Resume of RAJESH KUMAR SHRIVASTAVA
Proposed Position
Senior Civil Engineer
Personal Data
Name
Date of birth
Nationality
Civil Status
Rajesh Kumar Shrivastava
India
Civil Engineer
Address & contact nos
1130/4D, SAI PARISAR, LIG ROAD
JAI PRAKASH NAGAR
ADHARTAL, JABALPUR M.P.
PIN-482004, INDIA
Phone No - 009****-*******,
MOBILE NO. – 098********,
E-mail ID – aczxyb@r.postjobfree.com
COMPUTER KNOWLEDGE:-Operating System
Application Package
Window 95, 98, 2000,2007,2010
M.S. Office, PowerPoint M.S. Project-10 and Prima Vera-7. Internet.
Education
1.B.E.(Civil Engineering),Dec 1981,Govt Engineering College, Jabalpur university, M.P.INDIA 2. P.G Dip in Construction Mgmt 1987,NICMAR Mumbai, INDIA. 3.MBA (Finance) 2001,Annmalai University INDIA
Geographical Experience
INDIA,UAE QATAR,
key qualifications
Mr Rajesh Kumar Shrivastava has more than 30 years of experience out of which More Than 24 years as Jr/Sec /Sr.Sec Engineer in Rly’s, in tendering (Estimation/Qty surveying)Planning execution,Monitoring . New Construction, planning scheduler on a Railway propject and Maintenance of Infrastructure work concerned with Railways. Water supply scheme works,Sump well,RCCHS and U/G tanks, Filtration plant Residential,Commercial, Industrial shed, Railway stadium, Water supply project,Laying of Drinking water DI/GI/CI pipes.WTP & ETP, Drainage work fencing work b/wall, Construction of quarters and Colony Roads, U/G& surface drains Commercial building (G+6)., R.C.C. Road &, asphalting work, Bridge work, surveying work, Earth dam, dewatering, 3 years at Olympic stadium, QNNTC building (G+6).villas refurbishment work, at Doha Sherton repair at de-salination plant. At Ras Abu Fantas,,villas, commercial and residential industrial building pipe laying work,Extension of Bridge, ROB, Doubling of tracks,Doubling of Bridge at Narmada River near Hoshangabad, various rly’s work at Mumbai VT and nearly 2 year in HCC Ltd as Engineer (Civil) at Hydroelectric project at Jammu and 1 year in V.M.Jog Constructions Pvt Ltd Pune as Junior Engineer (Civil) at 1000 mm dia MS pipe laying work at shahad-Temghar near Kalyan.(M.S). joined Beaver Infra Consultants Mumbai dealing with PMC in tunnelling U/G Storage, Shelter and passage for oil and defence requirement Building etc now joined a water supply scheme in a SQC firm where L& T is Contractor for growth and challenging task. So far Intake well /WTP of cap 20 MLD is in progress 60% completed 42 ESR of cap 1lac to 3.5 lac is in progress Pipe laying from 100 to 600 mm dia laid upto 150 KM.HDPE from 90 to 200 mm dia laid upto 50 KM smart city-smart Road NMT OAT Intimate Theatres, OAT Swimming pool, Stadium, redevelopment of Heritage Building, Development of Dumna Nature Park,IT park at Bargi
career highlights
experience summary
October 2016
To……contd
Company/Organisation
Royal Hoshkening DHV Consulting Pvt Ltd Noida
Position Held -Project Management Expert
Project Name-Smart City Jabalpur Rs 4000Crore
Project Description-Construction of smart Road NMT OAT, Intimate theatre, Dumna Nature Park, Water 24x7Development of stadium anf construction of New Stadium
Client: Jabalpur Municipal Corporation…
Main Project Features: Smart city comprises of Smart Road NMT, Stadium Nature park up keeping of heritage Building, Open Air Theatre, Construction of WTP STP laying of DI Pipes different dia for 24x7 Water supply, smart pole. Construction of STP Laying of storm water pipes STOP WTP ETP plant in Area Based Development of Jabalpur City including Some similar work in pan city
Activities Performed: Planning and scheduling activities, monitoring, Project, co-ordination with designers, clients, quality control department and contractors of contractors. Feasibly survey making of DPR, RFP and fixing lowest bidders planning scheduling monitoring taking measurement recording and paying to contractor through client i.e. Jabalpur Municipal. planning with MSP and MIS etc. Timeline,resource levelling, Report Etc.
