ENG’R FEDERICO D. DECHIMO

PRC License Reg. No. **21946

March 1982

APPLYING FOR: SR MECHANICAL ENGR

PERSONAL DATA

Address : Purok Riverside Barangay Montevista, Block 13, Bacolod city Negros Occidental, Philippines

Telephone : 00-633*-******* (Phil.) Mobile: +966********* (KSA)

+966******** (KSA)

Date of Birth : September17,1951

Place of Birth : Cadiz City, Negros Occidental Philippines Driver’s License No : 209-***-****

Civil Status : Married

Name of Spouse : Nenita P. Dechimo

Occupation : Site Manager

School Graduated : West Negros University

Bachelor of Science in Mechanical Engineering

E-mail Address : aczw7q@r.postjobfree.com

PROFESSIONAL LISCENSE # 0021946

PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS - ID # 88130 SAUDI COUNCIL OF ENGINEERS –SCE ID # 113593

Seminars Attended:

1. First Aid Training - Bureau of Mines and GEO- Sciences 2. DE – Mag Overhead Crane - Atlas Consolidated Mining and Development Corporation

3. Symons Cone Crusher - Rexnord – Nordberg Machinery Process Machinery Division

4. Giving on the Job – Training - Atlas Consolidated Mining and Development Corporation

5. Engineered Plumbing Design - Philippines Society of Mechanical Engineers,

(Central Riyadh Saudi Arabia)

6. Heavy Ventilation Air conditioning- PSME – CRSA, White Palace Hotel 7. Building Maintenance Service (BMS) PSME – CRSA, White Palace Hotel 8. Project Management Professional - PSME – CRSA, White Palace Hotel 9. Member of Philippines Society of Mechanical Engineers – M- 88130 Area of Specialization:

1. General Construction - Field Operation/Constructions and Control Test and Commissioning

2. Industrial Plant - Operation and Maintenance

3. Project Management - Planning and Scheduling Cost Control & Contract Administration, Project Tendering

Career Objective:

To be a self-motivated leader with the ability to adapt rapidly changing technologies

& environments with a strong desire to undertake challenging jobs & to work with the team to achieve the goal of an organization. Seeking for a challenging position in the field of Mechanical Engineering or related field

My Strength:

Fast Learner Of New Technologies

Confident in presenting Ideas

Professional Attitude

Router between the Management, colleagues and subordinate’s

Faithful and Honest to Job.

EMPLOYMENT HISTORY

1 Jan. 2015 to present : Al Adhary Interl. Group of Co – Sr. Mechanical Engr P. o. Box 7278 Riyadh 11462

Kingdom of Saudi Arabia

1. Nov 2012 to Jan. 2015 : Gustav Epple Arabia Ltd. - Site Manager P.O. box 3875, Riyadh 11481

Kingdom of Saudi Arabia

2. Dec 2006 to Nov. 2012 : Gustav Epple Arabia Ltd. – Site Manager P.O box 3875, Riyadh 11481

Kingdom of Saudi Arabia

3. Sept 1993 to Dec 2006 : Saudi Company Oprtn & Maint. - Site Manager Kingdom of Saudi Arabia

4. Dec 1990 to July 1993 : Al – Manee for Construction & - Project Engineer Development, Riyadh 11521

Kingdom of Saudi Arabia

5. Mar. 1987 To Nov. 1990 : Ministry of Town and Rural - Mechanical Engineer Affair, Municipality of North

Dhuba, K. S. A

6. June 1980 to Feb. 1986 : Atlast Conslidated Mining & Dev. Corportation, Lutopan

Cebu, Philippines - Mechanical Engineer

WORK EXPERIENCE

A) Jan. 2015 – Up to present.

Employer : AL ADHARY INTERNATION GROUP OF COMPANY

P. O. Box 7278 Riyadh 11462

Kingdom of Saudi Arabia

Title : Sr. Mechanical Engineer

Project Involve : Project Cost – Sr. 130 Million

Client : Ministry Of Housing – Al Shagal Project – Rabigh Project Detail : It is a Housing project with 223 villa, Parkings, WTP, STP, Deep well system and External underground laying piping Storm drainage (GRP), Sanitary Sewer (VCP), Soakaway well, Potable water line & Irrigation System (HDPE). Building HVAC System.

Responsibilities and Duties:

1) To reply RFI in lieu with design issues to facilitate site progress. 2) Review and work on technical aspect of material & Drawing Submittal/Equipment Selection and approve in conjunction with the project specification and Building operator’s requirement for HVAC, Firefighting, Water supply and drainage systems. 3) Preparation of Mechanical Shop drawing for submission and approval of consultant prior for the installation.

