PERSONAL INFORMATION
Full Name : Fachrul Syamsul Alam
Place/Date of Birth : Makassar, 1 February 1984
Nationality : Indonesia
Passport ID : B 4270087 valid until July 18th, 2021
Email : ******************@*****.***
Mobile Phone : +628**********
Address : Cluster Melati Residence Blok D No 21 - Batam
Kepulauan Riau
Education : Bachelor Engineering in Naval Architecture and Ship Building
Department at Sepuluh Nopember Institute of Technology (ITS)
Current Location : Batam - Indonesia
TRAINING/COURSE/CERTIFICATION NAME
CERTIFICATE NO.
VALID UNTIL
FROSIO International Coating NS 476 Level 3
7052
23.10.2017
Institute of Corrosion (ICORR) - Insulation Inspector Level 2
C6572
17.07.2021
Institute of Corrosion (ICORR) - Fireproofing Inspector Level 2
C6573
17.07.2021
Welding Inspector Level 1
100/IWES/VII/2012
25.7.2017
BOSIET + TSbB (Opito Approved)
131157072710161217
26.10.2020
Jotun Coating Advisor Academy by Jotun Norway
Jotun Coating Advisor Academy by Jotun Singapore
-Coating Inspector - Jack-Up Rig Inspector - Dry Docking (Ship Repair)
-Insulation Inspector - Painting Engineer - Marine New Building
-Fire Proofing Inspector - Module Fabrication - Pressure Vessel
-QA/QC Painting Inspector - Topside / Platform - 3LPP/ 3LPE `
-E- House Fabrication - Fusion Bonded Epoxy - Field Joint Coating
Very experienced painting, coating inspector for more 9 years experience corrosion protection design paint system and handle variation projects atmospheric corrosive category, corrosive category environment ( Fabrication, offshore, onshore, Energy, Light Industry, Heavy Industry, Petrochemical, Drilling, Oil/Gas, FPSO, floor coating, pressure vessel, Field Joint coating (pipe line), tank coating, storage tanks, insulation, PFP), PFP ( Passive Fire Protection ) organic coating and Inorganic coating, Insulation (Insulation types : Acoustic insulation, Head conservation, Personal protection, Anti condensation, Cold conservation) - Design paint system (Hot and cold insulation), Coating survey, New building marine and FPSO and familiar with water ballast tank resolution MSC 215 (82), Special Coating (Powder coating, clock spring, wax, rubber lining). Good knowledge of international standards for offshore such as ISO, ASTM, NACE, SSPC & NORSOK
Job Objective: Looking forward to get a challenge position in an international company (in the field of oil / gas, construction) where I can show my abilities and skills
EXPERIENCES at PT Caterpillar Indonesia Feb 2017 to Present
as Painting Process Engineer
NO
TIME of APPLICATION
PROJECT NAME
OWNER
LOCATION
1
Feb 2017 to Present
HMS 6015B (Hydraulic Mining Shovel)
PT Buma - Borneo
Caterpillar Batam
2
LMT (Large Mining Truck) 777,793 & 797
Caterpillar Dortmund
Caterpillar Batam
PRIMARY DUTIES AND RESPONSIBILITIES:
Identifies available fabrication processes, tools and methods. Evaluates their effects on past successes and failures and the cost of their application. Identifies gaps in available processes and tools, and develops alternatives.
Perform technical data analysis of manufacturing processes to support management decisions;
Design / direct the acquisition, design, fabrication and installation
Troubleshoot day-to-day process issues, develops solutions, and monitors improvements;
Monitor all exchange and in-house requirements;
Procure material related to manufacturing improvements through external suppliers;
Perform quality checks on Blasting and painting application;
Analyze and deploys engineering change notices;
Responsible for provision of Standard Work Sheet, PFMEA, Control Plan, In Process Validation, etc to be used for Production;
Respond to customer issues and lead process improvements; and
To ensure quality improvement by working in systematic manner, formalized procedure design to incorporate contract requirement and design change.
