Post Job Free

Resume

Sign in

Commissioning Engineer Specialist / Mechanical completion and Turnover

Location:
Corpus Christi, TX
Salary:
135,000 yearly
Posted:
November 12, 2023

Contact this candidate

Resume:

RODOLFO M. ALEJANDRO

*** ***** *********, ****** *******, TX 78401 ad02yk@r.postjobfree.com 901-***-****

CAREER SUMMARY

Several years of combined professional experience in chemical manufacturing and process operations, pre-commissioning start- up and commissioning, mechanical completion and turnover of petrochemical, gas-oil, power generations and mining industry.

Experienced in project management, supervision, project coordination, training, QA/QC

checking product quality, packaging and inspection.

SPECIFIC EXPERIENCE INCLUDES:

Assist in the subsystem and system scoping.

Perform and generate procedures for pre-commissioning activities of utilities and process piping such as water flushing, air blowing, steam blowing, lube oil flushing, nitrogen purging and sensitive leak testing. Motor solo run and pumps mechanical run-in test, temporary piping fabrication, orifice installation, decommissioning, re-instatement and operation of various equipment.

Issue system walk down notice to all required participants for systems and subsystems to be viewed.

Perform facilities system walk down with contractors and client representatives. Generate punch list items. Maintain the site master punch list of items generated from mechanical completion walkdown.

Issue formal notification of Mechanical Completion to Client and acquire required signatures. Coordinate with different subcontractors regarding Turnover Packages requirements. Develop Turnover Package, containing system description, scope boundary drawing, components listing and other relevant information to define the scope of the system. Review and ensure that all marked up P&ID are red lined properly and issued. Review Turnover Package submitted by subcontractors. Develop the final turnover packages by compiling the data from the subcontractor turnover packages to ensure packages are organized and consistent prior to submittal for client approval. Review of notice of completion and preparation of turnover books for transfer, care, custody and control.

SKILLS

Time Management

Construction Management

Communication · Written Communication

Pre commissioning writing Procedure

Piping

Piping and instrumentation diagram (P&ID)

Process flow diagram PFD

Isometric Drawing

Piping components

Metal Fabrication

Hydrotest

Equipment

Mechanical Equipment (pumps and compressors, Tanks and Vessels, Exchangers)

Electrical Equipment (cable index)

Instrumentation (Instrument index, Calibration)

Civil, Structural and Architecture

System and subsystem scoping

Basic knowledge in Microsoft Office (excel, power point), Complete it, Mc Plus, Navis (Smart plan), Adobe Acrobat, Bluebeam and Orbit

Pre-commissioning, startup and commissioning

Operation of motor pump and equipment

Mechanical Completion and turnover (TCCC)

Walkdown, punch listing, clearing and verifying

Lock Out Tag Out (LOTO)

Preventive Maintenance

Quality Control

Construction Site Inspections

Reinstatement

Review and develop turnover package

Hanover to client

EDUCATION

Manuel L. Quezon University Manila, Philippines

Bachelor of Science in Chemical Engineering

WORK EXPERIENCE

CCL Global / Kiewit Oil Services- Ingleside, TX

New Fortress Energy FAST LNG Project

Mechanical Commissioning Tech July 2023 – Aug 2023

Walked down the following systems identifying missing piping components, instruments, pumps and motors and reported leadman

Fresh Cooling Water System

Raw Water (Seawater) System

Potable Water System

Lube oil and Fuel Oil System

Rig Air and Cold Start System

Ensure proper installation of check valve in accordance with flow direction.

Act as witness on motor bump test on various pump motors checking for right direction like Standby Emergency Fire pumps, Bilge Ballast pump #1 and #2 and Lube Oil pump.

Next Wave Traveler-Clough USA, Pasadena TX

Ethylene Dimerization and Alkylation Project

Commissioning Engineer/ LOTO Coordinator Nov. 2022 – Feb 2023

Verify isolation boundaries for system/ equipment, placing locks and tags and energy isolation devices as required.

Confirm isolation on Energy Isolation Certificate.

Notify the authorized employees when the isolations are in place and they may begin to work.

Complete and maintain LOTO documentation as describe in LOTO manual and procedure. Maintain LOTO registry.

Responsible for removing boundary locks and tags, energy isolation devices as listed on Energy Isolation Certificates.

Kentz - SNC Lavalin GCVG Exxon Mobil- SABIC, Gregory, TX, USA

Mono Ethylene Glycol Project

Mechanical Commissioning Tech May 2021 to Oct. 2021

Walked down the system prior to energy isolation and deisolation.