4) Preparation / Submission of Method statement for approval of the consultant. Such as: 1) Materials Manual Handling, 2) Storage & ShifitingMaterials,3) Sewer drainages 4) storm drainage 5) Potable Water Supply6) Fire Fighting 7) WBRO Equipt Installation, 8) STP Equipt. Installation 9) HVAC Const. Work 10) Lifting External & Internal Plumbing Const.

5) Reviews materials and equipment to ensure that they are in accordance with the specification of installations are maintained throughout the project period. 6) Coordinate with the Head of Department/Design Staff and obtain their comment prior to action

7) Reviews materials & Shop drawing to ensure that they are in accordance with the and that they are coordinated where applicable, receive feedback from the Site Engineer/Inspector or design office and incorporate their comments. 8) To assure safety of the work condition and always check if crew are properly wearing their individual safety gadgets and equipment.

9) QA/QC

* Review/Perform all daily inspection & test of the scope and character necessary to achieve the quality of construction required in the approved drawing & Specification for all works under the contract on site.

Cary out inspection & checking for all quality related procedures in the site

& ensures activity at site are as per approved method statement & inspection plan.

Coordinate with the consultant’s representative & Site-Encharge for inspection & meeting about quality problems, Including closure of Non- Compliance Report

Taking care of QA/QC documents of the entire project including certificates, test results, inspection request, Non-compliance reports, Site instruction/observation, permanent materials delivered & documents

Responsible in the quality and workmanship of every activities, thorough knowledge of all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multi-disciplinary operation.

Jobs Description

Supervises the work of relevant mechanical (HVAC/PL/FF) Contractors to quality and that constructions/installations are in accordance with drawings, specifications, QA & QC and local regulations. Act as a focal point to the Client and to the Head of Department.

A) Nov. 2012 – Sept. 2014

Employer : GUSTAVE EPPLE ARABIA LIMETED

P. O. Box 3875, Riyadh 11481, Kingdom of Saudi Arabia Title : Site Manager

Project Involve : Project Cost – Sr 72 Million

Client : UKADH SPORT CLUB, General Presidency Ministry of Youth Welfare.TA-IF, K.S.A.

Site Preparation and Mobilization to the project

As site Main contractor representative, Supervision of work activities of Sub contractor and see to it that the latest drawing approved will be use on site and coordinate to the Consultant prior for the site implementation.

As a Main contractor were responsible of the efficient organization and the management construction activities and the leadership of all sites operative.

All personnel on site were responsible of the site Manager. The site Manager should provide professional and confident representation of company@ all time.

Supervision of site preparation/ Excavation/Leveling and compaction for the soil density test. Submitted the result from the laboratory agency to the consultant for approval. Prior to layout /Establish level for the blinding of structural foundation.

Supervision of site preparation/ layout of structural foundation, columns, beams and others.

Supervision of sub contractor for the Electrical and Mechanical activities on site. To ensure that latest approved drawing will be use and coordinate to the consultant.

Supervision of Sub contractor in procurement of materials and delivery on site and make sure & base on the approved client specifications. Giving memorandum to sub contractor, If found discrepancy of delivery of materials.

Co-ordination of drawings: Architectural, Civil, Structural, Electrical and Mechanical drawing and Prepare shop drawing, for the approval of the consultant, prior for the implementation of works on site.

Prepare site works programs and plans, daily, weekly and monthly report and submit to the head office.

JOB DESCRIPTION

As Site Manager, Main Contractor was responsible for the proper construction and installation in accordance with supplier method and approved by the Ministry.

Prepare information and instruction to the subordinated, respectively regarding the incoming / outgoing correspondence decision, relied and others to / from the Consultant, Main Contractor Head office.

Supervise the Engineers in the field and preparation of materials, tools & equipment that are needed in the project.

Estimating the repaired quantity of materials for procurement purpose.

Oversee ongoing activities and ensure that only the latest approved drawing and materials are being followed.

Co-ordination of drawings: Architectural, Civil, Structural, Electrical and Mechanical drawing and Prepare shop drawing, for the approval of the consultant, prior for the implementation of works on site

See to it that all general obligations stipulated in the existing main contract agreement and specification and have executed the work to the full satisfaction of the Consultant.

To give proper instruction to site supervision for the utilization of man power as needed to meet the schedules in time.

To evaluate the work execution daily, weekly or monthly and the percentage of work accomplished.

To assure safety of the work condition and always check if crew are properly wearing their individual safety gadgets and equipment.

Test and Commissions

B) December 2008 to November 2011

Employer : GUSTAVE EPPLE ARABIA LIMETED

P. O. Box 3875, Riyadh 11481, Kingdom of Saudi Arabia Title : Site Manager

Project Involve : Project Cost - Sr 75 Million

Construction of two (2) Soccer football field with setting Arena around. Scoreboard, High mass with flood light 36 meter height. Installed Irrigation and drainage system.

