Post Job Free

Resume

Sign in

Piping Engineer

Location:
Mabini, CALABARZON, Philippines
Posted:
April 20, 2017

Contact this candidate

Resume:

FROILAN S. MANALO

Field Engineer (Mechanical/Piping)

Contact Information:

+63-915-***-**** (Mobile)

aczv87@r.postjobfree.com

San Juan Mabini, Batangas

Philippines

Twelve years of solid and progressive experienced in the field of piping and detailed design and engineering for various oil and gas, petrochemical, shipbuilding and offshore projects. Duties and responsibilities includes preparing the piping route design based on plot plan and P&ID with accordance to piping codes and standards such as ASME, API and NORSOK; pipe support design based on standard supports set by the client; 2D piping and equipment layout, 3D piping modeling, 3D check piping route using PDMS, check isometric drawings to ensure that checklist is being followed; checking and preparation of material take off of all piping materials as per isometric drawing based on P&ID and annotation of GA and isometric drawings from 3D model. Conduct site survey, measurement, field collection and as-built information of existing piping systems.

Knowledgeable in using Autocad 2D/3D, PDMS (Plant Design Management System) Design, Spooler, Draft, IsoDraft, SP3D, AVEVA MARINE 3D, QMS, Naviswork, Cloudworx, Microstation V8i and Microsoft Office Applications.

Have an excellent communication and interpersonal skills. Recognizes inconsistencies in data and results. Strive to overcome obstacles and is creative in providing solutions. Ensure work is carried out with good quality and within the deadline. Self-directed in continuous learning and development.

PDMS (Plant Design Management System)

MDS (Multi Discipline Support)

In-House Training

SMOE Pte Ltd

(November 2008)

Naviswork

In-House Training

SMOE Pte Ltd

(November 2008)

AUTOCAD 2000 (2D/3D)

AMA Computer Colleges

Capitol site Hilltop, Batangas City

(May 2005)

Keppel Batangas Shipyard Inc (August 2016 – Present ) San Miguel Bauan, Batangas Philippines

Position: Field Engineer (Mechanical/Piping)

Department: Production – Mechanical/Piping Section SUMMARY OF EXPERIENCES AND SKILLS

WORK EXPERIENCES

TRAININGS

Project Involvement:

Hull 106 – Tug Boat

All Vessel - Ship Repair

Duties and Responsibilities:

Supervise installation, fabrication of mechanical and piping system.

Inspection of installation as per Piping and Instrumentation Diagram (P&ID).

Pre-commissioning witnessing (Flushing, Hydrostatic test and Air Leak test).

Inspection of raw materials of piping, fittings, flanges and Valve according to Design Standard, Codes, and Specification

Manage daily work schedule, material requirements and allocation of employees and sub- contractors as per project requirements.

Prepare Punch list and progress.

Ensure that safety requirements are observed and complied to.

Ensure have permit to work ( Cold work and Hot work)

Ensure all the activities are performed as per approved RA (Risk assestment).

Coordinate with QC for all the related inspection and NDT requirement.

Coordinates with other departments to resolve technical issues and delay.

Attend production meetings to highlight issues for resolution and update clients on work progress.

Work with design team to ensure proper execution of construction for all piping system.

Prepare health, safety and risk information where applicable to work practices and toolbox.

J & S Consultancy (seconded to CHIYODA PHILIPPINES CORP.) (Feb 2016 – Aug 2016) Mandaluyong City, Philippines

Position: Piping Designer

Department: Engineering - Piping Section

Project Involvement:

CBI ZACHRY JOINT VENTURE – FREEPORT LNG LIQUEFACTION PROJECT (HOUSTON) Duties and Responsibilities:

Check and review works such as piping layout, access & escape route, engineering information, material take off, and construction drawing deliverables of the project for compliance to project standards or specifications, contract requirements, quality standards and accepted engineering and construction practices.

Clash check and Data consistency of 3D Model.

Checking of pre and final isometric drawing in Pipe rack area.

Checking of pre and final isometric drawing in utilities.

Isometric sketch of piping for PDS Operator.

Checking lines are routed in accordance with stress analysis result.

Consistency check of piping layout as per P&ID.

