Post Job Free

Resume

Sign in

Electrical Supervisor High Voltage

Location:
Al Dafna, Qatar
Salary:
3000 $
Posted:
November 10, 2023

Contact this candidate

Resume:

ELECTRICAL SUPERVISOR

Contact No: +974-******** WhatsApp No. +923*********

Email ID: ad00ll@r.postjobfree.com

PERSONAL INFORMATION

NAME : GHULAM ALI BUGHIO

DATE OF BIRTH : 08.05.1983

EDUCATIONAL QUALIFICATION : DAE. (ELECTRICAL)

DRIVING LICENCE : KSA, PAKISTAN

GEOGRAPHICAL AREAS OF WORK : QATAR, KSA AND PAKISTAN

TOTAL YEARS OF EXPERIENCE : 18 YEARS

JOB PROFILE:

I have more than 18 years of experience in the field of Projects & Maintenance, Commissioning & Start-up activities in Electrical system in oil & Gas petrochemical & Power Generation Sector. I have strong technical & communication skills to lead the multicultural team for TAR Maintenance & Projects in a challenging Environment.

Installation, Testing, Commissiong of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.

Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards

Motor solo runs & functional tests of electrical equipment

Trouble shootings of all electrical equipment with safety one line diagram

AREAS OF EXPERTISE INCLUDE:

Construction

Pre-commissioning & Commissioning

Maintenance

Soft Skills

COURSE & TRAINING:

Electrical Supervisor

Electrical Wireman

Work Permit

Electrical Arc Flush Hazzard Protection

Electrical Shock Hazzard Protection

Respiratory Fit Test

Experience & Responsibilities

JUNE 2023 TILL DATE

COMPANY : ENGIE COFELY MANNAI QATAR DOHA

POSITION : ELECTRICAL SUPERVISOR

PROJECTS WORKED :

1.PROJECT COMMISSIONING AND PREVENTIVE MAINTENACE WORK OF KAHRAMAA DEPARTMENT

RESPONSIBILITIES:

Preparing & Submitting Daily in Progress Report to Field Engineer

Taking care of given tasks within HSE standards of the company

Co-ordination with project planning team for the work volumes. Man-hours and days required to execute the job.

Preparation of MTO & Procurement of the material required to execute the job.

Fabrication and Installation of Supports, Bus ducts, cable ladders & trays for primary and secondary cables.

Installation & Maintenance of small power and lighting systems

Installation & Termination of electrical junction boxes & electrical panels etc

Laying of HV/LV primary and secondary cables underground and above ground.

Installation & Commissioning of earthing system includes earth pits, earth grid installation, Cad welding etc

Installation, Testing & Commissioning of FM200 system.

Hands on knowledge on electrical Testing devices by using Megger meter, Micro meter, Neon high voltage hot stick tester, malty meter, clump meter, micro-ohms meter.

Witnessing MV &LV Motor solo runs & functional tests of electrical equipment

Maintenance of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels etc.

MARCH 2020 TILL APRIL 2023

COMPANY : SIEMENS ENGINEERING COMPANY LIMITED, PAKISTAN

POSITION : ELECTRICAL SUPERVISOR

PROJECTS WORKED:

1.EPC OF 2 660 MW COAL FIRED POWER PROJECT

RESPONSIBILITIES:

Preparing & Submitting Daily Progress Report to Lead Engineer

Conduct toolbox meetings with subordinates to discuss the work methodology and safety Hazzards.

Taking care of given tasks within HSE standards of the company

Preparation of work pack with approved AFC drawings as per Client standard & procedures.

Preparation and getting approval of package (Method Statement & JSA) for work permit.as per Client standard & procedures.

Co-ordination with respective discipline to execute the activities without any SIMOPS and any delays.

Co-ordination with project planning team for the work volumes. Man-hours and days required to execute the job.

Preparation of MTO & Procurement of the material required to execute the job.

Reviewing of project drawing and documents for installation of electrical and instrumentation systems.

Raising Technical Queries for missing inputs in project scope and engineering drawings.

Installation & termination of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.

Preparation and installation of temporary HVAC system, temporary power supply for project requirement.

Fabrication and Installation of Supports, Bus ducts, cable ladders & trays for primary and secondary cables.

Installation of small power and lighting systems including high mass pole installation

Installation of electrical junction boxes, equipment welding sockets and small power sockets.

Laying of HV/LV primary and secondary cables underground and above ground.

Installation of earthing system includes earth pits, earth grid installation, Cad welding etc

Installation of Sky Lightning Protection works for substation

Installation, Testing & Commissioning of FM200 system.

Hands on knowledge on electrical Testing devices by using Megger meter, Micrometer, Neon high voltage hot stick tester, malty meter, clump meter, micro-ohms meter.

Witnessing MV &LV Motor solo runs & functional tests of electrical equipment

Testing & Commissioning of earthing & lightning System

Testing, Commissiong of Major Electrical Equipment like Transformer, Switchgears, Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.

