Post Job Free

Resume

Sign in

Project Manager Technical

Location:
Abu Dhabi, United Arab Emirates
Salary:
30000
Posted:
November 14, 2023

Contact this candidate

Resume:

SAMEH SALEM A. MOATY

Engineering / Technical Manager

Projects / Project Manager

Address

Al Reem Island

Abu Dhabi, UAE

Contacts

+971-*********

ad05u4@r.postjobfree.com

Personal Details

Date of Birth: 30/3/1978

Marital Status: Married

Nationality: Egyptian

LANGUAGES

Arabic: Mother Tongue

English: Excellent

Speak – Reading – Writing

Professional Summary:

Engineering-Technical Manager / Project Manager:

With more than 22 years’ experience in Engineering/design/Installation/testing, commissioning of all Electrical works and projects management as well as O & M, including 12 years in UAE with multinational organizations and contracting companies. Approved Technical Manager for the Engineering department assigned for infrastructure projects’ constructions. Approved Project manager for O & M projects as well as handling all Electrical Engineering activities in the organization. Great ability for the turn key projects using all the resources & tools to represent developers and investment groups, supported by strong relations and contacts with key persons in UAE and Gulf area. Particular experience in Local Authorities regulations and international standards along with ADNOC Offshore, ADDC, ENEC and TRANSCO Competency certificate approval. Also, strong ability to initiate electrical engineering documentation and design. PERSONAL SUMMARY

• Project management skills including leadership, strong communication, risk/cost management, critical thinking for the project path and good ability for organizing and negotiation for the, STP’s, RO unit’s as well as recycled water projects and Marine works.

• Technical Management skills with leadership ability to guide a complete design team with strategic thinking, provide a technical direction and vision for the team, supporting individual Engineers, organizing and review the design with project team members and have a great ability to work under pressure.

• Engineering Management Skills with full capability of project engineering initiation, designs, planning as well as reviewing all project design aspects, value engineering, supervising complete engineering team with identified technical solutions within logical project time frame and effectively cost designs.

• Electrical Engineering skills using Design software, as Equodial/Schneider 4.08, E Lux, etc. following the international standards: BS-7671/EN60439, IEC- 60364, RSB regulation for Electricity Wiring 2007/2020 & similar prospective standards as well as local standards: DoE, ADDC, ADEWA, DEWA, SEWA, etc.

• Preparing all Design / Full Engineering documents / technical material submittals for electrical and instrumentation.

• Professional for using AUTOCAD software for Design/Detailed Engineering drawings.

• Preparing all Material list / LPO’s and following up with suppliers FAT, SAT & delivery.

• All design and Site Installation works with managing all staff / teams.

• Offshore approval for ADNOC platforms works including TBOSEIT / HSE training.

• Testing and commissioning with final handing over to the client.

• Strong IT literacy, with the ability to quickly learn new software packages.

• Excellent communication and interpersonal skills with the ability to relate effectively and professionally to people at all levels.

• Flexible and enthusiastic approach, combined with a strong work ethic.

• Able to grasp new concepts quickly as well as think laterally and creatively.

• Proven time management skills, a high attention to detail and experienced in managing numerous projects simultaneously.

+971-*********

Education

Bachelor of Electrical Engineering

Electrical Power & Machines Dept.

Ain Shams University – Cairo, Egypt

Sep. 1995 – June 2000

Key Skills:

Graduation Project Title:

Design of Power System Planning,

sub transmission & distribution,

medium and Low Voltage networks.

A. Jan 2023 – Present: Arabic Engineer Controls & MEP Systems Abu Dhabi, UAE

Engineering Manager:

1- Complete Project initiation, including the project plan, project deliverables, project & engineering schedules, work programs. 2- Full engineering review, verify and acceptance for the company’s projects including the newly and existing ones.

3- Research and develop all the design documents and establish alternative solutions with a good value engineering practice matching with the required standards and costly effective.

