirements >70% oxygen, Elect. installations)

Pre-commissioning and startup activities before turning over to Air Liquide Operations

07/20-09/2021: ON SITE CORPORATE QA/QC MANAGER, Owners Representative, Cottage Grove, MN

ICON Information Consultants, Inc. (ICON) (Air Liquide). Houston, TX 77007 · 713-***-****)

Cold Box erection (one hundred metric tons) and final inspections

Daily, weekly, monthly reports, safety audits, EWOs, RFIs, QA/QC audits, Redlines and As-Builts

Final High Pressure Pneumatic Testing up to 1380 PSIG

Final QA/QC turnover audits, Redline Reviews

QA/QC for Air Liquide Air Separation Unit (Standard Plant) on Greenfield project site (Union Contractor)

Overall final inspection of documentation of all Structural steel, equipment setting, and piping systems including insulation (Aluminum, Stainless Steel, Carbon steel to B31.3 service and Oxygen clean requirements >70% oxygen, Elect. installations)

Pre-commissioning and startup activities before turning over to Air Liquide Operations

Finalize all QA/QC for Air Liquide “Standard Plant” Air Separation Unit (ASU) on Greenfield project site.

Review x-ray films for final acceptance

02/20-07/20, TAR MECHANICAL PLANNER

Audubon Engineering, Tioga, ND

Cryogenic valve replacement work plans, material ordering in SAP.

Mole sieve valve replacement or repair work plans, material ordering in SAP.

Reviewed work plans and work sequences with P6 scheduler for TAR Planning

Various SDV and Instrumentation upgrade/replacement work plans, material ordering in SAP.

04/18-10/19: CONSTRUCTION SITE MANAGER, Owner’s Representative, Claymont, DE

Strategic Contract Resources, Inc. (SCR) (Linde/Messer Gas Project) ACWORTH, GA 30101 · 678-***-****

Cold Box erection (two hundred metric tons) and final internal inspections

Final High Pressure Pneumatic Testing up to 1180 PSIG

Final Pre-commissioning activities before turning over to client.

LENA (Linde Engineering North America) Air Separation Unit (ASU) one Impact 6-unit, one Impact 15 unit on Greenfield project inside a Brownfield location (Union Contractor)

Overall inspection of documentation all Structural steel, equipment setting, and piping systems including insulation (Aluminum, Stainless Steel, Carbon steel) to B31.3 service and Oxygen clean requirements > 70% oxygen, Elect. installations

Responsible for daily, weekly, monthly reports, safety audits, EWOs, RFIs, QA/QC audits, Redlines and As-Builts

Reviewed x-ray films for final acceptance.

2011-2018 AIR LIQUIDE PROJECTS

07/11-04/18: CONSTRUCTION SITE MANAGER. Owners Representative

Maxon Enterprises, Inc. Conroe, TX (Various Air Liquide Projects) Air Liquide Projects Have Critical Lifts 20k or more.

Taft LOX Pump Suction upgrades, Hahnville, LA

Longview ALLPOX Water Wash Tower addition, Longview, TX

Freeport HYCO C103 Compressor replacement, Freeport, TX

Taft LOX, Upgrades, Hahnville, LA

Plant 4 Outage, La Porte, TX

Geismar ALGUS; Geismar, LA

Hydrogen Cavern Surface facility Project, Beaumont, TX

Bayport Reliability Projects, La Porte, TX

Liquid Nitrogen Storage Tank, Cleburne, TX

GC-Steam Methane Reformer, La Porte, TX

Freeport HYCO Revamp Project, Freeport, TX

2011-2018 AIR LIQUIDE PROJECTS DETAILS

oAssisted QA/QC with mechanical, welding, hydro tests, insulation, and paint inspections to ensure completeness.

oCEMS Building Installation and upgrade; supervised multiple subcontractors for civil work, and off-site fabrication of building, on-site building erection, electrical and controls connections of SMR Unit to new CEMS building.

oCondensate Surge Tank: supervised multiple subcontractors for civil work, on-site fabrication, and erection of 90,000-gallon API Code tank, associated B31.3 process piping tie ins in between multiple other tanks.

