Post Job Free

Resume

Sign in

Project Management Electrical Engineer

Location:
New Hubli, Karnataka, 580020, India
Salary:
As per company standards
Posted:
November 16, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

ELECTRICAL ENGINEER

SHAFI AHMED. MULLA

H NO. NO 103/11, Mantur Road, Hubli

Karnataka, INDIA

Mob, 0091 – 888-***-****

E-mail : ad07ir@r.postjobfree.com

Holder of Qatar Driving License

Educational Qualification: 1 - Bachelor of engineering (Electricals & Electronics), From 1998 to 2002

Training Certificates: 1 - Certificate of Accredited Authorized Person for initial verification of electrical installation (Eastwood Park UK) 2 - Accredited Authorized Person for low voltage (LV) Certificate

3 - Accredited Authorized Person for Lift Management LOLER & SAFED certificate

4 - Accredited for NFPA 99 & 101 Certificate (Eastwood Park UK)

5 - Project Management professional (PMP) course completed

6 - Certificate of Project management professional (PMP)®

Experiences:

PROJECT MANAGEMENT, FEED, CONSTRUCTION, ERRECTION, INSTALLATION, TESTING, COMMISSIONING & ENERGIZING

Having practical hands of working knowledge of project management, permit to work “Ecpw “system to implement proper permit to work procedure, co-ordination, construction, erection, installation and testing of High, Medium & Low Voltage equipments, 132/33/13.8 KV substation, electrification works (OHL & Underground) protection relays, CT, PT testing, Generators testing, RMU testing, 132 kv power transformers testing, 132 kv power cabling testing (Above ground and Underground), Installation of cable trays, Power Distribution Panels, MCC,PCC, HV/MV Switchgear panels, Substation earthing system testing, Lightening Arresters, ATS, VFD, DPB, LCP, UPS, Low Current System, Internal & External Lighting Systems

Provided professional support to the testing team at site to test (Above ground and Underground) power cable, HV/MV power transformers, HV/HV, SWGs, transformer oil testing, AC/DC UPS, HV/MV control panels, earthing system, Fire alarm system, public address system

Provided professional support to the management team within the Division, helping to ensure high quality service delivery and a co-ordinated response to Clients; Performing design review of all Contractor submissions such as, design drawings, reports and material submittals related to HV/MV/LV MCC, PCC, LV and MV Motors, transformers, detuned capacitor panels, AC/DC UPS, lightning Protection and earthing system, and capable of reviewing calculations and studies submitted by contractor including load flow, short circuit, protection setting and coordination, earthing and lightning protection studies, lighting calculations, UPS and battery sizing, Motor starting and acceleration studies etc

INVOLVED IN QA/QC

Review the contract documents (drawings and specification related to his discipline) and informing to the Construction manager, if any deficiency

Review Contractor’s submittals, related to project, and ensure its compliance with concept design, contract requirements and properly coordinated with other disciplines.

Review shop drawings, related to his discipline, and ensure its compliance with design requirements, contract requirements, properly coordinated with other disciplines and submitted as per the approved schedules.

Review and approval of Materials, related to his discipline, ensuring compliance with contract requirements and submitted as per approved Project Construction schedule. Any deviation from project specification shall be notified to the Construction Manager vide Material Approval Request (MAR) Verification form.

Regular visits to Project site to ensure the quality of work is in compliance with contact requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report any deviations to Construction Manager.

Make sure that the Contractor has submitted the Method Statement (MS), Quality Control Procedure (QCP) and inspection & Test Plan (ITP) prior to stating the relevant activity. Inspection & Test Plans and other Quality Verification Forms address all necessary information outlined in the project specification or in the Manufacturer recommendations.

Review and approval of Method Statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP) as submitted by Contractor and ensure its compliance with all contract requirements.

Coordinate with COMPANY Senior QA Engineer to establish the intervention point in the proposed Inspection and Test Plan.

Reviewing Field Design Changes, related to his discipline, as submitted by Contractor by giving the technical position addressing any foreseen cost and Time Impact.

Technical support and assessment to Contracts Engineer and Cost Engineer of Trend Notices, approved variations and claims (when raised by Contractor).

Advise PMT Quality and Safety Engineers as well as Construction Manager of noticed non-compliance cases during site visits.

Regular spot checks of material delivered to site, related to his discipline, and direct the relevant Inspector! Engineer to continue inspection of stored materials on-site to ensure it is as per approved materials and in good condition.

