Post Job Free

Resume

Sign in

Project Manager

Location:
Singapore, Singapore
Posted:
May 18, 2017

Contact this candidate

Original resume on Jobvertise

Resume:

ER.JAMES D.ABARCA

M & E Projects- Oil & Gas, Industrial & Commercial Building Applications

NRIC # G5162453Q-Singapore

SUMMARY OF QUALIFICATIONS:

- FIELD OF EXPERTIES:

- M & E Services on LNG-Liquefied Natural Gas Plant, OIL & GAS/CHEMICAL PLANT, TUNNELING,

INDUSTRIAL PROJECTS and COMMERCIAL/RESIDENTIAL BUILDINGS.

- Project and Technical Management with more than 15 years of experience in the field of Mechanical Engineering

Construction and Management.

- Completed multi-million worth of M & E services in Industrial, Commercial and Oil & Gas applications.

- Competent leadership in functional teams, liaising with clients, consultants & contractors ensuring completion

of project milestones.

- With competent and certified professional skills in PMP(Project Management Professional), LEED(Leadership in Energy &

Engineering Design), CSPCM(Construction Safety Course for Project Managers), QEHS( Quality, Environment-9001,

Environment-14001, Health & Safety-18001)Integrated Management System and OPSIC-Oil Petro-Chemical Industry Safety

Course.

- With knowledge & experience in application of BIM-3D Revit, MS Project, Primavera, AutoCAD, Plan swift (QS), Elite

ACMV Heat Load Calculation & Firepro Hydraulic Calculation.

- CURRENT/ EXPECTED SALARY: SGD 4.500.00/ SGD 5,500(All-in)

REASONS FOR LEAVING: FOR CAREER GROWTH & DEVELOPMENT

AVAILABILITY: 1 to 2 MONTHS NOTICE

PROFESSIONAL BACKGROUND:

AUGUST 2011-PRESENT DELUGE FIRE PROTECTION(S.E.A.) PTE LTD SINGAPORE

PROJECT MANAGER

DUTIES & RESPONSIBILITIES:

Manage the effective integration & collaboration of Project teams, Procurement, Engineering, Planning, Logistics, Fabrication, Contracts, QA/QC,Testing/Commissioning, Health/Environment/ Safety(HES) so as to ensure smooth flow of project operations.

Ensure and manage a safe site work place at all times in all stages such as installation works, lifting operations and hydro test/pneumatic test. Aim to minimize our exposure and risk on project.

Creates and executes project work plans and revises as appropriate to meet requirements especially on critical activities.

Identifies and manage systematically all resources needed such as materials, manpower & equipment so as to deliver required deliverables within the optimistic or pessimistic dates of implementation.

Ensures project documents are complete, current, and filed appropriately

Tracks and monitor work productivity.

Closely coordinate to Consultant, Main-contractor and sub- contractors for other services.

OVER-ALL, ensuring a profitable, safe & successful project.

Manage & Arrange team for DLP (Defects Liability Period) works modification & maintenance.

SINGAPORE PROJECTS COMPLETED:

WOODSVILLE TUNNEL INTERCHANGE by LTA

Main Contractor: GAMMON CONSTRUCTION PTE. LTD.

Consultant: AECOM SINGAPORE

Systems involved in the project:

Design & Installation of Fire Protection & Alarm System

Singapore LNG( LIQUIFIED NATURAL GAS) Plant

Main Contractor: SAMSUNG C & T

Design/Consultant: FLUOR DANIELS ENGINEERING

Project Management: FOSTER WHEELER

Scope: Design & Installation of:

LDC- Large Dry Chemical System, HPCO2- High Pressure Carbon Dioxide System,

FM200 System for building & LNG Tanks, Fire Sprinkler System, Fire Alarm System,

Fire Water Hose Reel System, Water Spray System, Remote Controlled Elevated Firewater Monitors

Remote Controled Elevated Dry Powder Monitor, Fixed Water Monitor, Portable Water Monitor

Oscillating Monitor, Water Curtain Systems, 4-Way Hydrant, CO2 Systems,

Wheeled Fire Extinguishers-Dry Chemical

NALCO CHAMPION Chemical Plant

Design,Consultant & Main Contractor: JACOBS ENGINEERING & CONTSRUCTION

Scope: Design & Installation of:

