Post Job Free
Sign in

Project Engineering

Location:
Bengaluru, KA, India
Posted:
April 21, 2017

Contact this candidate

Resume:

Professional Experience Summary

Detailed Professional Experience

APRIL 2016 TO TILL DATE : AS FREELANCER

JAN 2001 TO JULY 2004 AND : TECHNIP. ABUDHABI UAE (14 YEARS IN THE COMPANY)

MAY 2006 TO MARCH 2016 AS SENIOR PIPELINE DESIGN ENGINEER

project : haliba field development project

client : Al dhafra petroleum Operations Co. Ltd

Project involves pipeline systems of oil flow lines, water injection

lines, water supply, disposal, export pipelines to cater the need of

Proposed new Haliba facilities.

project : al dabb’iya asr gas development project

client : Abu Dhabi Company for Onshore Oil Operations (ADCO)

Project involves pipeline systems of Gas gathering, disposal, export

Pipelines to cater the need of proposed new Al dabb’iya wells.

Clusters are connected into gathering stations for transport of well

fluid via pipelines

project : feed of eps for surface facilities of hail field development

client : abu Dhabi oil company limited (ADOC)

Project involves three pipelines & one composite cable proposed to be installed between islands during EPS stage of the development phase.

project : feedservices for Al dabb’iya Facilities development phase-iii

client : Abu Dhabi Company for Onshore Oil Operations (ADCO)

Project involves pipeline systems of gathering, injection, disposal, import and export pipelines to cater the need of proposed new Al dabb’iya wells. Clusters are connected into gathering stations for transport of well fluid via pipelines

project : feed for North East Bab Fields Rumaitha - Shanayel Phase 1 &3

client : Abu Dhabi Company for Onshore Oil Operations (ADCO)

Project scope covers the Front End Engineering Design (FEED) of optimum surface facilities for the NEB Phase III Development Project to handle an additional production of 39 MBOPD Rumaitha and Shanayel fields by 2016.

Package-01 -FEED for Rumaitha / Shanayel Phase III Development considering the scenario of Hydrocarbon (HC) Water Alternating Gas (WAG) for the Enhanced Oil Recovery (EOR)

Package-03 - Feed for Rumaitha North CO2 Injection Project, for conversion of Ra Ph1 Zone B development from current HC WAG scheme to CO2 Injection

project : Feasibility study for new local marketing depot at matla cross country

pipelines

client : kuwait national petroleum company (knpc)

Project scope covers Feasibility Study for New Local Marketing Depot at Matla in the North of Kuwait, lay new cross country pipelines ( 12” dia Gasoil (GO), 16” dia Mogas (UL 95) & 8” dia Mogas (UL 91) 140 Km long each) from to Mina Al-Ahmadi Refinery to Matla Depot for supply of products and provide necessary new pumping facilities at MAA / SHU Refineries.

project : najmah and qaiyarah dpsc feed

client : Sonangol (iraq)

Flow-lines & Trunk-lines: 8”/ 24”/30 “ to transport produced fluids from the well head X-mass trees to MPVS and 15 km far inlet manifold of the new Central Processing Facilities (CPF).Export pipeline 30”- 166 Km

project : onshore processing facilities (opf)

client : kuwait gulf oil company (kgoc)

The Project involves Flow Assurance study for Raw Gas Pipeline, both submarine and land portions included, the Onshore Processing Facilities (OPF) at Al-Zour to separate and treat the products and the land pipelines ( 57 km long, three pipelines) to transport the gas and condensate & oil to the Mina Al-Ahmadi Refinery.

project : khafji crude related offshore projects (kcrop)

client : khafji joint operations (kjo)

work covers the installation of two integrated wellhead jackets, two power distribution platforms, a main composite submarine cable as well as a number of infield cables, a new living quarters platform and control room. The contract also includes the complete refurbishment of the existing LQ and OCP platforms.

project : Rasgas onshore expansion project phase-2 (train 6 & 7 epc)

client : Ras laffan liquefied natural gas company limited

Rerouting of phase-1 link pipeline (18’’ gas export pipeline). And 24” sanitary water, 6” potable water and 4’’ treated effluent water pipeline from Ras Gas camp to WWT plant area. Total E& P Angola- Soya pipelines rehabilition phase-1 Preparation of design calculations and Stress Analysis for series of Pipelines (30”, 36”, 40”) with Pig traps to be replaced under rehabilitation plan to upgrade the infrastructure.

project : gas treatment plant at al dabbiýa project -FEED

client : occidental qatar company (oxy)

FEED of the pipelines involved in the “Gas Treatment Plant at Al Dabb’iya” project. The project comprises of 10 different multi-product pipelines. Six interconnecting Pipelines, Two sales Gas Import & Export Pipelines and one potable water and produced water pipelines.

project : asab-3

client : abudhabi gas industries limited (gasco)

The Abu Dhabi Company for Onshore Operations (ADCO) plans to install a new Central Degassing Station (CDS) at ASAB to support future increased oil production from the ASAB,Sahil and Shah Oil Fields.The main objective of this Project to Support the increased oil production and relocated ADCOCDS facilities and accommodate up to 150 MMSCFD of additional associated gas at ASAB through a combination of the installation of a new Booster Compression Station, the debottlenecking of ASAB-0 and partially diverting gas to ASAB-I/II through the Pipelines. This project comprises of series Pipelines ( Process Transfer Lines, Divert Gas, Lean Gas, Utility Lines and Drain Return Lines) ranging from 48 “ to 3” with MOC of CRA, CS.

