Thomas Hendrickson
***** ********* ****, ***** ***** • Tel: 713-***-****
E-Mail: **************@*****.***
SUMMARY OF QUALIFICATIONS
Green Belt Project 12 hr process to 4hr (saved 600 hrs per week)
World Class Process Improvement Program
Set Up Reduction
Plant Layout Design
Bachelor’s Degree in Industrial Engineering Texas A&M
20 years Manufacturing Engineering Experience
Advanced IE Toshiba Training
Problem Solving, Mechanical Aptitude
Shift Manager and Foreman Experience
Plastics Extrusion & Injection Experience
I analyze processes and make them better
Punctual, hard working, people person
Work well individually as well as part of a team
EMPLOYMENT HISTORY
2012- 2016 Toshiba International Corporation Houston, Texas
Manufacturing Engineer
Duties: Responsible for Lufkin, Schlumberger, JK & cable sub-assembly area operations and improvements.
Reduced Lufkin assembly processes from 12 hrs batch to 4 hrs one piece flow. Made line profitable
Designed equipment, process layout
Work with vendors to outsource sub-part manufacturing
Toshiba Green Belt Training and Project
2010-2012 ABCO SubSea Houston, Texas
Manufacturing Engineer
•Duties: Responsible for creation and maintenance of Job List and BOM.
•Work with vendors and engineering to resolve production and assemble issues
•Trouble shooting problems in charge of Employee suggestion program
1997 2010 SMEAD MANUFACTURING McGregor, Texas
Manufacturing Engineer
Duties: Responsible for implementing process improvements for a large manufacturing company.
• Reduced Set Up times thru process analysis by elimating non value task and 5S improvements
•Implemented CLAIR program to reduce machine down time and increase reliability
•Used AutoCAD to improve production floor and warehouse layouts
•Managed Employee Process Improvements, On Safety Plant Committee
•Worked with 4 facilities to Standardize Production Procedures and Processes
• Trained operators, worked with Engineers to redesign and implement machine improvements
1993 1995 CUSTOM BUILDING PRODUCTS Bell, California
Night Production Manager
Duties: Responsibilities included quality control for three production operations.
• Combined powder and liquid compounds such as cement for shipping throughout the day
• Lead T.Q.M program as group leader and computerized production monitoring and produced
Safety videos.
1993 1993 CAL-MOLD City of Industry, California
Inject Mold Technician
Duties: Responsible for O.E.M injection molded plastic parts for a large manufacturing plant.
• Performed mold change over, inspection of parts, machine adjustments and problem solving.
1992 1992 LOUVER DRAPE Santa Monica, California
Shift Manager
Duties: Responsibilities included supervising extrusion and injection molding machines
• Designed machine and process improvements and implemented cross training to increase
Production
• Worked in auto assembly area and maintained highest productivity in the company
• Solved procedure problems, conducted employee evaluations, safety meetings and determined
Quality control issues.
1990 1991 KALDAIR, INC. Houston, Texas
Project Engineer
Duties: Responsible for coordination of the bidding process with fabricators.
• Upon awarding of bid, worked with customers to approve design and inspected flairs from start
to final inspection
• Performed shipment to customer and compiled data and operating manuals.
Thomas Hendrickson
Resume, Page 2
EDUCATION
TEXAS A&M UNIVERSITY College Station, Texas
Bachelor of Science Degree, Industrial Engineering
SKILLS
• Computer Software (AutoCAD Lt, File Maker, Adept Excel, Word,)
• Office Equipment (Computer, Copier, Fax Machine)
• Industrial Equipment (Welding Equipment)
CERTIFICATES AND TRAINING
• Toshiba Green Belt
Value Stream Mapping, LEI Training
• Standardization Balanced Work Flow, LEI Training
• Metallurgy Training
• Welding Training
• Machine Shop Training
• CPR Training
References furnished upon request