Closely monitor inspector/engineer performance and advises the Construction Manager in case of deficiency or poor performance.

Technical support to PMT Planning Engineer with respect to the precedence of activities related to his discipline and optimum duration of each activity.

Attend Technical Meetings with the Contractor, and Weekly Progress Meetings if required by Construction Manager.

Ensure fun coordination between all other disciplines / Trades has been carried out for all External and Internal MEP services.

Review spare parts, operation & mainten2nce manuals of trades related to his discipline and ensure compliance with contract requirements.

Participate with PMC disciplines in reviewing the Close Out Report as submitted by the CONTRACTOR.

Review As-Built drawings related to his discipline as submitted by the Contractor. As-built drawing shall be properly coordinated with the site Inspection Team to make sure that it matches all site changes.

1 From Oct 2015 to December 2021.

M/s: Qatar petroleum By NES Global talent.

Project: 132 kv power supply through Submarine cable Ras-laffan to Halul offshore 102 KM.

Client: Qatar petroleum

Contractor: LS cable Korea

Designation: Electrical Construction Engineer & QA/QC Electrical Inspector

Accountability.

Review the all submarine cable project 132 kv power supply specification & requirement to ensure the quality of work.

Responsible to endorse the daily permit as “Operating authority” & apply the new Ecpw permit through “RAP net” system.

Contractor to adhere the permit to work “Ecpw “system to implement proper permit to work procedure.

Attend the Weekly management construction meeting about construction, installation & quality related work, timeline of project, proper manpower assignment of contractor.

Preparation of daily, weekly report & submit to Qatar petroleum Sr. project engineer.

Regular monitoring site to ensure the quality of work has to be maintaining of project as per ITP/QCP.

Supervise the team for timely and accurate work execution. Ensure that all the work activities get completed as per the quality norms and project specifications

Joint site walkthrough to ensure the requirement of construction, material, manpower, efficient supervision & effective monitoring.

To follow the four week look ahead schedule, to meet their target date by priority of subsystem.

Conduct the mechanical completion walk through with end user to generate the punch point.

To monitor the close out of punch point prior to issue the mechanical completion certificate for the priority of pre-commissioning work.

Review Mechanical, pre-commissioning & commissioning dossier to ensure all the required document is in line with approved document has been attached along the RLM drawing, vendor Drawing, vendor data sheet, project drawing etc.

Effective manage interfaces between new and existing facilities, ensure adherence to company golden HSE policies and Qatar petroleum specification, without effective schedule.

Attend with Kahramma representative & their commissioning team to ensure the requirement of kahramma” NOSP A & B” requirement & documentation work.

Nature of job

This project is involved on construction& commissioning to supply two 132 kv redundancy feeder to halul 132 kv new substation at “Halul Island” through subsea cable, installation 2 No’s of 60 Mvar tap changing shunt reactor, RMS system, 2 No’s RTCC panel & 132 kv, 800 power cable along 48 core fiber optic cable laying with three no’s of joint in between subsea cable to land cable, SVL Link box, Partial discharge system, Distributed temperature system (DTS) & lighting, earthing system including fire & gas installation. Involve in pre-commissioning & commissioning of 2 feeder land & subsea cable LV parameter testing including cable impedance, Ras - Laffan to Halul, end to end test, differential stability, shunt reactor REF stability test and interlock test. Installation of Fire & Gas System in the Field such as Push Button, Horn & Beacon and Fire Detection System

2 From Oct 2010 to 31st of August 2015.

M/s: HMC Qatar

Project: 33/11KV Sub-station

Client: kahramma

Contracor: HMC.

Designation: Electrical Project Engineer

Accountability

Review the all project specification & requirement to ensure the quality of work.

Contractor to adhere the permit to work system, implement proper permit to work procedure.

Attend the Weekly management construction meeting about construction & quality related work, timeline of project, proper manpower assignment of contractor, provide the open front to work for contractor.

Preparation of weekly report & submit to head of construction.

Responsible of E&I installation & inspection activities on the Site

Supervising & implementing all construction related capital projects

Periodic monitoring to site to ensure the quality of work to maintain requirement of project as per ITP/QCP.

Supervise the team for timely and accurate work execution. Ensure that all the work activities get completed as per the quality norms and project specifications

Joint site walkthrough to ensure the requirement of construction, material, manpower, efficient supervision & effective monitoring.

To follow the four week look ahead schedule, to meet their target date by priority of subsystem.