Date from - Date to
29-03-2014 to Contd… company/Organization
Theme Engineering Services Pvt Ltd Jaipur
Position-Resident Engineer
Project Name- Multy village Rural water supply Scheme Udaipura Dist Raisen -Rs. 1500 Million
Project Description- Supervision quality control in connection with Laying of different dia DI pipes along with different auxiliary units like Intake Well(by Sinking Method), WTP 21 MLD,ESR of 90KL to 225KL,(42 Nos) Pumping main DI pipe of 600mm 450mm and 350 mm Dia 200 mm and 150 1nd 100 mm Distributions HDPE pipes from 90 to 160 mm dia,House Connection to 105 villages. No of connection Approx 20000 Nos
. Responsibilities/Tasks- Planning and scheduling activities, monitoring,Project, co-ordination with designers,clients,quality control department and contractors of M/S L&T. Checking drawing submitted by M/S L&T forwarding to MP Jal Nigam for approval, Quality control, surveying contract management,Recording measurement and forwarding to MP Jal Nigam for payment to contractor after carrying out the Hydrostatic Pressure trusting in strip from Consultants’ side before paying for laying. Helping contractor M/S L& T for getting NOC from MPRDA,MPRDC forest Deptt for laying the pipes by the side of roads. Selection based on feasibility and end requirement of site of different components of water supply scheme. Taking important decision pertaining to site with the interaction with client ie MP Jal Nigam. Left as Civil Work was almost over.
Date from - Date to
18-09-2013 to 26-03-2014 company/Organization
Beaver Infra Consultants
Mumbai
Position-Dy General Manger
Joined Beaver Consultancy –At present involved with consultancy for construction of U/G structure,Shelters and passage for oil for Defense requirement keeping the Arms and Ammunitions safe being a very sensitive issue from security point of view . Expertise in tunneling consultancy. At present looking to expand the consultancy business ie PMC in other field of Civil Engineering like Building,Road,Water Supply, RCC Rank U/G Tank and different type of tunnels EPC etc .
Date from - Date to
June 1993 …31-08-2013 Company/Organization
RAILWAYS
Position-SENIOR SECTION ENGINEER
1.Project Name- -Improvement to Railway colonies and s/Bldgs like roof leakage, roads water supply, drains,fencing, door and windows,, pipeline & Construction of New Multistoried quarters Construction of Quarters, bridges, track maintenance water supply tank,reservoir, pond drilling of well,WTP ETP etc - Project Value-Rs. 150 Million. Responsibilities/Tasks- As below
2.Project Name- KTE/KMZ/NKJ-Repair to Railway colonies & Replacement of Mother tank of cap 5.0 lacs Liter& Laying of 250 mm dia DI drinking water pipeline,Construction of Quarters Colony & maintenance Road, track maintenance, FP,ETP Sewerage, water supply, Drain, Roof leakage,. - Project Value-Rs. 50 Million. Responsibilities/Tasks- As below
3. Project Name- laying of DI pipes of 250mm Dia from Bhamrar river katni to Existing Filtration Plant(4.5 KM) & HS tank of cap 10 Lack Liters (2 N0s) at KTE &NKJ Katni .
- Project Value-Rs. 150 Million Responsibilities/Tasks- As below
4. Project Name- Project Name- Construction of Filtration plant of 24 lack gallon/day at Jabalpur. M.P laying of DI pipes of 250mm Dia from Bhamrar river katni to Existing Filtration Plant(2.5 KM) &HS tank of cap 10 Lack Liters at NKJ Katni .