Ensure that all deliveries are inspected on arrival and that the quantities and quality are as specified before the invoice or delivery note is approved. Ensure that Over Shortages & Damage (OS&D) reports are rendered as necessary.
Provide day-to-day coaching duties for Juniorc Painting Engineers.
EXPERIENCES at PT Wasco Engineering Indonesia Jan 2017 to Feb 2017
as QC Painting and Insulation Inspector
NO
TIME of APPLICATION
PROJECT NAME
OWNER
LOCATION
1
Jan 2017 to Fe 2017
Future Growth Project/
Wellhead Pressure Management Project
Kazakh Projects
Joint Venture Limited (KPJV LTD)
Wasco - Batam
PRIMARY DUTIES AND RESPONSIBILITIES:
Carry out systematic inspection at each stage of surface preparation, painting/wrapping and repair works.
Verify the complete implementation of the approved Quality Inspection and Test Plan (ITP) at different stages of painting process.
Verify the implementation of the proposed inspection system for all preparatory, painting and wrapping work via a series of Hold Points in the work schedule, from which the Contractor shall not proceed until he is given formal clearance by the QP Engineer.
Identify all defective or non-conforming work at each stage shall be rectified to the required QP standard.
Witness all contractors’ painters and blasters qualifications carried out by paint manufacturer, and evaluate their associated testing results.
Report daily to QA/QC Coordinator/ Engineer and advise him on the QP’s main contractor compliance to contract procedures and standards and any matters effecting quality
Prepare documents for all items subject for Insulation works from surface preparation up to cladding.
Inspect all works and ensure conformity to standards and specifications which include surface preparation, Insulation lagging and cladding.
Preparing and submitting final hand over documents
EXPERIENCES at PT Lestari Citra Inspektindo July 2016 to Dec 2016
as Freelance Coating and Insulation Inspector
NO
TIME of APPLICATION
PROJECT NAME
OWNER
LOCATION
1
July 2016 to Oct 2016
Horison Oil Sand Project
Technicas Reunidas
Cilegon
PRIMARY DUTIES AND RESPONSIBILITIES:
Review the Contractor’s Procedures, Contracts and Estimation Documents for the Painting/Coating requirements.
Oversee construction activities associated with Insulation, Coating, Painting to ensure compliance with standards (ASTM, SSCP, NACE), engineering drawings, specifications, environmental guidelines, quality assurance programs and construction safety program
Coating Inspection for the Vessels, Columns, Tanks, Strainers and determine the coating condition and damages during operation and provide recommendation to the Contractors through Site Inspection Report (SIR)
Inspection of Surface Preparation and Coating Application including all the specified testes and all points related to the Project Quality Plan and Procedures.
Responsible for Preparation of Insulation procedure of hot & cold Insulation materials and accessories for the project
Review and sign on Inspection reports submitted by Contractors after completion of specified task
Responsible for Preparation of Insulation procedure of hot & cold Insulation materials and accessories for the project
Executing the insulation works for piping and equipment (hot, cold and acoustic insulations) as per the project specification and method of statement.
To ensure quality improvement by working in systematic manner, formalized procedure design to incorporate contract requirement and design change.
Carry out surveillance on activity during execution of project and to ensure implementation of quality assurance system in order to meet QA/QC requirement of the project. Assure that all inspection and test outline in inspection plan are carried out.
Coordinating with Site in-charge & Client's for progress and inspection.
Prepare documents for all items subject for Insulation works from surface preparation up to cladding.
Inspect all works and ensure conformity to standards and specifications which include surface preparation, Insulation lagging and cladding.
Preparation of the punch lists and checked & closed how much completed on daily basics.
Identifying the released items for all areas.
Requesting and carrying out each stage wise inspection with Inspectors
Maintain quality records through documentation and prepare inspection and test plan
Preparing and submitting final hand over documents
EXPERIENCES at PT Tripatra Engineers and Constructors July 2015 until June 2016
as Senior Coating / Insulation & FireProofing Inspector
NO
TIME of APPLICATION
PROJECT NAME
OWNER
LOCATION
1
July 2015 to June 2016
ENI Jangkrik Complex Development Project
ENI Muara Bakau B.V
PT Daekyung Indah Heavy Industri – Cilegon Indonesia
2.