De-isolating and Re-isolating EIC Points under Temporary Energization (TRE). De-isolating under Permanent or Partial Permanent deisolation.

Signing Energy Isolation Device (EID), Energy, Verification Point (EVP) and (OPE).

Perform pre commissioning activities such as pumps dynamic run and mechanical runs, air blowing, water flushing and gas and CO2 compressors lube oil flushing.

Monitoring lube oil pumps variables such as discharge pressure, lube oil filters pressure differential, lube oil header pressure lube oil tank reservoir level and temperature. Energy isolation and deisolation of systems.

Assist on filling demineralized water and or fire water on various tanks and vessels prior for pump’s dynamic or mechanical run.

Earthstream Global Inc. Enermech Mechanical Services Limetree Bay Refinery Project

St Croix, US Virgin Island

Field Engineer Sept. 2019 - Jan. 2020

Develop work package for pre commissioning such as water flushing, chemical cleaning, steam blowing, air blowing and hydro blasting.

Walk down each work packs and ensure its mechanically prepared before giving for hydro blasting and pre commissioning activities.

Fluor Corporation Sugarland TX, Greenville SC, On -Site

Commissioning Engineer / Specialist III / IV Oct. 2008 - May 2019

Project Completion with Fluor Corporation

Procter and Gamble Project Independence Inwood West Virginia

Turnover Lead June 12, 2017- May 25, 2018

Radford Ammunition Project Radford Virginia

Parttime Procedure Writer Sept 04, 2017 - Dec 15, 2017

Chevron Phillips USGC Petrochemical Project Baytown, TX

Commissioning and Turnover Jan 04, 2016 - March 01, 2017

BASF TGI Complex Project Ludwigshafen, Germany

Commissioning Engineer May 05, 2015 - Aug 28, 2015

SADARA Petrochemical Project Jubail Saudi Arabia

Construction Engineer- Specialist IV Aug 26, 2014 -Feb 12, 2015

Lundin Eagle Mining Marquette, Michigan

Pre commissioning Support and Mechanical Testing July 7, 2014 -Aug 15, 2014

SADARA Petrochemical Project Jubail Saudi Arabia

Inter Connecting Facilities Lead June 10, 2013 - April 7, 2014

OYO Tolgoi Mining Project Oyo Tolgoi, Mongolia

Commissioning/ Mechanical Engineer July 10, 2012 - Oct, 27, 2012

Saudi Kayan Petrochemical Project Jubail, Saudi Arabia

Mechanical Completion and Turnover Coordinator Aug 22, 2009 - June 24, 2010

Saudi International Petrochemical Project Jubail, Saudi Arabia

Pre commissioning Specialist Oct. 3, 2008 - Aug. 09, 2009

Robert Half /Account Temps / Meguiars Inc. 6750 Poplar Ave Memphis, TN 38138

Quality Assurance Auditor May 28, 2008 - Sept. 27, 2008

Responsible for checking product quality and packaging of BPI and VML’s MEGUIARS product in compliance with MEGUIARS standard.

Assures that all materials and components used to prepare finished goods are approved and properly delivered.

Assures all received materials and components are correct. Responsible for checking all items, including components, labels, bulk, cartons, pallet configuration meet the approved chart/display before use.

Assures the finished products are filled, labeled and package correctly. Rejects unacceptable goods.

Responds to detailed technical inquiries related to the quality and manufacturing issues that may requires some explanation.

VML Company 2070 Channel Ave, Memphis, TN 38113 USA

Process Operator/Quality Control Analyst March 10, 2003 - Oct.19, 2007

Operate process equipment within set parameters to mix required batches to specifications for use in production.

Perform QC line inspection and analytical works, including physical, chemical and instrumental methods.

Assures that all materials and components used to prepare finished goods are approved and properly delivered. Assures all received materials and components are correct.

Responsible for checking all items, including components, labels, bulk, cartons, pallet configuration meet the approved chart/display before use.

Assures the finished products are filled, labeled and package correctly. Rejects unacceptable goods.

Separation Engineers Inc. / CS Metal of Louisiana 7591 Hwy 3214 Convent LA 70723

Separation Specialist Oct. 25, 2001 - Feb 08, 2002

Review the design philosophy of Fines Recovery Process Plant, its equipment and control.

Writing pre-commissioning procedure such as water flushing system leak testing and mechanical run in of pumps.

Responsible for the proper operation of filter press.

Walked down and punch listing the system.

Pre- commissioning, start-up and commissioning of fines recovery plant of CS Metal of Louisiana.

