Post Job Free

Resume

Sign in

Painting inspector, painting supervisor

Location:
Batam, Riau Islands, Indonesia
Posted:
April 23, 2017

Contact this candidate

Resume:

PERSONAL INFORMATION

Full Name : Fachrul Syamsul Alam

Place/Date of Birth : Makassar, 1 February 1984

Nationality : Indonesia

Passport ID : B 4270087 valid until July 18th, 2021

Email : aczx42@r.postjobfree.com

Mobile Phone : +628**********

Address : Cluster Melati Residence Blok D No 21 - Batam

Kepulauan Riau

Education : Bachelor Engineering in Naval Architecture and Ship Building

Department at Sepuluh Nopember Institute of Technology (ITS)

Current Location : Batam - Indonesia

TRAINING/COURSE/CERTIFICATION NAME

CERTIFICATE NO.

VALID UNTIL

FROSIO International Coating NS 476 Level 3

7052

23.10.2017

Institute of Corrosion (ICORR) - Insulation Inspector Level 2

C6572

17.07.2021

Institute of Corrosion (ICORR) - Fireproofing Inspector Level 2

C6573

17.07.2021

Welding Inspector Level 1

100/IWES/VII/2012

25.7.2017

BOSIET + TSbB (Opito Approved)

131157072710161217

26.10.2020

Jotun Coating Advisor Academy by Jotun Norway

Jotun Coating Advisor Academy by Jotun Singapore

-Coating Inspector - Jack-Up Rig Inspector - Dry Docking (Ship Repair)

-Insulation Inspector - Painting Engineer - Marine New Building

-Fire Proofing Inspector - Module Fabrication - Pressure Vessel

-QA/QC Painting Inspector - Topside / Platform - 3LPP/ 3LPE `

-E- House Fabrication - Fusion Bonded Epoxy - Field Joint Coating

Very experienced painting, coating inspector for more 9 years experience corrosion protection design paint system and handle variation projects atmospheric corrosive category, corrosive category environment ( Fabrication, offshore, onshore, Energy, Light Industry, Heavy Industry, Petrochemical, Drilling, Oil/Gas, FPSO, floor coating, pressure vessel, Field Joint coating (pipe line), tank coating, storage tanks, insulation, PFP), PFP ( Passive Fire Protection ) organic coating and Inorganic coating, Insulation (Insulation types : Acoustic insulation, Head conservation, Personal protection, Anti condensation, Cold conservation) - Design paint system (Hot and cold insulation), Coating survey, New building marine and FPSO and familiar with water ballast tank resolution MSC 215 (82), Special Coating (Powder coating, clock spring, wax, rubber lining). Good knowledge of international standards for offshore such as ISO, ASTM, NACE, SSPC & NORSOK

Job Objective: Looking forward to get a challenge position in an international company (in the field of oil / gas, construction) where I can show my abilities and skills

EXPERIENCES at PT Caterpillar Indonesia Feb 2017 to Present

as Painting Process Engineer

NO

TIME of APPLICATION

PROJECT NAME

OWNER

LOCATION

1

Feb 2017 to Present

HMS 6015B (Hydraulic Mining Shovel)

PT Buma - Borneo

Caterpillar Batam

2

LMT (Large Mining Truck) 777,793 & 797

Caterpillar Dortmund

Caterpillar Batam

PRIMARY DUTIES AND RESPONSIBILITIES:

Identifies available fabrication processes, tools and methods. Evaluates their effects on past successes and failures and the cost of their application. Identifies gaps in available processes and tools, and develops alternatives.

Perform technical data analysis of manufacturing processes to support management decisions;

Design / direct the acquisition, design, fabrication and installation

Troubleshoot day-to-day process issues, develops solutions, and monitors improvements;

Monitor all exchange and in-house requirements;

Procure material related to manufacturing improvements through external suppliers;

Perform quality checks on Blasting and painting application;

Analyze and deploys engineering change notices;

Responsible for provision of Standard Work Sheet, PFMEA, Control Plan, In Process Validation, etc to be used for Production;

Respond to customer issues and lead process improvements; and

To ensure quality improvement by working in systematic manner, formalized procedure design to incorporate contract requirement and design change.