4- Oversee the required training for the for the engineering staff and provide the required plans to cover the requisitions of the project SOFTWARE KNOWLEDGE

• AutoCAD

• MS Office (Word, Excel,

PowerPoint, Access, IE, Outlook)

• Revit, Electrical Design

• Equpdial, Schneider Electrical

Design

• DiaLux, Lighting Calculations

• primavera P6, Professional

Projects & Authorizations Approval:

1. ADDC Project manager:

O & M of Recycled Water network and pump stations and tanker filling stations (Abu Dhabi Island & Al Dhafra Region) Contract No. D-109609 & D- 109608

2. TRANSCO Project manager:

Blanket Agreement for Maintenance Contract of the subsurface facilities of the Strategic Water Storage/Recovery (SWSR) at Liwa, Project No. N- 18163/A

3. TRANSCO Project manager:

Engineering, Procurement and Construction of works for RO implementation, Project No. N-17315 & N-17315-VO1

4. TRANSCO Project Manager:

Procurement, installation and commissioning for mobile hypo chlorination system Project No. TRANSCO (N-16016)

5. ADSSC Project manager:

Supply & Installation of Auto Samplers for sewer Manholes, Project No. ADSSC O-14814

6. ADSSC Technical manager:

Construction Works for the Upgrade of WWTP’s at Al Shuwaib & Ghantoot Project No. ADSSC O-14902.1

7. ENEC Technical manager:

Engineering services for the construction of infrastructure support for 1600 ASU inside Barakah Nuclear Power Plant – BNPP & Associated works. 8. ADDC Competent Person:

Authorized to work on Crossing and protection for ADDC’s assets – CP4/LAB

9. TRANSCO Competent Person:

Authorized to issue work permit for Electrical / Mechanical Works / LAP 10. ADNOC Project coordinator:

GCC (Gulf Contracting Company), Ruwais Housing Complex Expansion- Phase IV, New Water Pipeline – Package 1, Project No. 7010-Agreement 147010C1

11. ADNOC offshore TBOSIET

Authorized to work on ADNOC offshore platforms

12. Project Deputy Manager:

Design & Construction for Sila Waste Water Treatment Plant Expansion and External Sewer Work for Sila Emirati Housing - Project No. ADSSC-O11014 13. Testing and Commissioning Engineer:

Miscellaneous Works related to Development projects in Abu Dhabi Emirate, Phase-4 Network, and WWTP Capacity Enhancement at Madinat Zayed - Project No. ADSSC O-11542

Work Experience:

PROJECTS INVOLOVED

• Expansion and Development of

Supervisory Control and Data

Acquisition (SCADA) for ADSSC.

Project No. O-15042.1 – Ongoing

• Maintenance & Support for SCADA

system of Recycled Water network.

Project No. D-109000

• Operation and Maintenance of

Recycled Water Network, Pumping

Stations and Tanker Filling Stations

in Central and Al Dhafra Regions.

(D-109068/9) - Completed

• Engineering Services for STP inside

Barakah Nuclear Power Plant. ENEC

• EPC for Implementation works of

RO Units in Lulu Island, Al Reem

Island & Al Sadr in Abu Dhabi

Project No. TRANSCO (N-17315) –

Completed

• Operation and Maintenance of

STP’s & all water systems in Al Ain

Military Camps CMW (FM-2000-

039) - Completed

• Operation & Maintenance of the

water maker systems in ADNOC

offshore platforms – Completed

• Supply and Installation of

Automatic Samplers for Sewer

manholes Project No. ADSSC (O-

14814) – Completed

• Procurement, installation and

commissioning for mobile hypo

chlorination system. Project No.

TRANSCO (N-16016) – Completed

• Miscellaneous Works related to

development projects in Abu

Dhabi Emirate, Phase-4 Network,

WWTP Capacity Enhancement at

Madinat Zayed. Project No.

ADSSC (O-11542) – Completed

• Upgrade Infrastructure in Al

Quoa, Wadi Al Falie & Al Hayer

Remote Area, Al Ain. Project No.