Construction of Administration building Three (3) floors, Sport hall, Basketball, Tennis, Volley ball court and Sanitary facilities.

Construction of road & parking – 37,120 Sq.m Install Lift Station, Drainage system. Squash Court building and Air Conditioning system.

Preparation/Co-ordination of drawings: Architectural, Civil, Structural, Electrical and Mechanical drawing and Prepare shop drawing, for the approval of the consultant, prior for the implementation of works on site and to avoid delays.

Layout/Installation of Water supply, Drainage and Firefighting system of the building.

Construct Water treatment plant building, Installed Reverse Osmosis Equipment, with pumps and Acc.

Installed Centrifugal Liquid Chiller “Trane “with 300 tone cap., chilled water pumps -55 Kw cap. Chilled water pipe system supply

& return in the building and AHU & FCU, Split and window units and accessories

Construction of Evaporated tank 150.0 cu.m. Capacity. Installation of drainage pipe system and Irrigation system.

Test and Commissions

AL-KHALEEJ SPORT CLUB, General Presidency of Ministry of Youth Welfare, Dammam, Sayhat 31972, Eastern Province, K.S. A. JOB DESCRIPTION

As Site Manager, responsible for the proper construction and installation in accordance with supplier method and approved by the Ministry .

Installation of HVAC system Including Package units, Split And window Units

Installation of firefighting system, including fire hose rail, fire extinguishers and layout piping system

Oversee on going activities and ensure that only the latest approved drawing and materials are being followed.

See to it that all general obligations stipulated in the existing main contract agreement and specification and have executed the work to the full satisfaction of the Consultant.

To give proper instruction to site supervision for the utilization of man power as needed to meet the schedules in time.

To evaluate the work execution daily, weekly or monthly and the percentage of work accomplished.

Co-ordination of drawings: Architectural, Civil, Structural, Electrical and Mechanical drawing and Prepare shop drawing, for the approval of the consultant, prior for the implementation of works on site.

To assure safety of the work condition and always check if crew are properly wearing their individual safety gadgets and equipment.

Test and Commissions

C) September 12, 1993 to December 10, 2006

Employer : SAUDI COMPANY FOR OPERATION/MAINTENANCE & CONT. P. O. Box 4311, Riyadh 11491, Kingdom of Saudi Arabia Title : Site Manager

Project Involve : Project Cost – Sr 80 Millions

Construction of Sport Club of Youth Welfare:

Swimming Pool Complete facility, Installation of mechanical system and water supply line and drainage system. Sport hall building, Clubhouse with Complete Sanitary facility, Grandstand Building with sport room and sanitary facilities. Administration Building, Soccer football field -2 nos, with plant room and Installation / Layout of water supply and drainage system.

Co-ordination of drawings: Architectural, Civil, Structural, Electrical and Mechanical drawing and Prepare shop drawing, for the approval of the consultant, prior for the implementation of works on site and to avoid delays.

Construction of Water treatment plant building, with two (2)Fiber Glass " Amiantit " tank 32, 000 ltrs Cap. and buried @ ground,Protect with concrete walls

Installed Reverse Osmosis Equipment, with pumps, tank filters, four (4) stage fiber filter membrane.Manholes and Drainage system going to main drainage

Constructions of Athletics Events and training field and Irrigation system.

Test and Commissions.

Dammam Sport Club, General Presidency of Ministry of Youth welfare Dammam Khobar, Eastern province, K.S.A. JOB JOB DESCRIPTION

As Site Manager, responsible for the proper construction and installation in accordance with supplier method and approved by the Ministry.

Prepare information and instruction to the subordinated, respectively regarding the incoming / outgoing correspondence decision, relied and others to / from the Consultant, Main Contractor Head office.

Supervise the Engineers in the field and preparation of materials and Tools/equipment that are needed in the project.

Estimating the repaired quantity of materials for procurement purpose.

Oversee ongoing activities and ensure that only the latest approved drawing and materials are being followed.

See to it that all general obligations stipulated in the existing main contract agreement and specification and have executed the work to the full satisfaction of the Consultant.

To give proper instruction to site supervision for the utilization of man power as needed to meet the schedules in time.

To evaluate the work execution daily, weekly or monthly and the percentage of work accomplished.

To assure safety of the work condition and always check if crew are properly wearing their individual safety gadgets and equipment.

D) December 1990 – Sept. 1993

Employer : AL – MANEE CORPORATION AND

DEVELOPMENT, RIYADH 11293, KINGDOM OF

SAUDI ARABIA.