Fire Sprinkler System, FM200 System, Fire Alarm System, Fire Water Hose Reel System

Water Spray & Foam System, Fixed Water Monitor, 4-Way Hydrant, Foam Systems

CELANESE VAE CHEMICAL PLANT

Consultant: KLAU CONSULTANTS

Main Contractor: JACOBS ENGINEERING

Scope: Design & Installation of Fire Sprinkler System, Fire Alarm System, Fire Water Hose Reel System

Wet Riser & Dry Riser System, Hydrant System

HUNTSMAN CHEMICAL PLANT

Consultant: KLAU CONSULTANTS

Main Contractor: JACOBS ENGINEERING

Scope: Design & Installation of Fire Sprinkler System, Fire Alarm System, Fire Water Hose Reel System

Wet Riser & Dry Riser System, Hydrant System,IG100 System

ON-GOING PROJECT:

SENGKANG COMMUNITY & GENERAL HOSPITAL

Consultant: PARSONS BRINKERHOFF

Main Contractor: PENTA-OCEAN

Scope: Design & Installation of Fire Sprinkler System, Fire Alarm System, Fire Water Hose Reel System

Wet Riser & Dry Riser System, Hydrant System,IG100 System

JULY 2009- JULY 2011 DARWISH TRADING CO.W.L.L. DOHA QATAR

ACVR( Air-conditioning, Ventilation & Refrigeration Division)

ASSISTANT TECHNICAL MANAGER cum SERVICE MANAGER

DUTIES & RESPONSIBILITIES:

Manage and collaborate the integration & coordination of three departments such as EQUIPMENT

INSTALLATION, DUCT FABRICATION & MAINTENANCE TEAMS so as to achieve a successful project package.

Facilitate Technical trainings for technicians and staff so as to ensure a competitive team.

Establish proper QAQC procedures & standards on Duct Fabrication, Equipment Installation & Maintenance requirements.

Manage, analyze & resolves customer complaints on maintenance & installation issues.

Manage, monitor and resolves service calls with critical issues or complaints.

To review customer surveys and must create plans & actions for improvement whenever necessary.

Ensure supply chain management and monitor inventory of stocks at warehouse.

Fleet management on service vehicles and ensure proper dispatching of technicians based on priorities.

Ensure compliance with all safe work practices and procedures.

Review & approval of tender or shop drawings on equipment & duct installations.

Be a key player for efficient execution of projects based task within agreed timeframes & budgets.

Provide consistent, sustainable and effective engineering direction for all projects within a portfolio so as to ensure successful delivery, installation, testing & commissioning of Air-conditioning.

To set up & maintain the Project File and Project Database Entry.

To be responsible for updating plans, schedules and progress reports with coordination of Sales engineers & Installation/Ducting Supervisors.

To liaise with the Client/ Representative, Main Contractors & Consultant.

To ensure the project is adequately resourced and to identify additional requirements for action.

PROJECTS COMPLETED:

QATAR PETROLEUM WORKSHOP, RAS LAFAN OIL & GAS, ABM MILITARY COLLEGE

RESIDENTIAL & COMMERCIAL

JUNE 2008-JUNE 2009 HAPCO GROUP(FZCO) DUBAI,UAE

CLIENT REPRESENTATIVE - MECHANICAL ENGINEER

DUTIES & RESPONSIBILITIES:

Review and give comments on shop drawings submitted by Sub-Contractors and discuss with the consultant for any revisions.

Inspect if Designs & Specifications for projects are correctly executed at site and discuss with the consultant for any necessary actions.

Impose the QUALITY ASSURANCE of every scope of work.

Issue SITE MEMO to consultant or main contractor or any Non-conformance on site in terms of quality & progress.

Attend to Technical meetings and coordination meetings.

Collect, Sort & Recommend for the best & quality quotation of materials offered by suppliers.

Issue NOMINATION LETTER addressed to the consultant for any supplier or Sub-Contractor who was

awarded under the PROVISIONAL SUM SCOPE.

Review CONTRACTS offered by the Contractor & Consultant prior to approval of the owner with reference to FIDIC.

PROJECTS COMPLETED:

G+1(Labor Accommodation), G+Warehou201es, G+8+HC+POOL

- A/C, FAHU & VENTILATION PROJECTS

- FIRE ALARM & SPRINKLER SYSTEM

- PLUMBING & WATER SUPPLY SYSTEM

- INSTALLATION OF LOW VOLTAGE SYSTEM such as GATE BARRIER,

ACCESS CONTROL (SECURITY), CCTV, SMATV PABX & music system.