August 2015 to Dec 2015
Senoro Gas Development Project
Joint Operation Body (JOB) Pertamina-Medco E&P Tomori
PT Daekyung Indah Heavy Industri – Cilegon Indonesia
PRIMARY DUTIES AND RESPONSIBILITIES:
Act as Company site representative for Coating activities and undertake regular coating / corrosion condition surveys and paint inspections.
Support the QA / QC Construction Superintendent on site ensuring that the Construction Contractor is fully conversant with all Company project Coatings Inspection related standards and procedures.
Verify that Construction Contractor staff is in receipt of copies of the Chemical and Physical Test Certificates for materials which require such documentation by Code requirements.
Verify in conjunction with the QA / QC Construction Superintendent, that where required by design and fabrication Codes that Coatings procedures have been qualified and approved, and that NDE & Coatings operatives have valid applicators certification and that adequate Coatings records are being maintained. Review and approve sub-contractors daily inspection reports.
Monitor and ensure that a comprehensive record of documentation and certification of NDE & Coatings Inspection work is maintained, and assist in the satisfactory ‘handover’ of completed package from Construction Contractor to Company.
Ensure the Construction Contractor provision of Coatings material receipts, handling, inventory control and distribution at site and maintain an auditable record of all material related transactions.
Ensure that all deliveries are inspected on arrival and that the quantities and quality are as specified before the invoice or delivery note is approved. Ensure that Over Shortages & Damage (OS&D) reports are rendered as necessary.
Ensure that Construction Contractor receipt of all Coatings material and equipment is stored safely and is protected, where necessary, from climatic conditions. In particular, ensure that any specific storage instructions are implemented. Liaise with the QA / QC Construction Superintendent to determine the best storage position for difficult or bulky items.
Supervise the following Site Coatings Inspection interfaces and ensure that Company / Project standards and procedures are fully aligned.
Support the QA / QC Construction Superintendent and other Discipline Superintendents on all aspects of Coatings Inspection activities and ensure that interfaces with other disciplines are managed effectively.
Ensure all agreed Contractor and Fabrication Contractor Insulation ITPs and procedures are implemented within the yard.
Inspection of all Insulation related aspects and, where applicable, sign-off on behalf of the Company.
Provide regular reports on Insulation discipline quality status/issues to the QA/QC Lead – Module Yard.
Monitor Fabrication Contractors insulation materials receipt, storage and handling processes.
Perform Company QC in fabrication yard testing (including applicator qualifications, records traceability).
Review, monitor and closeout of Contractor and Fabrication Contractors Insulation NCR’s/ quality observations within the fabrication yard.
Review Contractor and Fabrication Contractor Insulation records management and preparation for handover.
Ensuring that client products were made to specifications with no damages prior to shipping.