APRIL 2015 TILL DECEMBER 2019

COMPANY : SADARA PETROCHEMICAL, KSA

POSITION : ELECTRICAL TECHNICIAN

PROJECTS WORKED :

1.MIXED FEED CRACKER PLANT

RESPONSIBILITIES:

Supervising the Testing Solo run, visual inspection, Pre-Commissioning, Commissioning & Start-up activities of the all-electrical equipment’s & breakers up to 220 KV voltage

Managed and controlled all electrical equipment’s in mixed feed crackers process.

Complete ownership of substation 34.5 KV and collaborated maintenance activities.

Transient UPS Functional checking and commissioning

Commissioning for VFD’s for furnace ID fans.

Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards

Switching of Emergency MCC switch gears, breakers, Tie breaker, synchronize system,

Raked in and out of switch gears, work at static switch, feeder’s protection transformer protection, motors protection relies.

Maintenance work of power transformers, CT, PT, TP2, and relay sating’s transformers, motors

Coordination with OEM Vendors like ABB; Powell; Wesco’s; GE; Siemens, Schneider, Eaton.

Maintenance of AC equipment of different voltage limits ( i.e 24 volts, 110 volts, 220 volts, 480 volts, 4.16 KV, 13.8 KV, 110 KV, 220 KV & 230 KV)

Maintenance of DC equipment of different voltage limits (i.e.12 volts, 24 volts, 110 volts, 220 volts)

Setting out the GE Multiline 300 Feeder management relays, GE Multiline 745 Transformer management Relays, GE Multiline 369 & 469 Motor management relay & MM2 Motor management relays.

Trouble shootings of all kinds’ electrical equipment.

APRIL 2010 TILL MARCH 2015

COMPANY : M.S.AL. SUWAIDI INDUSTRIAL SERVIES CO.LTD, KSA

POSITION : ELECTRICAL SUPERVISOR

PROJECTS WORKED :

1.PREVENTIVE MAINTENANCE OF 25 OIL REFINERY- SAUDI ARAMCO

2.TURNAROUND OF SAFCO FERTILIZER- SABIC

3.TURNAROUND OF SADAF PETROCHEMICAL- SABIC

4.PREVENTIVE MAINTENANCE OF ALCOA - MAADEN ALUMINUM

5.TURNAROUND OF IBIN E ZAHAR- SABIC

RESPONSIBILITIES:

Preparing & Submitting Daily Progress Report to Lead Engineer

Conduct toolbox meetings with subordinates to discuss the work methodology and safety Hazards.

Taking care of given tasks within HSE standards of the company

Preparation of work pack with approved AFC drawings as per Client standard & procedures.

Preparation and getting approval of package (Method Statement & JSA) for work permit.as per Client standard & procedures.

Co-ordination with respective discipline to execute the activities without any SIMOPS and any delays.

Installation of Supports, Bus ducts, cable ladders & trays for primary and secondary cables.

Installation of small power and lighting systems including high mass pole installation

Installation of electrical junction boxes, equipment welding sockets and small power sockets.

Laying of HV/LV primary and secondary cables underground and above ground.

Installation of earthing system includes earth pits, earth grid installation, Cad welding etc.

Periodic maintenance of LV, HV switch board, DB and lighting / small power system and emergency service power network.

Testing, Pre-commissioning & Commissiong of Major Electrical Equipment like Transformer, Switchgears (33KV, 11KV, 415V), Tie Breakers, Isolators, Insulators, Breakers (MCC & EMCC), VFD Panel, UPS & Battery bank, Load bank, Capacitor banks, Diesel generator, Motors, Compressor, Low & High voltage Electrical Panels, Cooling Tower fans, Fin Fan etc.

Preformed the different type of electrical Testing by using Megger meter, Micro meter, Neon high voltage hot stick tester, malty meter, clump meter, micro-ohms meter.

Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards, fin fan, low & high voltage panels

Maintenance of AC equipment of different voltage limits ( i.e 24 volts, 110 volts, 220 volts, 480 volts, 4.16 KV, 13.8 KV, 110 KV, 220 KV & 230 KV)

Maintenance of DC equipment of different voltage limits (i.e.12 volts, 24 volts, 110 volts, 220 volts)

Maintenance of plant equipment grounding systems.

Setting out the GE Multiline 300 Feeder management relays, GE Multiline 745 Transformer management Relays, GE Multiline 369 & 469 Motor management relay & MM2 Motor management relays.

Preparation of Redline Markup & As-built drawing based on site conditions.

AUG 2000 TILL JUNE 2005

COMPANY : QALANDRI COTTON FACTORY, PAK

POSITION : WIREMAN ELECTRICIAN

PROJECTS WORKED :

1.PREVENTIVE MAINTENANCE OF QALANDRI COTTON FACTORY

RESPONSIBILITIES:

Preventive maintenance of Motors, Transformers, Generator, Lightings, cables, MOV, Electrical wirings, distribution boards, low & high voltage panels

Maintenance of AC equipment of different voltage limits ( i.e 24 volts, 110 volts, 220 volts, 480 volts, 4.16 KV, 13.8 KV, 110 KV, 220 KV & 230 KV)

Maintenance of DC equipment of different voltage limits (i.e.12 volts, 24 volts, 110 volts, 220 volts)

Maintenance of plant equipment grounding systems.



Contact this candidate