ADSSC (O-12097) – Completed

• Design & Construction for Sila

Waste Water Treatment Plant

Expansion and External Sewer

Work for Sila Emirati Housing

Project No. ADSSC (O-11014) –

Completed

• EPC for Khalifa port industrial zone

(KPIZ) WWTP with 4 pumping

stations- (Abu Dhabi) with client

ADPC and project management

BECHTEL

• Rehabilitation of International City

Sewage PS (Dubai) – Al Nakheel

• EPC for Sky Courts Towers WWTP –

MBR (Dubai)

• Engineering Services for Northern

cement industries company – RO

Plant (Saudi Arabia)

• EPC works for Al Khor WWTP

expansion – Phase 2 with KAHRMA

(Qatar)

• Extension of Ababa WTP- Phase 2-

Cairo (200,000 m^3/day)

• Extension of Al Amerya WTP- Phase

2-Cairo (200,000 m^3/day)

• Extension of Al Khanka WTP- Phase

2-East Cairo (34,000 m^3/day)

• Extension of Al Badrashen WTP-

Phase 2-South Cairo (34,000

m^3/day)

• Extension of Ibashdat/Bani Amer

WTP- Phase 2-Upper Egypt (24,000

m^3/day)

• 6th October Waste Water Pumping

Station – West Cairo

• Operation & Maintenance of the

greatest waste water treatment

plant in East Cairo –Phase 2 (El

Gabal El Asfar) (with peak flow

650,000 m^3/day)

management to meet the standard requirements for the project completion.

5- Responsible to hire contractors and employees to work on various projects. Ability to develop policies, procedures, and systems that help the team work together efficiently.

6- Reviewing project proposals, tracking progress, Ensuring quality control and procedures.

7- Prepare all project documentation including the technical submittals, design drawings, preliminary and detailed design reports. Project Manager:

1- Leading the project management for SCADA project with AD SWS, Arranging the project plan and guide overall activities, organize the team members and Project Engineers.

2- Responsible for projects mobilization plan, organization charts, company policies.

3- Define the project’s scope and determine available resources & set time estimates and evaluate the team's or teams’ capabilities. 4- Controlling time management and set realistic deadlines, and good ability to communicate with all project parties.

5- Cost estimating and developing the budget, maintain all the necessary actions in order the project meets a client’s expectations and is completed on time.

6- Analyzing and managing project risk including identify and evaluate potential risks either before the project begins or during the project execution period.

B. Dec 2012 – Dec 2022: Pure Water Technology LLC. Abu Dhabi, UAE

Projects/Project Manager:

1- Leading all projects’ managers for O & M projects, plan and guide overall activities, organize the team members and Project Engineers. 2- Responsible for projects overall plans, organization charts, company policies.

3- Define the project’s scope and determine available resources & set time estimates and evaluate the team's or teams’ capabilities. 4- Create a clear and concise plan to both execute the project and monitor its progress.

5- Organizing and motivating a project team & developing clear, straightforward plans that stimulate Design and site teams to reach their full potential.

6- Preparing, reviewing all required asset assessment report and evaluation for the required overhauling, maintenance and replacement criteria. 7- Controlling time management and set realistic deadlines, and good ability to communicate with all project parties.

8- Cost estimating and developing the project budget, maintain all the necessary actions in order the project meets a client’s expectations and to be completed on time.

9- Analyzing and managing project risk including identify and evaluate potential risks either before the project begins or during the project execution period.

10- Monitoring the project progress and maintain the project baseline program on the specific timing including the engineering part, procurement, construction, testing and commissioning and final handing over to the client.

11- Managing reports and necessary documentation and present comprehensive reports documenting that all project requirements were fulfilled, as well as the projects’ history.

Technical Manager / Senior Electrical & Instrument Engineer: 1- Leading the design / engineering team with strategic thinking, provide a technical direction and vision for the project.

2- Organizing and review the design with project team members 3- Responsible for implementation for the project design strategy. 4- Guide and supervise the design team and Engineers. 5- Establishing and enforcing technical standards and policies. 6- Prepare all the Electrical Engineering and Design for the project including Single Line Diagrams, Electrical Calculation for Load schedule, Transformer and Generator Sizing, Cable Voltage Drop with particular sizing and selection and also for Power Factor according to project specification and authorization regulation plus international standards. 7- Completion for Design Reports including P & ID, Detailed Design Report and project

8- Control Philosophy as well as HAZOP Studies.

9- Completion for Civil Outline/GA drawings, Plant Layout, Cables Rout, instrumentation

10- Hookup detailed Drawings

11- Completion for Design of Lighting (Internal & External) and small power system

12- Including detailed feeding circuits with related DB schedules. 13- Establish for all detailed design electrical Shop drawings including lighting and small

14- Power, fire alarm, telephone system, earthing and lightning protection, cable routing

15- With full coordination with MP Drawings and HVAC. 16- Create control / instrument cable schedule and interconnection loop diagrams.