Conduct the mechanical completion walk down with & operation people to issue the punch list.

To monitor the closing of punch list prior to issue the mechanical completion certificate for the priority of pre-commissioning work.

Review Mechanical, pr-commissioning & commissioning dossier issue upon the comment.

Effective manage interfaces between new and existing facilities, ensure adherence to company golden HSE policies and KAHARMA specification, without effective schedule.

To attend the joint inspection with contractor & sub-contractor QA/QC to inspect all the work is completed as per kahramma project specification, during the inspection finding the discrepancy and issue construction punch point.

To attend the walk through to find out the safety related issue prior to energize the equipment’s.

Nature of job

This project is involved on construction of (33 kV substations which is feeding from kahramma through redundancy feeder by 300 2.5 KM interface, one LV substation in brown field which is feeding from new 33 KV substation, installation & eraction of 33/11KV power distribution transformer, 33 &11 KV switchgear metal clad with SF6 circuit breaker, 11KV motor, power factor panel, interposing relay panel, LV switchgear & lighting, earthings system. Also involve in pre-commissioning & commissioning activity on relevant system in substation.REF stability testing, differential scheme testing, inter close between upstream to downstream incomer breaker, installation & commissioning, witness for all protection relay setting and testing, Attend the SAT (site acceptance test) Responsible for field Instrument installation including Fire & Gas system, Instrument calibration, cable pulling from field to Control Room, JB installation and Glanding & Termination, Installation of Instrument and Execution of Inspection as per ITPs and QCs for each phase of instrumentation activities with Quality control department for final acceptance. Responsible for witnessing combined instrument loop check, commissioning at all instrument loops required for inspection final acceptance and mechanical completion reports as per project requirement.

3 From Mar 2007 to Sept 2010

M/s: M/s Tadmur Contracting & Trading Est, Doha QATAR

Project: Miscellaneous electrical work at ARAB-D Gas recycling plant in Dukhan field

EPIC to replace 3.3KV Switchgear and Transformer at NGL Messaieed

Client: Qatar petroleum

Designation: Electrical Project Engineer

Accountability.

Visual inspection for complete & correct application/installation

QC related duties monitored & related activities verified through inspections where applicable

Sign off on relevant ITP’s & check sheets for discipline activities

Reviewed specifications, drawings, method statements, QC procedures & inspection test plans. Maintained daily reports & log of daily activities

Ensured monitoring/ surveillance activities conducted ongoing basis

Carried out safety instructions & client (QP) procedures

Ensured that assessments of safety, economic impact & technical importance are performed

Whenever required. Due diligence is observed & initiated to secure the best result

Treated all information, both written & spoken, obtained in the course of the work with confidentiality.

Carried out work in compliance with client(QP) values & policies, procedures, regulations

Actively monitored Quality related activities such as pre-installation checks, installation compliance, pre-commissioning checks & associated risks with each of these areas & ensured problem areas are identified, reported & closed out.

Timely completion of project & tasks.

Brought forward suggestions for improvements within the areas of responsibility.

Carried out other work & responsibilities as per client (QP) separate instruction.

Engineering

oSite Survey, data collection/BOQ as per SOW & retrieving drawings from client (QP)

oPreparation of Technical Proposals related to project

oCoordinated with QP job officer, Designing/Engineering & DBM

oPrepared electrical technical specification & Data Sheet for material

oPrepared AFC drawings/method of statements/sizing & short circuit calculation

oPrepared technical inputs for the project

oReviewed drawings & submittal/approval/project meetings with client (QP)

oEnsured, Planning, progress, analyzing, coordinating & reported to client (QP)

oCoordinated with client (QP) approved consultant related to engineering, procurement & project

Procurements:

oPrepared requisition/ PO for client (QP) as per PVL (Preferred Vender List) suppliers

oEnsured purchased materials as per BOQ

oEnsured purchased bulk materials as per project requirements

oMobilized materials to site & prepared material inspection request (MIR) to QP

Installation:

oMobilized manpower, assets, tools as per project requirement

oConducted inspection & Tests as per material specification

oEnsured Execution/Installation work is carried as per AFC drawings & QP stds

oEnsured Execution of project work is carried as per construction schedule, histogram & submitted day to day

oMotivated & managed project work team to complete project before due time

oImplemented QP safety procedure during execution of project work

oEnsured conformity of QP work permit before executing of any project work

Commissioning:

oConducted site pre commissioning work & ensured approved test equipment on the site

