Post Job Free

Resume

Sign in

Instrumentation

Location:
6038, Philippines
Salary:
80k PH
Posted:
April 20, 2017

Contact this candidate

Resume:

Curriculum Vitae

Personal Information:

Name:

Efren Sarnillo Reyes Jr.

Civil status:

Married

Date of birth / Age:

March 4, 1984 / 33

Nationality:

Filipino

Sex:

Male

Height:

5’8”

Weight:

150 lbs.

Philippine Contact #:

+639*********

Current Location:

Philippines

E-mail:

aczwpl@r.postjobfree.com

Home Address:

Cantabaco Toledo City, Cebu Philippines 6038

Passport No:

EC0745756

Date of Issue & Expiry Date:

April 2, 2014 to April 1, 2019

Seaman’s Book No:

B1002036 (Expired)

Date of Issue & Expiry Date:

April 5, 2011 to April 3, 2016

Total Experience:

11 years

Position Applied for:

Instrumentation Engineer / Technician

Objective:

Seeking for a challenging career in Electrical & Instrument Engineering with Specific focus on

EPC (Engineering, Procurement and Construction) projects in different Industrial Power Plant.

Summary of work Experience:

A highly motivated and 4 year’s professional graduate of Bachelor of Science in industrial technology, major in electrical technology. Capable of delivering at the highest level, I first-rate organizational skills and the ability to produce a consistently high standard of with excellent interpersonal skills, I am an effective team player and capable of engaging and liaising with a broad range of individuals from a variety of backgrounds and wide exposure in instrumentation, electrical & telecom installation inspection, Engineering, construction, hook-up, Leak testing, Loop test, pre-commissioning and commissioning of various kinds of plant, wide exposure in oil and gas production and processing facilities and petrochemical plant. My experience to date has provided a wealth of specialist skills and expertise and I am committed to facing fresh challenges and to pursuing my future career goals.

Codes & International Standard Familiarized:

NEC, IEEE, F&G, NPT, P&IDs, AFC, IEC, NFPA, ANSI, ISO, ISA, BSP, API, ASME, NEMA, SAES and SAMSS. (Saudi ARAMCO Engineering standards & material specification.)

Special Achievements:

Deliver a successful roll out of new project where the result were proven to have the

Company 100% overheads in my area while increasing productivity by 80%.

Aramco Approved Transmittal Number as QA/QC Instrumentation Inspector:

Transmittal #: HKAD-T5648 project at Saudi Aramco JRTP Package 14

Transmittal #: SADARA-L&T-262-12 project at SADARA Saudi Aramco & Dow Chemical (Joint Venture)

Transmittal #: SA-JER-PIAAA-MRKE-521582 project at SATORP Saudi Aramco & Total Oil Company (Joint Venture)

Relevant Professional Experience:

1.Name of the Company : Aamcon Engineers & Inspectors Supply at

Hanwha Engineering & Construction (EPC)

Name of the Project : Saudi Aramco Jizan Refinery and Terminal Project Package 14 Duration : October 15, 2016 up to January 31, 2017

Position Held : QA/QC Instrumentation Inspector

Client : Applus Velosi KSA & TUV Company (PID)

2.Name of the Company : Aamcon Engineers & Inspectors Supply at

Arabian Bemco & GS E&C (EPC Joint Venture)

Name of the Project : Combined Cycle Power Plant #12 (PP12)-2,175 MW Riyadh KSA

Duration : December 12, 2015 to October 5, 2016

Position Held : QA/QC Electrical & Instrumentation & Control Inspector

Client : Parson Brinckerhu (PMC)

3.Name of the Company : Larsen & Toubro Hydrocarbon (EPC)

Name of the Project : SADARA - Saudi Aramco & Dow Arabia Chemical Package

Polyethylene Train 1, 2 & 4 in Jubail II KSA

Duration : August 1, 2012 up to August 31, 2015

Position Held : QA/QC Electrical & Instrumentation Inspector

Client : Jacobs Zate Saudi Arabia (PMT)

4.Name of the Company : M.R. AL-Khathlan Contracting Co. (EPC)

Name of the Project : SATORP - Saudi Aramco Total Oil Refinery & Petrochemical

Package 5C Auxiliary Utilities in Jubail II KSA

Duration : October 20, 2010 up to July 10, 2012

Position Held : QA/QC Instrumentation Inspector

Client : Al-hugayet, Al-hoty and Sraco Company (PID)

5.Name of the Company : Hanwha Engineering & Construction Co. Ltd. (EPC)

Name of the Project : MA’ADEN Phosphate Project Power and Desalination Plant

in Ras Az Zawr KSA

Duration : May 28, 2009 to August 30, 2010

Position Held : QA/QC Instrumentation Inspector

Client : Worley Parson (PMC)

6.Name of the Company : Arabian BEMCO Contracting Company Ltd (EPC)

Name of the Project : SCECO Riyadh Power Plant Project No.9 Extension &

Reinforcements 1,800MW Block C, D, E & F) KSA

Duration : September 27, 2006 up to April 25, 2009

Position Held : QA/QC Instrumentation & Control Inspector

Client : Saudi Consultant (PMC)

Duties and Responsibilities:

Always work Safety first.

Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan preparation.

Coordinating with Construction Supervisor project plan drawing review-having AFC drawing officially approved documentation.

Represent Company during weekly meeting concerning schedule plan activity and project plan on all tools and equipment needed for construction.

Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all concerned lead official.

Ensured instrument equipment works complied with project specifications, company procedures, method statements and quality assurance and controls documentation (strictly implementing the ISO 2000 and ISO 9000).

Supervised and monitoring the flow of inspection on-site and calibration prior to meet the project deadline.

Able to analyzed every area to be survey and witness prior for RFI to be offered to the main client for inspection.

Assigned to witnessing repair and calibration of instrumentation, commissioning of the following equipment:

To undertake inspection of vendor skids before final acceptance by client.

Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation Workload.

Material verification and Take store keeping of instrument material under control to be under a proper condition to avoid any damage or bad effect during warehousing

Correct interpretation of equipment labels, IP Rating etc.

Promptly report and document in all instances of nonconformance.

Review Instrumentation works QA/QC Procedures/ITPs as per Project Specifications..

Insure that all necessary inspections as identified in the approved Inspection

and Test plan (ITP) and are attended by a suitable QA/QC Inspector.

Ensure that the production quality being offered for inspection meets the client’s

requirements and Monitor and report Key Performance.

Ensure that all deviations from the Project Quality Program and the Company

integrated management system (IMS) are documented and recorded.

Coordinate the generation of client Requests for Inspections (RFI) where required

providing sufficient notice for Hold, witness and inspection Points.

Review & check documents for instrument loop folder package prior to final walk down.

Review final Dossiers documents if the attachment’s complete prior to handover.

Inspect each instrument against data sheet prior to release to site for installation.

Inspect instrument stanchions, location, mounting height, orientation etc.

Inspect installation of Instruments including glanding termination of cables.

Inspect installation/hook up and pressure test of impulse tubing and air supply/signal lines.

Inspect installation of supports prior to cable tray installation.

Inspection of cable tray/conduit installation prior to release for cable laying.

Inspect UG stub-ups and instrument earthing of panels, cables etc.

Inspect cable trench for sand bedding prior to cable laying and release each layer.

Inspect cable segregation arrangement etc prior to back filling.

Inspect cable glanding, termination, dressing of cable wiring inside each JB’s and local panels.

Inspect installation of various control panels, consoles, desks.

Inspect internal cable tray works prior to installation of cables.

Inspect installation of various cables including system cables.

Inspect installation of various F&G instruments, control panels.

Witness calibration of each instrument as required by ITP/specifications.

Witness pressure/leak testing of air supply/signal lines/pressure test of impulse tubes.

Witness inspection/test related to analyser houses.

Witness IR/continuity test of cables on the drum, prior to back filling trench, after glanding and termination.

Witness testing of the F&G circuits and system as applicable and loop continuity checking.

Verify completion of heat tracing for impulse tubes.

Verify all inspections related each loop components have been carried out as per applicable ITP’s and documented.

7.Name of the Company : Goodfound Engineering and Construction Corporation (EPC)

Name of the Project : TIPCO Apec 50 MW-200 T/H Co-Generation Power Plant

Duration : June 01, 2005 to July 26, 2006

Position Held : Asst. QA/QC Electrical & Instrumentation Inspector (OJT)

Client : Formosa Taiwan (PMC)

Duties and Responsibilities:

Always work Safety first.

Material verification and Take store keeping of E&I material under control to be under a proper condition to avoid any damage or bad effect during warehousing

Correct interpretation of equipment labels, IP Rating etc.

Promptly report and document in all instances of nonconformance.

Review E&I works QA/QC Procedures/ITPs as per Project Specifications..

Insure that all necessary inspections as identified in the approved Inspection

and Test plan (ITP) and are attended by a suitable QA/QC Inspector.

Ensure that the production quality being offered for inspection meets the client’s

requirements and Monitor and report Key Performance.