project : inter refinery pipelines (irp-ii)

client : takreer

The main objective of the IRP II Project to handle the increase in future product movements by pipeline up to the year 2025 in UAE.The project involves FEED design of about 1200 Km length of Oil Pipelines (JET A1, ULG, GasOil) running in between the Takreer Ruwais Refinery, Mussafah Depot, ADRD, Al- Dhafara Air Base, Alain (ADNOC Distribution), and DWC, DXB, AGI and Shweihat Power station.Prepares / Checking Pipeline design reports.

project : feed for new acid gas recovery plant at dukhan

client : qatar petroleum (qp)

The main objective of the project is to treat 450 MMSCFD of Khuff gas to supply sweet fuel gas to industrial customers in the State of Qatar. The plant shall be installed at the Dukhan Arab-D Plant Qatar.New gas transportation pipelines for carrying sour gas to the AGR Plant and transporting back dry sweet treated gas to Station-N.

- Sweet gas (30 inch dia,15 KM length ) pipeline from Arab – D to Station – N

- Sour gas supply (30 inch dia 15 KM length ) from Station – N to Arab D’

project : Offshore associated gases (oag – package 1)

client : Adgas

Detailed engineering design of the pipeline system including the pig launcher, the onshore pipeline section and the beach valve facilities at Das Island. The DasIsland 30” onshore pipeline ties-in to the DasIsland gas export facility pipe work, located within the pig launching facility and runs through to the beach valve, on the west coast of DasIsland.

project : permanent gas compression project

client : total yemen

12’’ Export oil Pipeline from NEXEN facilities to Kharir CPU, 46.5 Km with 4.2 KM of Wadi Crossing 10’’ Import/ Export Oil Pipeline and 6” Produced Water pipeline running in between CPU, CCU& BPU. HP flow lines from twelve production wells to a system of four Trunk lines (10”/8”/6’’, 42 km pipeline length) connected to the compression centre manifold with Pigging facilities including 10’’ HP Gas and Oil Export Pipeline

project : Bab gas compression project (conceptual & feed engineering)

client : abudhabi company for onshore oil operations (adco)

Concept study for (Thamama C, D and units 6 & 7 Trunk lines, gathering manifolds and associated RMS) identifications of various options and select the best option for pressure boostingof well fluid from various producing/future wells ( 8”, 12 “ & 16 “ Flow lines/ Trunk lines total length of about 90 Km)

project : salman offshore facilities project (epc-3)

client : pedco & national iranian company (nioc)

Preparation & checking of all pipeline design documents, Generation of pipeline MTOPreparation pipeline Material and Construction specifications, Assisting in Preparation of pipeline design drawings.

july 04 to may 06 : valdel engineers & constructors ltd. bangalore. india

designation : senior pipeline design engineer

project : mora sajood gas pipeline project

cleint : gujarat state petronet limited (gspl)

Involved in Complete design & detailed engineering including procurement engineering for 58km long 24” Pipe Line from Mora Station to Sajod Station in Gujarat State for transporting 16MMSCMD / 8MMSCMD of sweet Natural Gas

project : anand rajkot gas pipeline project

cleint : gujarat state petronet limited (gspl)

Involved in Complete design & detailed engineering includingprocurement engineering for 225km long 24” dia crude oil pipeline consisting of despatch terminal, Receipt terminal, Intermediate Pigging & pumping stations

project : darood jafarabad gas pipeline project

cleint : gujarat state petronet limited (gspl)

Involved in Complete design & detailed engineering including procurement engineering for 215km long 24” dia crude oil pipeline consisting of despatch terminal, Receipt terminal, Intermediate Pigging & pumping stations.

project : arpl- morbi dhuva spurline project

cleint : gujarat state petronet limited (gspl)

Complete design & detailed engineering including procurement

engineering for 22.630km long 12” Pipe Line from Morbi to Dhuva

project : cb-x facilities / pipeline project. suvali

cleint : cain energy india pvt. ltd india

Involved in Complete design & detailed engineering including procurement

engineering about 9km long 6” onshore terminal installed

connecting the CB-X facility to the existing suvali onshore terminal.

feb 98 to jan 01 : saudi aramco – kingdom of saudi arabia (ksa)

(on secondment through nesma emcor co. ltd)

designation : pipeline engineer

project : saudi aramco –installation of pipelines & cables

Job involved pipeline rerouting for above ground/buried and sub-sea

pipeline sections, layout of ten-scraper trap stations, in-plant piping

modifications at 13-sites comprising AB, DRT, QA, QRT, TFJB and RTJ X-

country pipelines in the Eastern Province of Saudi Arabia .Performed

flexibility analysis by using CAESAR-II

feb 94 to feb 98 : johnbrown technologies (i) technologies bangalore. india

designation : pipeline engineer

Preparation & checking of all pipeline design documents, Generation of pipeline MTO, Preparation pipeline Material and Construction specifications, Assisting in Preparation of pipeline design drawings



Contact this candidate