Ensure that all deliveries are inspected on arrival and that the quantities and quality are as specified before the invoice or delivery note is approved. Ensure that Over Shortages & Damage (OS&D) reports are rendered as necessary.

Provide day-to-day coaching duties for Juniorc Painting Engineers.

EXPERIENCES at PT Wasco Engineering Indonesia Jan 2017 to Feb 2017

as QC Painting and Insulation Inspector

NO

TIME of APPLICATION

PROJECT NAME

OWNER

LOCATION

1

Jan 2017 to Fe 2017

Future Growth Project/

Wellhead Pressure Management Project

Kazakh Projects

Joint Venture Limited (KPJV LTD)

Wasco - Batam

PRIMARY DUTIES AND RESPONSIBILITIES:

Carry out systematic inspection at each stage of surface preparation, painting/wrapping and repair works.

Verify the complete implementation of the approved Quality Inspection and Test Plan (ITP) at different stages of painting process.

Verify the implementation of the proposed inspection system for all preparatory, painting and wrapping work via a series of Hold Points in the work schedule, from which the Contractor shall not proceed until he is given formal clearance by the QP Engineer.

Identify all defective or non-conforming work at each stage shall be rectified to the required QP standard.

Witness all contractors’ painters and blasters qualifications carried out by paint manufacturer, and evaluate their associated testing results.

Report daily to QA/QC Coordinator/ Engineer and advise him on the QP’s main contractor compliance to contract procedures and standards and any matters effecting quality

Prepare documents for all items subject for Insulation works from surface preparation up to cladding.

Inspect all works and ensure conformity to standards and specifications which include surface preparation, Insulation lagging and cladding.

Preparing and submitting final hand over documents

EXPERIENCES at PT Lestari Citra Inspektindo July 2016 to Dec 2016

as Freelance Coating and Insulation Inspector

NO

TIME of APPLICATION

PROJECT NAME

OWNER

LOCATION

1

July 2016 to Oct 2016

Horison Oil Sand Project

Technicas Reunidas

Cilegon

PRIMARY DUTIES AND RESPONSIBILITIES:

Review the Contractor’s Procedures, Contracts and Estimation Documents for the Painting/Coating requirements.

Oversee construction activities associated with Insulation, Coating, Painting to ensure compliance with standards (ASTM, SSCP, NACE), engineering drawings, specifications, environmental guidelines, quality assurance programs and construction safety program

Coating Inspection for the Vessels, Columns, Tanks, Strainers and determine the coating condition and damages during operation and provide recommendation to the Contractors through Site Inspection Report (SIR)

Inspection of Surface Preparation and Coating Application including all the specified testes and all points related to the Project Quality Plan and Procedures.

Responsible for Preparation of Insulation procedure of hot & cold Insulation materials and accessories for the project

Review and sign on Inspection reports submitted by Contractors after completion of specified task

Responsible for Preparation of Insulation procedure of hot & cold Insulation materials and accessories for the project

Executing the insulation works for piping and equipment (hot, cold and acoustic insulations) as per the project specification and method of statement.

To ensure quality improvement by working in systematic manner, formalized procedure design to incorporate contract requirement and design change.

Carry out surveillance on activity during execution of project and to ensure implementation of quality assurance system in order to meet QA/QC requirement of the project. Assure that all inspection and test outline in inspection plan are carried out.

Coordinating with Site in-charge & Client's for progress and inspection.

Prepare documents for all items subject for Insulation works from surface preparation up to cladding.

Inspect all works and ensure conformity to standards and specifications which include surface preparation, Insulation lagging and cladding.

Preparation of the punch lists and checked & closed how much completed on daily basics.

Identifying the released items for all areas.

Requesting and carrying out each stage wise inspection with Inspectors

Maintain quality records through documentation and prepare inspection and test plan

Preparing and submitting final hand over documents

EXPERIENCES at PT Tripatra Engineers and Constructors July 2015 until June 2016

as Senior Coating / Insulation & FireProofing Inspector

NO

TIME of APPLICATION

PROJECT NAME

OWNER

LOCATION

1

July 2015 to June 2016

ENI Jangkrik Complex Development Project

ENI Muara Bakau B.V

PT Daekyung Indah Heavy Industri – Cilegon Indonesia

2.