oDe-aerator Feed water pumps controls upgrade

oElectrical and controls connections for a 750Kv back up diesel generator for ASU control room

oFinal underground Installation of 24-inch piping for a new cooling tower cell addition

oGreenfield installation and start-up of a surface facility and 69Kv substation designed to inject and extract hydrogen gas to/from a salt dome [capable of holding 6 billion SCF at 3000 psi] using multiple contractors.

oInstallation of a new 70-foot diameter clarifier, 24-foot diameter clear well, Veolia Disc filter system, water wash tower in the amine section of the POX (partial oxidation) unit, EG 300 Diesel Generator; supervised multiple subcontractors for civil work two new upgraded LOX pumps converting from (300 PSIG) to a high-pressure system (700 PSIG)

oInstalled two new power control buildings, one 13.8 Kv transformer and one 13.8 Kv switch.

oMatched engineering drawings and requirements such as U1A forms for all coded vessels on site

oMCC center change out and upgrades in three MCC centers.

oMechanical inspections during final stages of construction, start-up and commissioning activities, initial start-up activities with operations (1M+ man hours worked safely on this project)

oMeeting job and engineering standards and updated red line drawings and P&IDs for final turnover.

oMotor and pump data matched engineering requirements

oNight Shift Site Manager for Mechanical contractors on final stages of construction of a new 350-ton liquid nitrogen tank in an operating FDA Regulated Air Separation Unit (ASU)

oElectrical and controls upgrades to install new control room.

oOverall responsibility for all aspects of the project on site; Construction, Pre-Commissioning, Start-up, Safety, QC

oPre-commissioning final walk downs and x-ray films reviews for final acceptance

oPre-start-up safety review of each system to ensure all documentation was in order.

oPSV certifications are current and match engineering requirements.

oRemoval of existing, and installation of a new compressor skid (40,000 lbs.)

oRemoved and replaced four pumps, motors, foundations, and bases, and seven Demin filter vessels.

oRe-rating and commissioning C-109 hydrogen feed compressor to a pipeline compressor

oResponsible for daily, weekly, monthly reports, safety audits, EWOs, RFIs, QA/QC audits

oRestoration inspections, P&ID checks to ensure ISO built plant matched to P&ID designs.

oReviewed and updated SAP QM and MM files, x-ray films for final acceptance

oSeparated CO/CO2/SMR sections of plant from process and flare piping w/closure welds per B31.3 process piping codes.

oStart-up and Commissioning Engineer of new SMR unit with 18-megawatt steam turbine generator

oSupervised controls upgrade for De-aerator feed water pumps from analog controls to DCS controls.

oSupervised multiple contractors while revamping mothballed facility.

oSystem upgrade required addition of a PDC building with soft starters for the two new pump motors and controls.

oSystem upgrade required removal of Vacuum Jacketed suction piping and installing new piping and insulation.

oUpgrade of Suction piping on previously upgraded pumps to improve performance.

oWork with Multi-national vendor reps to ensure individual pieces of equipment are complete or ready for start-up.

oWorked with Maintenance Coordinator to update spare parts in SAP MM

2011-2008 WORK EXPERIENCE

05/11-07/11: JOURNEYMAN PIPEFITTER

FAGEN Construction, Sacul, TX

New construction of a Wood Fired 100 MW Turbine generator.

03/11-05/11: JOURNEYMAN PIPEFITTER

Jacobs Field Services, Hawkins, TX

New construction of a Nitrogen Recovery Unit

03/10-01/11: PIPING GENERAL FOREMAN

Plant Outage Solutions, Sea Breeze, TX

Landfill gas expansion and upgrade project in Dallas, TX

QA/QC, daily time sheets, progress reports, material requests, on-site safety, RFI’s to Engineering

Start-up and Commissioning of the project

2011-2007 WORK EXPERIENCE

01/10-03/10: SR BOILERMAKER FOREMAN

01/11-02/11: PIPING GENERAL FOREMAN

Wyatt V.I. Incorporated

BMP 118, 4093 Diamond Ruby Suite #7, Christiansted, V.I. 00820 Hovensa Oil Refinery, St. Croix, U.S.V.I.

