SUMMARY
Detail oriented and a skilled communicator, able to present complex information in a clear and concise manner. Proficiently manage time to solve complex problems. Keen and fast learner, actively involved with university event management. Motivated team leader and supportive team player with a strong work ethic.
Knowledgeable in Pipeline Integrity Management programs:
ASME B31.8S, API 1160 and ISO 1061
Skilled in design and analysis tools:
SolidWorks, MATLAB, Excel, HVAC systems, G-Codes and Manufacturing
Experienced in management tools:
Construction and Project Management, MS Project, Multi-criteria Decision making and optimization and Gantt Chart
PROFESSIONAL EXPERIENCE
BestBuy Canada Jul, 2015 – Dec, 2016
Sales Associate
Adapted professional speaking and client handling skills
Addressed clients’ problems by providing technical recommendations
Improved service sales in the department by 15%
Established professional relationships and future business with clients
Agri-Forest Bio-technologies Jan, 2015 – Dec, 2015
Data analyst
Recorded and analyzed data
Designed an effective system to organize inventory on Microsoft excel
Optimized the system to schedule production
Minimized losses caused by overproduction and improper inventory management
TECHNICAL PROJECTS
Capstone project Sept, 2016 – Apr, 2017
Applied theoretical, design and manufacturing concepts to remodel a Mechanical operator presence control joystick for Scorpion Technologies LTD.
Performed stress and fatigue analysis to evaluate life-cycle using SolidWorks
Optimized preliminary design for user safety and comfort
Delivered final design with a life of 1 million cycles to Scorpion Technologies LTD.
Frameworks for Integrity Management Program Standards Jan, 2017 – Apr, 2017
Inspected 3 integrity management programs
Revised applications of ASME B31.8S, ISO 1061 and API 1160
Conducted research on complex pipeline inspection techniques
HVAC system Sept, 2016 – Dec, 2016
Led a team in designing and optimization of a HVAC system for a building
Assigned tasks and deadlines
Calculated total heating and cooling loads under different weather conditions
Identified appropriate air handling units and cost for system
Turbine Power Generator Jan, 2016 – Apr, 2016
Designed generator components on SolidWorks
Drafted a preliminary design simulation on SolidWorks
Learned to write basic G-codes to operate CNC lathe
Manufactured final design components by applying machining knowledge
Four-bar linkage Analysis Jan, 2015 – Apr, 2015
Applied theoretical knowledge to model a dynamic lift mechanism for trucks
Optimized it for heavier load and to meet commercial grade safety
Performed kinematic and dynamic analysis for a four-bar linkages on SolidWorks
Simulated a test runs under different load conditions
Single Stage Gearbox Design Jan, 2015 – Apr, 2015
Designed and assembled gearbox components on SolidWorks
Performed stress analysis on each component
Examined materials and provided a final design with 20,000 hours of life for gear system
COMMUNITY INVOLVMENT
South Asian Alliance
Vice-President
Led planning of events to showcase the diversity of South Asian cultures
Presented ideas to acquire sponsorships from local businesses
Built relationships for future events
Budgeted finances for all events
Interviewed students interested in volunteering
Trained inexperienced individuals to network and take initiatives
2015 – Present
Sports and fitness volunteer for the City of Kelowna
Mentored students through organizing events
Connected with individuals to ensure safety
2010 – 2013