August 2015 to Dec 2015

Senoro Gas Development Project

Joint Operation Body (JOB) Pertamina-Medco E&P Tomori

PT Daekyung Indah Heavy Industri – Cilegon Indonesia

PRIMARY DUTIES AND RESPONSIBILITIES:

Act as Company site representative for Coating activities and undertake regular coating / corrosion condition surveys and paint inspections.

Support the QA / QC Construction Superintendent on site ensuring that the Construction Contractor is fully conversant with all Company project Coatings Inspection related standards and procedures.

Verify that Construction Contractor staff is in receipt of copies of the Chemical and Physical Test Certificates for materials which require such documentation by Code requirements.

Verify in conjunction with the QA / QC Construction Superintendent, that where required by design and fabrication Codes that Coatings procedures have been qualified and approved, and that NDE & Coatings operatives have valid applicators certification and that adequate Coatings records are being maintained. Review and approve sub-contractors daily inspection reports.

Monitor and ensure that a comprehensive record of documentation and certification of NDE & Coatings Inspection work is maintained, and assist in the satisfactory ‘handover’ of completed package from Construction Contractor to Company.

Ensure the Construction Contractor provision of Coatings material receipts, handling, inventory control and distribution at site and maintain an auditable record of all material related transactions.

Ensure that all deliveries are inspected on arrival and that the quantities and quality are as specified before the invoice or delivery note is approved. Ensure that Over Shortages & Damage (OS&D) reports are rendered as necessary.

Ensure that Construction Contractor receipt of all Coatings material and equipment is stored safely and is protected, where necessary, from climatic conditions. In particular, ensure that any specific storage instructions are implemented. Liaise with the QA / QC Construction Superintendent to determine the best storage position for difficult or bulky items.

Supervise the following Site Coatings Inspection interfaces and ensure that Company / Project standards and procedures are fully aligned.

Support the QA / QC Construction Superintendent and other Discipline Superintendents on all aspects of Coatings Inspection activities and ensure that interfaces with other disciplines are managed effectively.

Ensure all agreed Contractor and Fabrication Contractor Insulation ITPs and procedures are implemented within the yard.

Inspection of all Insulation related aspects and, where applicable, sign-off on behalf of the Company.

Provide regular reports on Insulation discipline quality status/issues to the QA/QC Lead – Module Yard.

Monitor Fabrication Contractors insulation materials receipt, storage and handling processes.

Perform Company QC in fabrication yard testing (including applicator qualifications, records traceability).

Review, monitor and closeout of Contractor and Fabrication Contractors Insulation NCR’s/ quality observations within the fabrication yard.

Review Contractor and Fabrication Contractor Insulation records management and preparation for handover.

Ensuring that client products were made to specifications with no damages prior to shipping.

EXPERIENCES at PT Jotun Indonesia Dec 2010 until July 2015

as Senior Coating Advisor

NO

TIME of APPLICATION

PROJECT NAME

OWNER

LOCATION

1

January 2015 to June 2015

Module MV 27,Module Kraken

MODEC, Wartsila

Wasco Engineering

2

January 2014 To January 2015

Jack Up Rig

MSC215 (82)

PSPC standard

GrupoR, Parden Holding, Pemex, Standard Drilling, Noble denton, Transcean, Petrobras, Keppel Fels