- INSTALLATION, TESTING & COMMISIONING OF KONE ELEVATORS.

- IRRIGATION SYSTEM & WATER FEATURES

- INSTALLATION OF GYM & EQUIPMENT.

- INSTALLATION, TESTING & COMMISIONING OF SAUNA,SWIMMING POOL

INSTALLATION, TESTING & COMMISIONING.

SEPTEMBER 2006-MAY 2008 H2O ENGG & TECHNOLOGY PHILIPPINES

REGIONAL MANAGER - BAGUIO & CAGAYAN VALLEY

DUTIES & RESPONSIBILITIES:

Directly report to the Chairman of the company.

Manage the concept & integration of design, Installation & Maintenance of REVERSE OSMOSIS SYSTEM.

Management of the overall operations and administrative aspects of the branch offices.

Have direct communication and transaction with the government agencies concerned.

Work closely and give directions to technicians and sales personnel

Maintain revenue goals by quarter and year to date

Develop new and updated skills for technicians and sales strategies for the sales and marketing staff

PROJECTS COMPLETED:

BAGUIO CITY WATER DISTRICT, AQUA RIOS R.O. SYSTEM PLANT, ISABELA PURE R.O. PLANT

DECEMBER 2002-SEPTEMBER 2006 JDA CONSTRUCTION & ASSOCIATES PHILIPPINES

CONTRACTOR/MANAGER ( Mechanical- Engineering, Project Management & Construction)

DUTIES & RESPONSIBILITIES:

Participate in the Invitation to Bid of projects.

Prepare Tendered drawings & quotations.

Execute CONTRACT OF AGREEMENT with the client.

Preparation of submittals & coordinate shop drawings

Plan, manage and monitor construction phase.

Prepare, develop and implement a written plan and site rules (Initial plan completed before the construction phase begins)

Make sure suitable welfare facilities are provided from the start and maintained throughout the construction phase

Check competence of all appointees

Ensure all workers have site inductions and any further information and training needed for the work

Testing, Commissioning & hand over of the project.

Secure the site with comprehensive safety policies.

Ensure a profitable project.

PROJECTS COMPLETED:

COOYEESAN MALL, BAGUIO GENERAL HOSPITAL, GOMEZ COMMERCIAL BUILDING

DECEMBER 1998 - DECEMBER 2002 ALPA-PCM INC. PHILIPPINES

MECHANICAL ENGINEER

DUTIES & RESPONSIBILITIES:

Manage & Coordinate design or shop drawing preparations for M&E services and liaise for consultant approval.

Prepares & submit for approval of materials catalogue & technical specifications from consultant.

Establish a comprehensive Procurement Plan and secure for PO.

Provide & monitor a delivery plan of procured equipment & Materials on site with proper warehouse management.

Establish & prepare a detailed & organized construction plan to be implemented at site.

Monitor construction progress and establish mitigation plans whenever required.

Maintenance supervision on existing buildings, resorts & memorial parks.

Repair and perform Preventive Maintenance on all tools, equipments & machine

Scheduling of vehicular trip and operation.

Monitoring of Fuel consumption and do maintenance costs analysis.

Management of technicians, mechanics, drivers and heavy equipment operator.

PROJECTS COMPLETED:

FRESH SEA WIND RESORT, HEAVENS MEMORIAL GARDEN, MTCB 5-STOREY COMMERCIAL BUILDING

EDUCATION

OCTOBER 1998 LICENSED MECHANICAL ENGINEER

By Philippines? Professional Regulation Commission

MARCH 1998 GRADUATE OF BS MECHANICAL ENGINEERING

SAINT LOUIS UNIVERSITY, PHILIPPINES

CERTIFICATIONS:

PROJECT MANAGEMENT PROFESSIONAL TRAINING

MADRAS MANAGEMENT INSTITUTE-QATAR

ACCREDITED TRAINING CENTER FOR PMI-USA

(PROJECT MANAGEMENT INSTITUTE-PMBOK GUIDE)

JANUARY- FEBRUARY ?10

LEED(Sustainability on Buildings)

MADRAS MANAGEMENT INSTITUTE-QATAR

ACCREDITED TRAINING CENTER OF USGBC

APRIL 2010

OP-ISC-OIL & PETRO CHEMICAL

ABSOLUTE KINETICS CONSULTANCY PTE.LTD.