Monarch Oil Inc. 2200 Ave HE, Omaha NE 68110

Plant Manager Chemical Engineer July 18, 2000 - Nov 24, 2000

Responsible for the proper, safe & efficient operation and maintenance of asphalt emulsion manufacturing plant and the plant boiler system.

Operating duties include, temperature, ingredient and truck loading control.

Ensure the proper loading of trucks with emulsions and asphalt.

Responsible for the installation of insulations on piping.

Responsible for the proper, safe & efficient operation and maintenance of asphalt emulsion manufacturing plant and the plant boiler system.

Operating duties include, temperature, ingredient and truck loading control.

Ensure the proper loading of trucks with emulsions and asphalt.

Responsible for the installation of insulations on piping.

Chiyoda Corporation Seraya Chemical Singapore Project Seraya Island Singapore

Piping Supervisor for Commissioning Sept 2, 1996 - March 31, 1997

Supervised piping activities in the installation and restoration of temporary piping pieces and piping components.

Supervised pre-commissioning and commissioning activities such as air blowing, water flushing, chemical cleaning, tightness test, hot bolting and others.

Assisted in the start-up and operation of Styrene Monomer Propylene Oxide, Polyol and Propylene Glycol Plant.

Chiyoda Corporation General Utilities Expansion Project ADNOC Ruwais Abu Dhabi,

UAE

Commissioning Supervisor Oct.15, 1995 - July10, 1996

Supervised subcontractor pre-commissioning work such as flushing and air blowing, motor solo run and mechanical run-in test, piping tightness test and P&ID line check of gas turbine, waste heat recovery boiler and multi-stage desalination plant.

Responsible for the remote-control operation and DCS Elsag Bailey operation regarding the start-up of general utilities and multi-stage desalination plant.

Trained client operation staff (Abu Dhabi National Company) the actual operation of the plant and the observance of safety operating procedures.

Consolidated Contractors Int’l. Co Inc. Abu Dhabi Gas 3rd LNG Train Project Das Island

Abu Dhabi UAE

Pre commissioning Supervisor Feb 21,1994 - July 13, 1994

Directed charge hand for definite area of activities in the field such as air blowing, water flushing, chemical cleaning, nitrogen purging, hot bolting, catalyst loading and others.

Assisted ADGAS plant operators in the start-up of LNG plant.

EEI Bechtel Kuwait National Oil Rehabilitation Project Al Ahmadi Kuwait

Process Supervisor Jan 1992 - Dec 1992

Responsible for the pre-commissioning and commissioning activities of gas-oil separator plant, crude oil desalting and dehydration plant such as air-blowing, water flushing, chemical cleaning, nitrogen purging and others.

Responsible for the proper operation of utility, and instrument air compressor, brackish and waste water pump system.

Basic Chemical Industries Ltd. Dammam Saudi Arabia

Process Plant Operator Dec 18, 1985 - Oct. 19, 1988

Responsible for proper operation of brine preparation plant, hydrochloric acid, mercury cell and de Nora membrane caustic chlorine plant.

Checked and record operating data.

Report to supervisor any discrepancies and abnormalities during operation.

Conducted laboratory analysis such as brine and caustic concentration.

Responsible for caustic and hydrochloric acid loading to storage tank and trucks.

Resins Inc. Bo. Bagong Ilog Pasig MMLA, Philippines

Production Supervisor June 6, 1976 - Dec 15, 1985

Act as technical consultant in all matters pertaining to plant processes and operation of all chemical plants (phthalic anhydride, sulfuric acid, formaldehyde and aluminum sulfate) and the air pollution control.

Responsible for the proper care and handling of all equipment, to see that

idle equipment is checked and necessary to use anytime.

Resins Inc Bo. Bagong Ilog Pasig MMLA Philippines

Chemical Technologist May 11, 1974 - June 5, 1976

Performed water, raw material and chemical product analysis.

Responsible for the operation and control of de-ionizer, sand filter, and water treatment plant.

Repaired and fabricated laboratory glass apparatus

REFERENCES:

1.Larry Felder - Ex-Turnover and Pre- Commissioning Manager CBI

ad02yk@r.postjobfree.com

832-215-412

2.Hurless Clouatre - Ex-Turnover and Pre-commissioning Manager (ret)

Fluor Enterprises Inc.

ad02yk@r.postjobfree.com

1-985-***-****

3.Ana Farokhi- Ex-Sr. Operation Manager

TESLA

ad02yk@r.postjobfree.com

1-858-***-****

4.Freddie Valdez- Ex-Commissioning Director

Freddie.Valdez @fluor.com

1-832-***-****



Contact this candidate