Bintan Offshore

3

June 2013 to January 2014

Condensate storage tanks & Fire water tanks

ConocoPhillips

Onshore Conocophillips

4

Januari 2013 to February 2013

Buckle Initiator

Woodside

Technip

5

February 2013 to March 2013

E – House AP LNG

ConocoPhillips

SMOE

6

January 2013 to February 2013

Platform Iraq Oil Export Expansion

Saipem Indonesia

Saipem

7

November 2012 to December 2012

Swift Drilling JB 118

BY. Jack Up Barge

DSAW

8

June 2012 to August 2012

Udang East Flow line Bundle & Riser

PT. PAN

G Top Marine

9

April 2012 to July 2012

Chemical Injection Package

Istana Karang Laut

TOJ Offshore

10

Dec 2011 to Feb 2012

Platform South Mahakam Field Development Phase 1 & 2

Total E & P Indonesie

Nippon Steel

11

January 2012 to March 2012

Liquid Oxygen tanks & Liquid Nitrogen Tanks

Duta Surya Sukses

DSS

12

Nov 2011 to March 2012

Platform South Mahakam Field Development Phase 1 & 2

Total E & P Indonesie

Nippon Steel

13

February 2012 to April 2012

Piping & Structure inlet

Weatherford

TOJ Offshore

14

November 2011 to December 2011

Arthit Bongkot Field Development Phase - Vessel

Transalindo Eka Persada

Transalindo Eka Persada

15

June 2011 to October 2011

E-House Cidade De Paraty

SBM Offshore

Wasco Engineering

16

Dec 2010 to January 2011

Gorgon Barrow Island LNG Plant

Chevron

Citra Tubindo Engineering

17

January 2011 to June 2011

Fish Frezeer Trawler PSPC (New Ship Building)

RObinzon LLC Rusia

DryDock World Nanindah Shipyard

PRIMARY DUTIES AND RESPONSIBILITIES:

Coordinated timely delivery of paint products required for project completion.

Created close-out reports with various projects.

Provided solutions for customer problems without sacrificing the standards for quality and while maintaining the production schedule.

Calculated paint consumptions based on area, dry film thickness and specific coating.

Responsible Follow up action item finding inspection by Yard, and Owner, Review Contractor (Business Partner) document such us Tool & Equipment certificate, Quality manual /procedure Pre Inspection (Design and Fabrication, Pre cleaning, Equipment and Materials abrasive,

Inspect Surface Preparation (Cleanliness, Roughness),

Inspect Paint Application (Mixing thinning, Induction time, pot life, self life, etc),

Final Inspection (DFT, Paint Defect and Recoating Interval), Blasting and painting.

monitoring progress activities, calibration equipment, daily report blasting and painting activity, prepare punch list

EXPERIENCES at PT ASL Marine Shipyard April 2008 until Dec 2010

as Painting Engineer

NO

TIME of APPLICATION

PROJECT NAME

OWNER

LOCATION

1

January 2010 to December 2010

Backhoe Dredger Pontoon Hull 955

Royal Boskalis Westminster

PT ASL Shipyard

2

January 2010 To December 2010

60M AHT/ Supply Vessel Series Hull 863~868

RK Offshore

PT ASL Shipyard

3

March 2009 to April 2010

60M AHT/ Supply Vessel Series Hull 871/874/875

Tidewater Marine International LLC

PT ASL Shipyard

4

April 2009 to April 2010

LTS 3000” Heavy Lift Crane/Pipelay Vessel

L&T Sapura Cres J.V

PT ASL Shipyard

5

September 2008 to September 2009

88M Offshore Support &Maintenance Vessel PAC Bangka

Pacc Offshore PTE.LTD

PT ASL Shipyard

6

March 2006 to December 2008

Bully Thruster Canister

Frontier Drilling USA INC

PT ASL Shipyard

PRIMARY DUTIES AND RESPONSIBILITIES:

Scheduling the activities for Painting works in Pre-erection, Erection and Quay stage.

Working on administrative jobs as daily/monthly evidence, meeting material, reports, internal notes, etc

Working on internal operating program for work orders, man hour, progress and efficiency of the works carried-out by society’s employees and subcontractors.

Daily patrol for checking status of painting jobs.

Attend on daily meeting with DMHI and subcontractors foremen’s.

Assure all information from painting specification ( paint, DFT, curing time, recoating interval, immersion time )

Issuing all necessary documents for subcontracted jobs.

Calculating and managing the paint consumption.

1. Dadang Kurniawan,Technical Manager PT PPG Coating Indonesia, aczx42@r.postjobfree.com, +628**********

2. Dedy tan, Branch Manager PT Jotun Indonesia, aczx42@r.postjobfree.com,+628*********

I hereby declare that all the statements cited above are correct to the best of my knowledge and belief.

Respectfully Yours;

Fachrul Syamsul Alam



Contact this candidate