India-Project Value- Rs.60 million. Responsibilities/Tasks- As below
5. Project Name- Construction of 500 mm dia DI Main (8KM) from Gwarighat pump house to Rampur Ground tank. along with accessories .-Project Value-Rs. 18 Million
Responsibilities/Tasks- As below
6. Project Name- Construction of 500 mm dia DI Main(12 KM length) from Rampur Booster pump house to Filtration plant along with accessories -Project Value- Rs. 40 Million
Responsibilities/Tasks- As below
7. Project Name- Construction of Filtration plant of 36 lack gallon/day Near main Station.–Project Value-Rs.70 Million. Responsibilities/Tasks- As below
8.Project Name- Construction of 4 Nos RCC H.S tank of capacity 2.75 lack liter & 4 Nos U/G RCC tank of capacity 2.25 lack liter, reservoir at upperline, Bajrang colony and KTE -Project Value-Rs.25 Million Responsibilities/Tasks- As below
9.Project Name- Provision of filtration plant and R.C.C.HS tank of capacity 2.75 Lack liter & Misc works at KTE - Project Value-Rs 20. Million. Responsibilities/Tasks- As below
Planning and scheduling activities, monitoring,material procurement, co-ordination with designers,consultants, and sub contractors. Estimation,Rate analysis, Quality control, surveying contract management,preparing and checking bill to be sent to account subsequent ensuring payment, dealing with variation and claims with clients, if any negotiation etc. required, Submitting progress of work every month to HQ
Date from - Date to
Nov 92 to May 93 Company-
M/S G.C.C P.O. Box 3338, Abudhabi U.A.E.
Location-Abudhabi
Position-Engineer(Civil)
Project Name- Laying of Drinking water DI pipes of different dia in officer city and alshamama Abudhabi U.A.E.-Project Value -Rs. 4 Million DHS.
Project Description- Supervision in connection with Laying of different dia DI pipes along with different auxiliary units like Air Release and pressure, sluice valve etc.,inlet chambers house connection and testing, laid cross country pipe lines for drinking purpose. Responsibilities/Tasks- Planning and scheduling activities, monitoring,material procurement, co-ordination with designers,clients,quality control department and sub contractors. Estimation Quality control, surveying contract management,presenting bill to clients subsequent chasing for payment, dealing with variation and claims with clients, if any negotiation etc. required, submitting completion drawing and handing over the completed assets to clients duly conducting the testing from contractor's side. Maintenance of completed infrastructure as per terms and condition of contracts in regards to workmanship and quality.
Date from - Date to
May 90 to Aug 92 Company-
M/S A.K.C.
contracting Doha QATAR .
Location-DOHA
Position-Engineer(Civil)
Project Name- Construction of Corporate office for QNNTC Doha and Khaleefa Olympic Stadium at Doha.Project Value Rs. 65 Million Q.R.
Project Description- Supervision in connection with construction of commercial complex, villas,refurbishment at Doha Sheraton,Repair at de-Salivation plant at Ras Abu Fantas. Villas, construction of Olympic stadium landscaping work .Refurbishment work at VIP Lounge.
Responsibilities/Tasks- Planning and scheduling activities, monitoring,material procurement, co-ordination with designers,clients,quality control department and sub contractors. Estimation Quality control, surveying contract management,presenting bill to clients subsequent chasing for payment, dealing with variation and claims with clients, if any negotiation etc. required, submitting completion drawing and handing over the completed assets to clients duly conducting the testing from contractor's side
Date from - Date to
Dec 88 to Dec 1989 Company-
Railways Itarsi & Hoshangabad under DyCE(C ) Bhusawal
Position-Junior Engineer-I(works)Construction
Project Name- Construction of ROB, Doubling at Jujharpur yard At Itarsi and Doubling of Narmada bridge at Hoshangabad New rail project between khidkiya to talwadia Near Kandawa MP. Project Value-Rs. 125 Million. Project
Description-Construction. ROB, Doubling at Jujharpur yard At itarsi and Doubling of Narmada bridge at Hoshangabad along with track embankment work connecting Hoshangabad and budni ie approach track in connection with doubling of bridge Responsibilities/Tasks- Planning and scheduling activities, monitoring,, co-ordination with consultants,clients,quality control with the help of departmental workers and sub contractors. Estimation Quality control, surveying contract management material procurement interaction with clients /architects/Consultants etc.