17- Completion of all electrical technical material submittals (Selection for MCC’s, power factor correction panel, Cables, Cable accessories, Cable trays, Lighting and small power with wiring accessories, instruments, earthing and lightning protection material) and all related method statement for installation with safety procedures and Risk Assessment. 18- Establish the general architectural schematic diagrams for PLC / SCADA system and prepare the control system material submittal with system integrator.

19- Establish over all testing and commissioning plans for completion and handing over procedures. Arrange FAT/ITP/ITR/SAT documents and attend with the engineer/client for all electrical and control system facilities.

20- Full coordination with documents controller/QA & QS engineers to estimate and finalize all time and work progress schedules plus and design submission follow up log sheets and estimate all variation works and submit to the engineer/client.

21- Prepare all documents/design drawing to DoE/ADDC/AADC for permanent/temporary power connection and follow up till final power release.

Site Work Responsibilities:

1- Supervise all activities for the project Installation, testing, commissioning with handing over electrical works.

2- Guide and supervise all installation/testing of electrical facilities (MCC’s, Capacitors panels, PLC & SCADA, Cables, Cable trays, lighting and small power accessories, HVAC systems, junction boxes, local control panels with complete termination and connection.

3- Installation and connection for different kinds of instruments (ultrasonic, hydrostatic level sensors and transmitter. Electromagnetic flow meters. Analyzers transmitters such as pH, DO, Chlorine. Pressure transmitters. Level/flow/pressure switches).

4- Present all related IR’s, RFI, Work permits to the engineer/Client, O & M with related justification and clarification.

• I am looking forward & hardly working

to improve my career and prepare for

my next position as an OPERATIONS

MANAGER or a GENERAL MANAGER

inside the prospective organization.

• My professional & experience are

based on the project management,

technical supervision, complete

engineering, design, installation,

testing & commissioning along with

operation and maintenance for the

waste water and water treatment

plants including pumping and lifting

stations and related units and facilities

associated with such plants.

• The experience including the electrical,

control and instrumentation sections

for the whole project and also perfect

knowledge with mechanical

installation.

• Seeking a challenging career were my

professional & educational could be

utilized & will be progressed, gross can

be achieved also my skills may be

developed.

• Team-work as very effective.

• Working under pressure.

• Strong ability to learn.

• Highly communication skills with team

work leader as well as member and

others involved in the project.

• Always seeking a higher position inside

the organization, do the needful to

increase the ability for the company to

complete all project management &

engineering works with minimizing all

related cost and efforts with good

practice time/cost schedules.

• Willing to travel for strong

communication and attending on

abroad for more effective progress and

perfect coordination.

PERSONAL SKILLS

1. Engr. Hani Weheda – AAW Consultant

Engineers, Abu Dhabi.

General Manger:

009**-*********

ad05u4@r.postjobfree.com

2. Engr. Ahmed Zaki – ILF Consultant

Engineers, Abu Dhabi.

Water Urban Development Dept. Head:

009**-*********

ad05u4@r.postjobfree.com

5- Preparing all testing and commissioning plan and handing over documents and submit all related as built drawings and O & M Manuals to the engineer/client.

C. Apr 2011 – Dec 2012: Metito Overseas LLC, HQ.

Sharjah, UAE

Main Responsibilities:

1- Prepare all the Electrical Engineering and Design for the project including Single Line Diagrams, Electrical Calculation for Load schedule, Transformer and Generator Sizing, Cable Voltage Drop with particular sizing and selection and also for Power Factor according to project specification and authorization regulation plus international standards. 2- Completion for Design Reports including P & ID, Detailed Design Report and all related drawings.

3- Control Philosophy as well as HAZOP Studies.

4- Completion for Civil Outline/GA drawings, Plant Layout, Cables Rout, instrumentation Hookup detailed Drawings.

5- Completion for Design of Lighting (Internal & External) and small power system including the related detailed drawings & feeding circuits with related DB schedules.

6- Establish for all detailed design electrical Shop drawings including Power circuits, fire alarm, telephone system, earthing and lightning protection, cable routing with full coordination with MP Drawings and HVAC.

7- Create control / instrument cable schedule and interconnection loop diagrams.