Piping General Foreman in #6 DD Unit replacing PSV's and Piping, and Tower repairs

Removal and replacement of over four hundred pressure safety valves

Senior Boilermaker Foreman responsible for repair work to Dimer sol Unit exchangers

Walk down of work packages to ensure work completion, start-up, and commissioning of revised unit.

11/09-12/09: BOILERMAKER GENERAL FOREMAN

TIMEC, Carson, CA

Conoco Phillips, Carson, CA

Tank Farm shutdown of propane and crude storage tanks, inspections, and repairs

Start-up from moth ball status back to operation

08/09-11/09: PIPING GENERAL FOREMAN

S&B Constructors, Houston, TX, Chevron, El Segundo, CA

Start-up, commissioning, and demobilization in # 2 Crude Unit Shutdowns

07/09-08/09: PIPING GENERAL FOREMAN

TIMEC, Carson, CA Shell Oil, Martinez, CA

Crude unit shutdown, start-up and commissioning, and demobilization activities

07/08-06/09: QA/QC INSPECTOR / PIPEFITTER

Brinderson Construction, Gardena, CA

Shell Oil Refinery, Martinez, CA

Chevron Refinery, El Segundo, CA

Crude Oil Foundation Project: responsible for weld mapping of seven thousand feet of 30” .438 wall piping.

Delayed Coker Shutdown installing two Delta valves, making vessel repairs.

Field verification and prefabricated work for upcoming shutdown, walk down packages for pre-and post-hydro work completion and start-up and commissioning activities.

Final work package walk-down for completion, inspections during start-up and commissioning activities.

Fit-up inspections and all structural steel inspections with third party inspector, and grout inspections with client

Qualifying welding procedures for 410 clad to 1- Chrome with Inconel overlay to Shell Global Solutions Standards

03/08-07/08: PIPING GENERAL FOREMAN

S&B Constructors, Houston, TX

Enterprise, Inc., Meeker CO

Natural gas compressor station for construction, start-up, and commissioning

2006-1978: WORK EXPERIENCE

08/07-03/08: PIPING FOREMAN / PIPEFITTER

JV Industrial, Rancho Dominguez, CA., Exxon-Mobil Oil Refinery, Carson, CA., Chevron, El Segundo, CA., Conoco Phillips, Carson, CA

Coker Shutdown and start-up Piping Foreman and start-up Pipefitter in fabrication shop

03/07-08/07: PIPING FOREMAN

Turner Industries, Baton Rouge, LA Hovensa Oil Refinery, St. Croix, U.S.V.I.

Tiger Construction Piping Foreman Geo-Net Ethanol plant for construction, start-up, and commissioning

01/07-02/07: SENIOR BOILERMAKER FOREMAN

Wyatt V.I. Incorporated, BMP 118, Christiansted, V.I. Hovensa Oil Refinery, St. Croix, U.S.V.I.

Final work package walk-downs, start-up, and commissioning of revised unit.

Repair work to #3 platformer heaters, overhauling pilots, burners, skin work, repairing refractory and associated piping, installing, and removing battery limit blinds in fresh air conditions.

01/06-12/06: PIPING FOREMAN / GENERAL FOREMAN / PIPE FABRICATOR / BOILERMAKER / CLASS A PIPEFITTER

Turner Industries, Baton Rouge, LA Hovensa Oil Refinery, St. Croix, U.S.V.I.

Boilermaker/Pipefitter - Exxon Mobile, East Coker Unit Turnaround, Pipe still # 10: Class A Pipefitter, Norco/Motiva Shell Oil

GM: Coffeyville Resources, Coffey KS: Responsible for hydrostatic testing on ULSD project, start-up, and commissioning

Pipe Fabricator - Sasol North America

Start-up and commissioning for ammonia storage, nitrogen storage, & compressor lube oil piping in low sulfur gasoline unit

05/06-07/06: MAINTENANCE MECHANIC

Versa Corp, Warner Robins, GA

Install new stainless steel Re-pulper under machine with all associated piping, pumps, and agitators.