oParticipated/Supported Audit activities on site

oPrepared test certificate, site inspection reports as per QP stds & executed electrical test in presence of QP representative

oControlled project test certificates/documents & records

oEnergized electrical equipment in presence of QP representative

oPrepared project dossiers, As built drawings, project completion certificate & submitted as per QP procedure

oObtained mechanical completion certificate by QP & handed over site

Nature of job

This project is involved on construction, installation& eraction of 16.5/250 MVA power transformer, 5000 ampere isolated bus duct from, low voltage & medium voltage cable laying, cable tray for power & lighting welding outlet, field lighting, also glanding termination in switchgear, motor and solo run test low & medium voltage motor.Field instrument installation, cable Meggering & continuity check. Instrument component installation, inspection & final commissioning of inst./DCS system loop from field instrument to main console monitoring system, Functional testing of all loops, including fire and gas, Electronic analog and digital signals & Emergency shutdown (ESD) system

4 From 2003 to 2007

M/s: Al – Gihaz Pvt ltd, K.S.A

Project: Electrical outdoor Substation (132/33/13.8KV) in Al-Bisha south, Al–Tannuma, Al-Zizan, Saudi

Client: Saudi Electricity Company

Designation: Electrical Site Engineer

Responsibilities/ Accountabilities

Installation Electrical Equipment

oPower transformer up to 133MVA & auxiliary transformer (Station transformer 13.8/0.415KV)

oPost insulator or bus support insulator (132KV), 132KV circuit breaker (outdoor CB)

oDisconnector switches with or without ear thing & capacitive voltage transformer (132KV CVT’s)

oInstallation, surge Arrester, bus bars, equipment structures, 33/13.8KV Switchgears, batteries

oEar thing grid work & transformer oil filtration & testing (BDV),

oLaying power Cable (132KV, 33KV, 13.8KV), cable tray & termination

oInstallation control panels in control building (132/33/13.8KV, Synch panel, SER, FR, SCADA)

oInstallation of AC/DC Panels (AC/DC Room) & termination

oExecution/Installation work is carried as per construction schedule, histogram & AFC drawings/std

oMonitored the job progress, Quality & attended safety meetings

Inspection, Testing & Commissioning:

oConducted Site pre commissioning work

oConducted the inspection with clients

oInspected, Tested & prepared check sheets for E&I activities

oInspected & Tested Motors. Motor configuration, SMBs, DBs & Bus bar

oInspected & Tested – IR, High pot test XLPE power cable, open circuit, short circuit & polarity tests for Transformer

oInspected & Tested electrical wiring - IR, loop test, Loop impedance test, polarity test, CB functional test

oInspected & Tested UPS & UPS Panel

oInspected Fire & Gas Systems, (a) F&G Panels. (b) Smoke Detectors, Heat Detectors, Gas Detectors & Manual Call Points (d)

oCO2 Cabinets to Control Panels & Terminations.

oInspected & Tested indoor, outdoor lighting circuits & Plant earthing system

oRectified action plan for generated Punch List & NCR

oPrepared of Check Sheets, ITR & Clearing Punch list &NCR

oEnsured approved Test equipment & execution of electrical test in presence of client (SEC) Consultant representative

oControlled project test certificates/documents & records

oEnergized electrical equipments & recorded energized certificate,

oPrepared project dossiers, project completion certificate, Mechanical completion certificate & submitted as per client (SEC) procedure

CRITICAL EXPERIENCE

Proven ability to execute on engineering deliverables

Strong client service mindset and mentality of delivering quality of work on time and within company cost and profitability objectives.

Fluent communication skills facilitating collaboration with own team, client, internal department leaders and technology leaders to create value.

Individual self-motivated and minimum supervision, have strong planning skills and be able to deal with and balance multiple competing priorities

COMPETENCIES

Excellent motivational skills: ability to achieve goals and the highest standards of performance in a dynamic fast paced environment.

Attention to detail and on time delivery

Excellent judgment, timely and high-quality decision-making skills

Clear, strategic thinker with the ability to identify, analyze, and solving complex problems.

MOTIVATIONAL/CULTURAL FIT

Results driven

Clear and concise communication

Problem solving

Passion for technology

Willing to travel

Fluent English

PERSONAL DETAILS

Gender: Male

Passport No : W-3084567

Date of issue : 28.07.2022

Date of expiry : 27.07.2032

Date of birth : 13.07.1980

Marital Status : Married

Nationality : India



Contact this candidate