Ensure that all deviations from the Project Quality Program and the Company

integrated management system (IMS) are documented and recorded.

Coordinate the generation of client Requests for Inspections (RFI) where required

providing sufficient notice for Hold, witness and inspection Points.

Review & check documents for instrument loop folder package prior to final walk down.

Review final Dossiers documents if the attachment’s complete prior to handover.

Responsible of E&I installation & inspection activities on the Site.

Installation & inspection of instruments and electrical equipment’s and panels.

Supervise the quality control function on site.

Issuing, follow up and approval of NCR and MRS.

Inspect Electrical & Instrumental Work carried out by the yard.

Conducting different tests such as line check& loop tests carried out by the Yard.

Monitoring, review and inspection of all major activities and progress of the E&I construction works.

Inspect installation of various control panels, consoles, desks.

Inspect internal cable tray works prior to installation of cables.

Inspect installation of various cables including system cables.

Inspect installation of various F&G instruments, control panels.

Interface with engineering, planning and procurement as well as other disciplines.

Responsible for his own safety and others safety working around him.

Responsible to have reasonable care towards the environment and contribute in energy savings and waste reduction.

Added Skills:

Skills – Organized / Soft Skills - Professional Motivated Ethical / Behavior Skills - Excellent Communicator.

MS Word, Excel / PowerPoint Knowledgeable in internet connection, etc.

Ability to work on tight deadlines and prioritization of work to achieve them and with minimal Supervision.

Team player with excellent leadership and communication skills.

Use logic and reason to identify the strengths and weaknesses of alternative solutions, conclusions or approaches to problems.

Ability to listen to and understand information and ideas presented through spoken words and sentences.

Training and Organization Attended:

A.Certificate of Completion of Life Critical Safety Training at SADARA Project

Logout & Tag out / Defensive Driving / Electrical Safety / Hazard Recognition /

Fall Protection / Working at Heights / Confined Space / Excavation / Critical Lifts – Aerial Works / Safety Work Permit / Grinding / Special PPE / Hot Work Permit / Total Safety Task Instruction / Total Safety Task Observation / Chemical Safety / Mechanical Safety / Life Critical Safety Tags in SADARA Package Polyethylene Project Saudi Arabia.

B.Certificate of Safety Excellence and Certificate of Appreciation for Safety of the Month in SADARA Package Polyethylene Project Saudi Arabia.

C.Certificate of Completion of Basic Safety Training University of Cebu Maritime Education and Training Center.

Module I: Emergency First Aid / Module II: Personal Survival Techniques /

Module III: Fire Prevention and Fire Fighting / Module IV: Personal Safety and Social Responsibility Advanced Training in Fire

D.Certificate of Participation in Seminar on Social Graces in Junior Interaction 2005 from February 16, 2005 to March 11, 2005.

E.Certification of Executive Technical Consultants Trade Test and Training Center as Instrumentation Technician on August 27, 2006.

F.Certificate of Recognition for having garnered 6th place sports writing (English) category during the 12th division schools press conference on October 20-21 2000.

Safety Awareness:

Work effectively as part of Project Safety Team and work to influence contractor and subcontractor safety performance and lead by example.

Promote safe working practice and monitor contractor and subcontractor performance for Quality, inclusive of safety hazard identification.

Supports and facilitates the Contractors Safety Management System.

Keeping head straight and facing forward while you work.

Paying attention to the body and seek prompt treatment for injuries caused by overexertion.

Education:

College : Cebu Technological University (former CSCST)

Course : Bachelor of Science in Industrial Technology

Major in Electrical Technology

Date Graduated : March 2002-2006

High School : Cantabaco National High School

Date Graduated : March 1998-2002

Elementary : Cantabaco Elementary School

Date Graduated : March 1992-1998

Character References:

Person Name : Mr. Elizalde Ordonez

Position : QA/QC Site Supervisor

Contact number : 054*******

Email : aczwpl@r.postjobfree.com

Company : Hanwha E&C KSA

Person Name : Mr. M. K. Sankar

Position : QA/QC Site Manager

Contact number : 050*******

Email : aczwpl@r.postjobfree.com

Company : L&T Hydrocarbon KSA

Person Name : Mr. Ediaz Santos

Position : SR. Instrumentation & Control Supervisor

Contact number : 054*******

Email : aczwpl@r.postjobfree.com

Company : Jacobs Zate KSA

Declaration

This is to certify that the above information is true and correct to the best of my knowledge and abilities.

Efren S. Reyes Jr.

Applicant



Contact this candidate