Maintenance Mechanic in papermill shutdowns; remove/replace rolls and doctor blades, remove/replace 1 in. and in. stainless steel tubing in lube oil system on machine.

09/98-12/06: OWNER

Sam Nugent Construction, Chattanooga, TN

Floor plan analysis for cost effectiveness of renovation versus increased efficiency of operations for commercial projects

Projects up to $600K: estimation and supervision of construction and renovation, residential and commercial (restaurants)

Maintenance of rolling stock and heavy equipment to ensure compliance with DOT and OSHA regulations.

09/96-2015: OWNER

Manning’s Art & Frame, Bowling Green, KY

Owner of Custom Picture Framing Gallery responsible for all aspects of business

08/94-12/95: GRADUATE RESEARCH ASSISTANT (FULL TIME)

The University of Southern Mississippi, Hattiesburg, MS

Research on primary care allocation to mentally ill in a poverty-stricken area and abstracts for HIV health services allocation

10/93-09/96: ADMINISTRATOR

125-bed traditional long-term care facility utilizing 125-130 employees on three shifts and a $4.5M budget

Administrator for nursing homes in Tennessee

Facilities ranged from a new 16-bed Subacute Care Unit specializing in short-term care following a major illness or surgery.

Utilized 15-20 employees on two shifts with a $1M budget.

05/93-10/93: SYSTEMS MANAGER

Health Care Interchange, Inc.; Chattanooga, TN

Computer system hardware, software for installations and maintenance

05/87-05/93: FULL TIME STUDENT

1972-1978: WORK EXPERIENCE

1984-1987: MULTI-CRAFT MAINTENANCE TECHNICIAN/MILLWRIGHT/PIPE FITTER/WELDER

Leaf River Forest Products, Inc. North; Northern Nekoosa; New Augusta, MS

Experienced operator on P&H Omega 25-ton crane and driving the 15-ton cherry picker and Drott.

Power recovery area [2 yrs.]; rebuilt/replaced Ahlstrom pumps; replaced I/R Clove Rotor pumps; repaired IMPCO washers.

Preventative and general maintenance, Kaymar Digesting System; lubrication schedules for 15 months for Digester, washing, and bleach plant equipment working closely with Mech-analysis and maintenance shutdown scheduling.

Promoted to "A" class technician after completion of welding test.

Replaced high pressure feeders; motor replacements and alignment .005"

Worked in tube and piping repairs, revisions as per ASME Boiler Codes

1978-1984: FOREMAN/QAQC INSPECTOR/CLASS A ELECTRICIAN APPRENTICE

Brown and Root Construction; Houston, TX

Responsible for general maintenance and capital projects for power generating, oil refinery, papermill piping and equipment throughout the Southeastern United States

Supervised up to forty-five craftsmen and apprentices.

1972-1978: PLUMBER'S APPRENTICE/PLUMBER/FOREMAN

Nugent Plumbing; Longview, TX

Responsible for general plumbing construction of residential homes

200+ unit apartment complexes supervising 25 craftsmen and apprentices.

PIPEFITTER/ASSISTANT FOREMAN - LEAF RIVER PAPER PULP PROJECT: New Augusta, MS

oWorked in pipe racks; ordered material, scheduled equipment, maintained daily progress sheets & monthly plans.

PIPEFITTER/FOREMAN/QAQC INSPECTOR - TEXAS EASTMAN KODAK: Longview, TX

oDuring start-up, installed orifice plates and strainers, leading operators to repair leaks found.

oMade QAQC mechanical visual inspection of all piping to insure 100% complete to engineering specifications before pre-hydro work began.

oMade third visual inspections to be sure all post-hydro and pre-commissioning work performed to engineering specifications and ready for client inspection.

oMade visual inspection of hydro to insure no leaks.

oMaintained daily time sheets, progress reports, ordered material and equipment in advance of need.

oMaintained work-area progress and housecleaning above job expectations.

oResponsible to perform all work in a professional, safe manner.

oWorked in ethylene gas recycle section of hydrocarbon cracking plant.