Title : Project Engineer

Project Involve :

1. Installation of Heavy Ventilations/ Air conditioning Equipment Four (4) Air cooled Centrifugal Liquid Chiller, Ducting System Test and Commission- ABB-ROCK Factory building. Riyadh, Kingdom of Saudi Arabia. Project cost – Sr 5 Millions

11. Installation of Three (3) Air cooled Package type air condition. Air Handling units, Ducting system, Swimming pool with water 250cu.m Capacity. Test and Commission Mr. Shiek Al Turki – Residence Riyadh, Kingdom of Saudi Arabia. Project cost – Sr 3 Millions 111. Main contractor Gustav Epple Arabia Ltd.-Project cost –Sr 35 Millions Construction/ Installation of Electro/ Mechanical Such as:

Air cooled Centrifugal Liquid Chillers - Four(4) nos. 300 tones each

Air cooled Centrifugal Liquid Chillers - One (1) nos. 150 tones

Air cooled Reciprocating Liquid Chillers - One (1) nos. 30 – 40 tones

Air Cooled Package air conditioning - Three (3) nos.

Air Handling Unit - Seven (7) nos

Fan Coil Units - Thirteen (13) nos.

Air Condition “ Window “ type - Seventeen (17) nos

Manholes/Drainage system and Water supply system in the building.

Fire Alarm and Hydrant system

Underground water tank pumps system

Lay-out of high and Low voltage cable from Sceco building to sub stations

Erection of High Mast and Lighting Poles

Al-Khaleej Sport Club, Sayhat 31972, Eastern province of Kingdom of Saudi Arabia.

JOB DESCRIPTION

As a Project Engineer, responsible for the proper construction and installation in accordance with the supplier method and approve by ministry.

To give proper instruction to the Engineers and for the supervision of the utilization of manpower needed and to meet schedule time.

To estimate the materials take off on the drawing and prepare material to be purchase and needed on site.

To react immediately if the problem occurs in the actual construction project.

To co-ordinate from time to time with the site Engineers & supervisors regarding project activities.

To be aware with the work. to be done and on – going as listed in the work schedule.

To evaluate the work executed daily, weekly, or monthly and the percentage of Work accomplish.

To forecast / estimate unpredictable eventualities in the execution of the project so that It could be included in the estimated time, manpower and materials.

To assure safety of work condition and always check if crew are properly

wearing their individual safety gadgets and equipment.

To refresh safety pre-caution before the start of work.

Test and Commissions

E) March 1986 to November 1990

Employer : MINISTRY OF TOWN AND RURAL

AFFAIR Municipality of North Dhuba,

Kingdom of Saudi Arabia

Title : Mechanical Engineer

Project Involve

Supervise the Electro/ Mechanical Works on site.

Co-ordinates with Consultant in work implementation

Represent the monthly ministry meeting in site.

Maintenance of Heavy Equipment, Diesel Engine and Gasoline Car.

Maintenance in charge of all the Mechanical in the plant, Such as Diesel Engines, Symons cone Crushers, Gyratory 54” Crusher, Fan feeder and Conveyors.

Prepare maintenance schedule of personnel and activities.

Check personnel attendance, Correspondence assignment and performance.

Prepare Purchase order and shop drawing of fabrication of spare parts

@ Machine shop.

Co-ordinate with the other department, division to achieve smooth maintenance in the plant.

Prepare monthly report and submit to the Department Head. F) June 1980 to February 1986

Employer : ATLAST CONSOLIDATED MINING AND DEVELOPMENT CORPORATION. Lutopan Cebu, Philippines.

Title : Mechanical Engineer

Project Involve

Supervise the Electro/ Mechanical Works on site.

Co-ordinates with Consultant in work implementation

Represent the monthly ministry meeting in site.

Maintenance of Heavy Equipment, Diesel Engine and Gasoline Car.

Maintenance in charge of all the Mechanical in the plant, Such as Diesel Engines, Symons cone Crushers, Gyratory 54” Crusher, Fan feeder and Conveyors.

Prepare maintenance schedule of personnel and activities.

Check personnel attendance, Correspondence assignment and performance.

Prepare Purchase order and shop drawing of fabrication of spare parts

@ Machine shop.

Co-ordinate with the other department, division to achieve smooth maintenance in the plant.

REFERENCES

1. Dr. Essam A. J. Alamdar

General Manager,

AL- TAIF COMPANYLTD.

P.O. Box 3181, Riyadh 11471

Kingdom of Saudi Arabia

2. Eng'r Mohammad Ismail Project

Director GUSTAVEPPLE ARABIALTD. P.

0. Box 3875

Riyadh 11481

3. Eng'r. Marwan Al Atab

Company Manager

SAUDI OPERATIONAND MAINTENANCE LTD.

P.O. Box 4311, Riyadh

11491

Kingdom of Saudi Arabia

I hereby certify that all the foregoing information is true and correct to the best of my knowledge and ability.