Date from - Date to
Dec 86 to Dec 88 Company-
Central Railways Mumbai XEN(C)Dadar
Position-Junior Engineer-I-((works) Construction
Project Name- Extension of New Administrative Building Central Railway towards caffard market,Construction of PF No 7 along with line & Construction of Double discharge system for suburban central Railway at Bombay VT. Project Value-Rs. 90 Million. Project
Description-Construction of corporate office of construction wing of central Railway towards caffard market. Construction of line No 7 Double discharge of Suburban railway, Asphalt/RCC road work for platform surfacing, construction of washing Apron, construction of computerized building with all advance finishing work Bombay VT.
Responsibilities/Tasks- Planning and scheduling activities, monitoring, co-ordination with consultants,contractor,Estimation,surveying, quality control with the help of departmental workers and sub contractors Recording of Measurement,Variations completion report . Estimation Quality control, surveying. contract management material procurement interaction with contractor/Higher-ups.
Date from - Date to
June 84 to Dec 86 Company-
MTP Railways Mumbai Position-Junior Engineer-I-(Works) Construction
Project Name- Construction Station Building at Mankhurd backfilling construction of culvert –Mankhurd-Belapur Rail line Project 50 KM Length .. Project Value-Rs. 500 Million. Project
Description-Construction of station building backfilling, Surveying Earthwork for embankment of Mankhurd Belapur line construction of rail Bridge between Mankhurd and Vashi over thane creek
Responsibilities/Tasks- Planning and scheduling activities, monitoring, co-ordination with consultants,contractor,Estimation,surveying, quality control with the help of departmental workers and sub contractors Recording of Measurement,Variations completion report . Estimation Quality control, surveying. contract management material procurement interaction with contractor/Higher-ups etc
Date from - Date to
Dec82 to Feb 84 Company-
M/S H.C.C.Ltd Walchand Road Mumbaii
Position-Engineer(Civil)
Project Name- Construction Hydroelectric project of capacity 500 M.W at Salal J&K INDIA-Project Value Rs. 500 Million.
Project Description-Construction of Gravity dam coordinating all the disciplines engineer resulting in maximum concreting. Deciding method of concreting using M-3 effectively. Reporting to Engineer In Charge Responsibilities/Tasks- Planning and scheduling activities, monitoring,taking Approval of client's Representative for pouring of concrete in blocks,quality control with the help of departmental workers and sub contractors. Estimation Quality control, surveying contract management material procurement interaction with clients architects/Consultants.,.
Date from - Date to
Jan 82 to Dec 82 Company-
M/S V.M Jog Construction Pvt Ltd Pune
Position-Jr. Engineer(Civil)
Project Name- Laying of 100 Cm dia MS Pipe line from shahad to Temghar near kalyan for MWSSP(M.S) -Project Value Rs. 40 Million.
Project Description-Laying of 100 cm dia ms drinking water pipe from shahad to temghar near kalyan.. thrust blocks, providing air valve and other accessories as per approved drawing, welding inside and outside,
Responsibilities/Tasks- layout and leveling as per prefixed gradient, construction of pedestal or chairs for laying pipe with the help of crane, material procurement interaction with sub contractor, client consultant and director of company .Making bar chart monitoring progress
Language Known –
Marital Status-
Passport No. -
Salary
Hindi, English
Married (one son 18 years old)
F-3129348
Negotiable
(RAJESH KUMAR SHRIVASTAVA)