ELECTRICIAN'S HELPER - LONE STAR STEEL: Lone Star, TX

oErected and start-up Ajax Magna thermic Unit to replace gas furnaces for heating pipe.

oOperated DROTT and Galion 15-ton Cherry Picker and 25-ton overhead crane

oInstalled SCR DC-drive conveyor system, structural welding.

oHigh voltage electrical hook-up (32,500 and 13,800) to transformers during shutdown conditions

BOILERMAKER/RIGGER/EQUIPMENT OPERATOR/MILLWRIGHT - WEYCO: Valiant, OK

oNDE testing of digesters, weld repair, operated Galion Cherry Picker, and Drott.

oRemoved, rebuilt, and replaced rolls in number one press section of paper machine.

oReplaced triple race bearings in dryer section.

oMade engineering revisions to piping at head box; replaced chains on chip reclaimers.

oChip conveyor belts replacements to power boiler; rebuilt top separator to two digesters.

oGearbox replacement at bottom of digesters; replaced building over demineralized water plant.

oNASH vacuum pump replacement in VAC-all system

PIPEFITTER - GEORGIA PACIFIC PAPER MILL: Crossett, AR

oErected all two % chrome piping from top drum of recovery boiler to steam manifold.

oWorked shut down on paper machine to replace head box and press section.

oReworked lube oil piping in steam dryer sections

1978-1984: WORK EXPERIENCE CONT’D

PIPEFITTER - INTERNATIONAL PAPER MILL: Mansfield, LA

oErected all two % chrome piping on 1500# steam from main steam header to steam turbines on electric generators.

oPulled final alignment with millwrights.

PIPEFITTER - EXXON CHEMICAL: Baytown, TX

oErected all two % chrome piping and 9% chrome piping from all electrically driven turbines in a heavy crude unit.

oPulled final alignment on turbines with millwrights.

BOILERMAKER - SHELL CHEMICAL: Deer Park, TX

oPerformed major reworking phenol/acetone unit after major fire.

o200+ man hours working chemical flame suit with Scott Air Pack removing all phenol contaminated piping, vessels, inter- and after-coolers replaced and participated in start-up.

BOILERMAKER/RIGGER/MILLWRIGHT - WEYCO (WEYHOUSER PAPER MILL): Valiant, OK

oDesigned and constructed two Sky Climber platforms (20' and 14' diameter) outside digester to erect inside digester, perform NDE testing, and repair of any cracks found in digester.

oReplaced defibrators and deshivers and replaced NASH vacuum pumps in VAC-all system.

BOILERMAKER - MONTICELLO STEAM ELECTRIC STATION: Monticello, TX

oMaintenance repair work to air preheaters and fly ash duct work

PIPE FOREMAN - NATURAL GAS COMPRESSOR STATION: Bienville, LA

oFinal alignments on multi-stage natural gas compressor which required major rework on all piping at compressor.

PIPEFITTER/BOILERMAKER/MILLWRIGHT - UNION CAMP PAPER MILL: Prattville, AL

oWorked in Goslin Products evaporator unit for new construction and start-up.

oMade engineering revisions on condensable gas system.

oChemical suit [40 hours experience] with Scott Air Pack

oTransferred to powerhouse to make revisions in steam drum trays in power boiler.

oTransferred to digester area for

Final alignments with millwrights on all pumps, and to pull final alignments on top separator to digester.

oTransferred to wet end on paper machine; made engineering revisions to head box and lube oil system.

PIPEFITTER - TEXAS EASTMAN: Longview, TX

oRemoved two % worn chrome piping, replaced PSV and control values throughout liquid oxygen plant under shutdown conditions.

PIPEFITTER - LAGLORIA OIL REFINERY: Tyler, TX

oRemoved worn piping, pumps, and control values throughout gasoline storage facility (tank farm)

oRebuild and start-up of coal liquification plant after two major vessels failed causing extensive damage.



Contact this candidate