EXPERIENCES at PT Jotun Indonesia Dec 2010 until July 2015
as Senior Coating Advisor
NO
TIME of APPLICATION
PROJECT NAME
OWNER
LOCATION
1
January 2015 to June 2015
Module MV 27,Module Kraken
MODEC, Wartsila
Wasco Engineering
2
January 2014 To January 2015
Jack Up Rig
MSC215 (82)
PSPC standard
GrupoR, Parden Holding, Pemex, Standard Drilling, Noble denton, Transcean, Petrobras, Keppel Fels
Bintan Offshore
3
June 2013 to January 2014
Condensate storage tanks & Fire water tanks
ConocoPhillips
Onshore Conocophillips
4
Januari 2013 to February 2013
Buckle Initiator
Woodside
Technip
5
February 2013 to March 2013
E – House AP LNG
ConocoPhillips
SMOE
6
January 2013 to February 2013
Platform Iraq Oil Export Expansion
Saipem Indonesia
Saipem
7
November 2012 to December 2012
Swift Drilling JB 118
BY. Jack Up Barge
DSAW
8
June 2012 to August 2012
Udang East Flow line Bundle & Riser
PT. PAN
G Top Marine
9
April 2012 to July 2012
Chemical Injection Package
Istana Karang Laut
TOJ Offshore
10
Dec 2011 to Feb 2012
Platform South Mahakam Field Development Phase 1 & 2
Total E & P Indonesie
Nippon Steel
11
January 2012 to March 2012
Liquid Oxygen tanks & Liquid Nitrogen Tanks
Duta Surya Sukses
DSS
12
Nov 2011 to March 2012
Platform South Mahakam Field Development Phase 1 & 2
Total E & P Indonesie
Nippon Steel
13
February 2012 to April 2012
Piping & Structure inlet
Weatherford
TOJ Offshore
14
November 2011 to December 2011
Arthit Bongkot Field Development Phase - Vessel
Transalindo Eka Persada
Transalindo Eka Persada
15
June 2011 to October 2011
E-House Cidade De Paraty
SBM Offshore
Wasco Engineering
16
Dec 2010 to January 2011
Gorgon Barrow Island LNG Plant
Chevron
Citra Tubindo Engineering
17
January 2011 to June 2011
Fish Frezeer Trawler PSPC (New Ship Building)
RObinzon LLC Rusia
DryDock World Nanindah Shipyard
PRIMARY DUTIES AND RESPONSIBILITIES:
Coordinated timely delivery of paint products required for project completion.
Created close-out reports with various projects.
Provided solutions for customer problems without sacrificing the standards for quality and while maintaining the production schedule.
Calculated paint consumptions based on area, dry film thickness and specific coating.
Responsible Follow up action item finding inspection by Yard, and Owner, Review Contractor (Business Partner) document such us Tool & Equipment certificate, Quality manual /procedure Pre Inspection (Design and Fabrication, Pre cleaning, Equipment and Materials abrasive,
Inspect Surface Preparation (Cleanliness, Roughness),
Inspect Paint Application (Mixing thinning, Induction time, pot life, self life, etc),
Final Inspection (DFT, Paint Defect and Recoating Interval), Blasting and painting.
monitoring progress activities, calibration equipment, daily report blasting and painting activity, prepare punch list
EXPERIENCES at PT ASL Marine Shipyard April 2008 until Dec 2010
as Painting Engineer
NO
TIME of APPLICATION
PROJECT NAME
OWNER
LOCATION
1
January 2010 to December 2010
Backhoe Dredger Pontoon Hull 955
Royal Boskalis Westminster
PT ASL Shipyard
2
January 2010 To December 2010
60M AHT/ Supply Vessel Series Hull 863~868
RK Offshore
PT ASL Shipyard
3
March 2009 to April 2010
60M AHT/ Supply Vessel Series Hull 871/874/875
Tidewater Marine International LLC
PT ASL Shipyard
4
April 2009 to April 2010
LTS 3000” Heavy Lift Crane/Pipelay Vessel
L&T Sapura Cres J.V
PT ASL Shipyard
5
September 2008 to September 2009
88M Offshore Support &Maintenance Vessel PAC Bangka
Pacc Offshore PTE.LTD
PT ASL Shipyard
6
March 2006 to December 2008
Bully Thruster Canister
Frontier Drilling USA INC
PT ASL Shipyard
PRIMARY DUTIES AND RESPONSIBILITIES:
Scheduling the activities for Painting works in Pre-erection, Erection and Quay stage.
Working on administrative jobs as daily/monthly evidence, meeting material, reports, internal notes, etc
Working on internal operating program for work orders, man hour, progress and efficiency of the works carried-out by society’s employees and subcontractors.
Daily patrol for checking status of painting jobs.
Attend on daily meeting with DMHI and subcontractors foremen’s.
Assure all information from painting specification ( paint, DFT, curing time, recoating interval, immersion time )
Issuing all necessary documents for subcontracted jobs.
Calculating and managing the paint consumption.
1. Dadang Kurniawan,Technical Manager PT PPG Coating Indonesia, *********@***.***, +628**********
2. Dedy tan, Branch Manager PT Jotun Indonesia, ****.***@*****.***,+628*********