Post Job Free

Resume

Sign in

Plant Operator

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Posted:
April 20, 2017

Contact this candidate

Resume:

MUHAMMAD IMRAN

Production Officer

Cell: 030*-*******,031*-*******

E: mail: aczwkw@r.postjobfree.com

Skype ID# MuhammadImran19871

Postal Address: House #1787/96, Mohallah Iqbal

Nagar T.B Hospital Road, Chungi # 14, Multan.

Total Experience (09 years)

Relocation: Yes

OBJECTIVE:

To pursuer career in a progressive organization that provides opportunities for career growth and professional development in order to groom the overall personality

Industry Experience (9years )

2 years Production Officer (DCS Operator )

5 years Field Operator

2 years Technical Management Trainee

Qualification;

Qualification

Year

Division

Board

Matric

2005

2nd

B.I.S.E Multan

D.A.E Chemical

2008

1st

P.B.T.E Lahore

B-Tech Chemical

2012

1st

B.Z.U Multan

C Class Boiler Engineering

2015

-

Punjab Board of Boiler Engineers Lahore

Nimir Chemicals Pakistan Ltd As Production Officer ( 11-02-2013) to till date:

As a Production Officer Nimir chemical Lahore Pakistan a Petrochemical (Aromatics ) Production & Refining complex.

Process Summary:

Partial oxidation of Ortho Xylene using BASF catalyst in 2 Vertical Fixbed Tubular Reactors having 5028 and 4641 tubes is produced Phthalic Anhydride as main product and Maliec Anhydride as Byproduct.Plant has a production capacity of 25,000 tons p/a Phthalic Anhydride and 720 tons p/a Maliec Anhydride.The reaction is an exothermic one and heat produced is recovered by a Salt bath circulation system in reactors and then used to produced Steam.Phthalic Anhydride is purified by a contineous Vacuum Distillation in two columns and finally stored in the form of Flakes.

Monitor and Control the plants using the DCS systems and Centum CS3000 by YOKOGAWA Japan.

Work on following Sections.

PHTHALIC ANHYDRIDE PLANT:

A)Oxidation Section:

Reactor(Vertical Fixbed,Tubular)

Programmable Switch Condensers

Scrubber

B) Distillation section:

Heat Pre-treatment Vessels

Distillation Columns

MALIEC ANHYDRIDE RECOVERY PLANT

Dehydration Column(Azeo tropic Distillation)

Vacuum Distillation Column(Fractional batchwise)

Pelletizer

Di-Octyle Phthalate Batch Process Plant

CSTR Reactor Esterification process having capacity

50 ton/day

Utility Plant

As a Utility operator I have performed duty following sections

Package Type Fire Tube Boiler having Pressure 28 Barg

Chaine Grate Coal Fire Oil Heator

Steam Turbine 1.5 MW condensing type 330 C

Demine Water Plant having capacity 8 m3 / h

Nitrogen Plant having capacity 26 m3 / h

Compressor having Pressure 8 barg

Cooling Tower having capacity 51m3 / h

Job Description :

Experience in Catalyst loading of tubular and fixed bed reactor

Experience in handling STEAM AND POWER Network of 30 bar for Steam Turbine system

Executing and condition monitoring of process activities in the field.

Experience in operating DCS system yokogawa centum CS 3000

Experience in simulations.

Safety and regular checkup of plant colnditions

Monitoring, Measurement and Control of process parameters, Trouble shooting, House Keeping, Reporting abnormalities and non-conforming products.

Sampling of products for analysis

Follow up of normal start up and shut down procedures.

Condition monitoring of Rotary Equipments.

Carrying out small maintenance activities.

Co-ordinate with all maintenance departments like Mechanical, Electrical and Instrumentation for maintenance job to be carried out...

Maintaining the log book

Conducting and maintaining the preventive maintenance record of rotary equipments to avoid failures.

Safely isolating the heavy equipments for maintenance.

Maintaining the record of Raw material, solvent Qty and raising the order for procurements for continuous run of plant.

Tracking the Quality and Yield of the product and taking necessary steps to increase the yield

Rupali Polyester Ltd Sheikhupra(01-01-2011 to 10-02-2012):

I have performed duty as Plant Operator at Polymer Plant having capacity 105 ton/Day

Engro Corp (Pvt.) Ltd (23-08-2008 to 31 December, 2010) as a Technical Management Trainee

Operations:

Fire tube boiler having capacity 15 ton/h Package type

Reverse osmosis (R.O) plant double pass having capacity 30 ton/h

Water softening plant Zeolite process.

Air Compressor Oil Free zero class air having pressure 8 barg

Water Tube Boiler having capacity 30 ton/h @ 65 barg

4MW extraction, condensing steam turbine for 4MW generator, speed 9077 rpm, Steam Consumption 25T/Hr. Inlet Steam Pressure 60Kg/cm2, Inlet Steam Temperature 450 0C.

Erection & Commissioning:

I have experience of Erection and Commissioning of Husk Fired Steam Boiler,4MW extraction condensing steam turbine, RO, Mixed Bed, ETP, CT, Fire fighting Equipments, Air Compressors, Fire Hydrant system,Pakage Type Boiler,Diesl, Unloading system etc.

Special achievements;

I participated from operational team to Design review of High pressure steam Boiler with DESCON, TIE, HMC and project team.

H.S.E & Professional Development Skills:

Certified emergency squad member of the unit

Work permit system & Implementation

Safe electrical lock out, tag out and try procedures/ hazardous energy isolation

Process Safety and Risk Management (PSRM).

Personnel Safety Management (PSM).

Hazards Operability (HAZOP).also participated in 03 hazop of the facilities

Pre Start-up Safety Review (PSSR. also remained (05) times the member of PSSR team.

Fire fighting, prevention & control.

Process Hazards Analysis (PHA).

Industrial Hygiene & HSE policy & Application.

First Aid & Life saving training from Rescue 1122 Punjab

Personal Information;

Father's Name Muhammad

Date of Birth 03-02-1987

CNIC No 3630-2502609-3

Domicile Multan Punjab

Nationality Pakistani

Religion Islam

Marital Status Single

Skype ID Muhammadimra19871

Passport No. FR1226091

Computer Skills;

M.S word, M.S Excel, Internet Browsing.



Contact this candidate