19-03-2013 TO 22-03-2013

BUILDING CONSTRUCTION SUPERVISORY SAFETY COURSE

SCAL- Singapore Contractors Association Ltd

01-10-11 TO 22-10-11

WORK AT HEIGHT

ASRETEC-Trainings & Education Center

26-04-13

CONSTRUCTION SAFETY COURSE FOR PROJECT MANAGERS

SCAL- Singapore Contractors Association Ltd

2-05-13 TO 15-05-13

ENHANCEMENT ON PRODUCTIVITY MANAGEMENT

BCA ACADEMY

22-02-17

TECHNICAL TRAININGS & SEMINARS:

COOLING TOWERS, CHILLED WATER SYSTEM & AIR HANDLING UNITS

ASHRAE, AMERICAN SOCIETY OF HEATING, REFRIGERATION & AIR CONDITIONING

QATAR-ORYX CHAPTER

APRIL 10, 2010

HVAC HEAT LOAD CALCULATION & DESIGN

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS-QATAR CHAPTER

NOVEMBER 22, 2009

SEMINAR ON NFPA 13, DESIGN & INSTALLATION OF AUTOMATIC SPRINKLER SYSTEM

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS

AUGUST 12, 2009

ADVANCED FIRE PROTECTION SYSTEM DESIGN

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS-QATAR CHAPTER

AUGUST 12, 2009

SCADA-SUPERVISORY CONTROL AND DATA ACQUISITION

THE INSTITUTION OF ENGINEERS(QATAR CHAPTER)

APRIL 30, 2010

DUCT DESIGN- FRICTION LOSS METHOD( SOFTWARE APPLICATIONS)

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS-QATAR CHAPTER

SEPTEMBER 27, 2010

CYME 5.02 POWER ENGINEERING SOLUTIONS/ COOPER POWER SYSTEM

CYME INTERNATIONAL T&D

OCTOBER 17,2010

INTERNAL AUDIT COURSE, I.S.O.9001:2008

VINCOTTE INTERNATIONAL MIDDLE EAST LLC

JANUARY 30-31,2011

TRAINING COURSE ON ?INSTALLATION & TROUBLE SHOOTING? & FACTORY VISIT FOR

?CONSUMER PRODUCTS & APPLIED UNITS ZAMIL AIR CONDITIONERS?

ZAMIL, DAMMAM KSA

FEBRUARY 12-16, 2011

PLUMBING SYSTEM DESIGN(ENGINEERED APPROACH)

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS(QATAR ORYX CHAPTER)

MARCH 25,2011-05-15

TRIPPLE BOTTOMLINE OF ECO-BUILDINGS

INSTITUTION OF ENGINEERS INDIA & QATAR SOCIETY OF ENGINEERS

MAY 11,2011

DESIGN, INSTALLATION, OPERATION & MAINTENANCE OF LDC & LPCO2 SYSTEMS

TYCO SINGAPORE

October 14-17, 2014

WEBINAR: ADVANCED TECHNOLOGIES IN CLEAN AGENT, FM200 SYSTEMS

AMERICAN FIRE SPRINKLER ASSOCIATION

November 03, 2014.

FUNTAMENTALS OF BIM MODELING

PSME- 69th CHAPTER SINGAPORE

February 06, 2016

DESIGN, INSTALLATION & MAINTENANCE OF BOILER SYSTEM

PSME- 69th CHAPTER SINGAPORE

June 08, 2016

TV-VALVES (CHILLED WATER BALANCING)

PSME- 69th CHAPTER SINGAPORE

August 06, 2016.

MEMBERSHIP/AFFILIATIONS:

ASHRAE, AMERICAN SOCIETY OF HEATING, REFRIGERATION & AIR CONDITIONING

QATAR-ORYX CHAPTER

THE INSTITUTION OF ENGINEERS

QATAR CHAPTER

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS

QATAR CHAPTER

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS

SINGAPORE 69th CHAPTER

PERSONAL INFORMATION

AGE:42 STATUS: MARRIED NATIONALITY: FILIPINO



Contact this candidate