8- Completion of all electrical technical material submittals (Selection for MCC’s, power factor correction panel, Cables, Cable accessories, Cable trays, Lighting and small power with wiring accessories, instruments, earthing and lightning protection material) and all related method statement for installation with safety procedures & risk assessment. 9- Installation and connection for different kinds of instruments (ultrasonic, hydrostatic level sensors and transmitter. Electromagnetic flow meters. Analyzers transmitters such as pH, DO, Chlorine. Pressure transmitters. Level/flow/pressure switches).

10- Prepare & submit all related IR’s, RFI, Work permits to the engineer/Client, O & M with related justification and clarification. 11- Establish overall testing and commissioning plan for completion and handing over procedures. Arrange FAT/ITP/ITR documents and attend with the engineer/client for all electrical and control system. 12- Full coordination with documents controller/QA & QS engineers to estimate and finalize all time and work progress schedules plus and design submission follow up log sheets and estimate all variation works and submit to the engineer/client

13- Prepare all documents/design drawing to local authorities for permanent/temporary power connection and follow up till final power release.

D. Aug 2008 – Apr 2011: Metito Overseas LLC.

Cairo, Egypt.

Senior Electrical & Instrumentation Engineer:

Site Work Responsibilities:

1- Installation, testing, commissioning with handing over electrical works. 2- Guide and supervise all installation/testing of electrical facilities (MV Switch gear, MV Motors (600 kw/11 KV), MV Auto Transformers with Built in Capacitor Bank along with the HVDC and associated control system, interlock and power supply management arraignment, LV Switch boards & MCC’s, Local Control panels, Filter Control Desks, Motorized REFERENCES

E. May 2004 – Aug 2008: Nile Degremont LLC. Cairo, Egypt. a. Operation Team Leader b. Deputy Team Leader c. Electrical Engineer Site Work Responsibilities:

1- Installation, testing, commissioning with handing over electrical works. 2- Joining with the company during testing, commissioning and plant performance stage.

3- Lead and supervise a complete technical team consist of Electromechanical engineers/ technicians for plant startup, reliability test then O & M activities.

4- Organize and distribute the work responsibilities for all team members. 5- Prepare schedules for Preventive & Corrective Electrical/Mechanical Maintenance.

6- Prepare all areas & equipment’s check lists and maintenance reports and submit it to the engineer/client on daily/monthly basis. 7- Also record the daily reports for all operation and maintenance events. 8- Operation and maintenance (preventive/corrective) for the plant equipment’s including:

• MV/LV Switch gears, ATS Panels with feeding network maneuver.

• HVDC with the associated control system with synchronization and interlock systems as well as plant power supply arrangement.

• Different kind of pumps (screw pumps 400 Kw-11 Kv, Centrifugal, positive displacement, diaphragm).

• Higher technology VFD air blowers (710 Kw-11 Kv).

• Biogas compressors/boilers and associated heat exchangers.

• Equipment included in process units/tanks such as grease and sand removal travelling bridges, primary/secondary and biological aeration tanks, dissolved air floatation and sludge thickening facilities, mechanical dewatering with belt press, chlorination dosing and leakage detection system, R.O units for service water. 9- Dealing with equipment failure and find alternative immediate solutions. 10- Ensure all O & M activities have been done with complete safety conditions.

Project Involved:

The greatest waste water treatment plant in East Cairo –Phase 2 (El Gabal El Asfar) (with peak flow 650,000 m^3/day)

F. Aug 2002 – May 2004: Beauty Shoes for soles. Cairo, Egypt Factory Deputy Manager

Main Responsibilities & work activities:

1- Installation, testing & commissioning for the injection and casting machines with hydraulic pressure up to 120 bar.

2- Same for the accessories’ units in the factory such as boilers, heat exchangers, cutter machines and heavy loading machinery. 3- Design and install power/water/air supply for the machinery inside factory.

4- Follow up the operation and production.

5- Organize and distribute the work responsibilities for all factory members. Valves/Penstocks Control Panels, Cables, Cable trays, lighting and small power accessories, HVAC systems, junction boxes with complete termination and connection.

3- Preparing all testing and commissioning and handing over documents and submit all related as built drawings and O & M Manuals to the engineer/client.



Contact this candidate