Daewoo Shipbuilding &bMarine Engineering (Under NESGLOBAL KOREA) (Dec 2014 – Dec 2015) Ocean Plaza Building

Geoje-si, South Korea

Position: Field Piping Engineer

Department: Engineering & Construction - Piping Section Project Involvement:

STATOIL – GINA KROG PLATFORM EPCH

Duties and Responsibilities:

Check and review works such as piping layout, access & escape route, engineering information, material take off, and construction drawing deliverables of the project for compliance to project standards or specifications, contract requirements, quality standards and accepted engineering and construction practices.

Responsible for supervision of fabrication and installation of piping items as per drawing and client specifications.

Review Working Environment comments and provide possible solution and coordinate to Statoil WE Technical person.

Follow up and ensure that all working environment requirements are fulfilled.

Assist Contractor with discipline field engineering / construction details upon request or as required.

Site Check to verify for piping routing, tie-in location and Equipment location.

Review selected drawings and documents issued by EPC Contractor.

Interface with piping discipline at EPC Contractor.

Report deviations and highlight problem areas to Construction supervisor.

Coordinate with QC for the related inspection and requirements.

Issue piping isometric drawings showing field weld locations for construction.

Provide Material Take-off (MTO) for availability of material and planning for the project.

Responsible to identify and record piping items used accordance with isometric drawings and P&ID.

Assist Piping Supervisor.

Carry out daily reporting and monitoring at site progress to achieve planned schedule.

Reports to Piping Supervisor for daily progress.

Attend daily tool box meeting.

Chicago Bridge & Iron Singapore (March 2012 – Oct 2014) International Business Park Singapore

Position: Piping Designer

Department: Piping

Project Involvement:

STATOIL – AASTA HANSTEEN TOPSIDE EPC

STATOIL – MARINER PROJECT TOPSIDE EPC

MODEC - PETROBRAS FPSO Cidade de Itaguai MV26 (Topside Module)

MODEC - PETROBRAS FPSO Cidade de Mangaratiba MV24 (Topside Module) Duties and Responsibilities:

Layout of piping systems using PDMS in accordance to Piping and Instrumentation Diagrams (PI&D), Process Flow Diagrams (PFD), Equipment Vendor drawings, project standards and specifications considering safety, operability, economical and constructability.

Squad check based on the latest Vendor Data and make sure Piping Comments are submitted to the Mechanical & Static Engineers for them to incorporate changes before submission to Vendors.

Clash check and Data consistency check of 3D Model and report progress to the project piping supervisor.

Update and Markup P&ID as per latest PDMS Model and geographical order.

Revise design isometric using PDMS Draft.

Participated in Preparation of Equipment Layouts, Emergency Escape & Safety Layouts, Fire Fighting Equipment Layouts, Maintenance Access Plan.

Incorporate changes in the project and MOC package. Dovre Group (Dec 2011 – March 2012)

(Seconded to SMOE Pte Ltd)

Admiralty road west Singapore

Position: PDMS Piping Designer

Department: Piping

Project Involvement:

CONOCOPHILLIPS - EKOFISK GEA 2/4L PLATFORM.

Duties and Responsibilities:

Check and review works such as piping layout, access & escape route, engineering information, material take off, and construction drawing deliverables of the project for compliance to project standards or specifications, contract requirements, quality standards and accepted engineering and construction practices.

Clash check and Data consistency of 3D Model.

Issue quality IFC piping isometric drawings showing field weld and necessary details for construction.

Site Check to verify for piping routing, tie-in location and Equipment location. Aibel Pte Ltd (January 2011 – December 2011)

Science Park I Singapore

Position: Senior Piping Designer

Department: Engineering-Piping Section

Project Involvement:

Statoil V&M - Oseberg C - Upgrading of Fire Water System (Modification)

Statoil V&M - Statjford B - Dropped of Object – Drain Line (Modification) Duties and Responsibilities:

Piping Layout activities with the use of plot plans, Piping & Instrument Diagrams, equipment data sheets in accordance with instructions, specifications, and standards using PDMS.

Checking Clashes, Obstructions, Operatability and Access by comparing 3D model of PDMS, Truview, Cloudworx and Mercad Reference.

Conduct Pipe route study and Piping Modeling through the use of PDMS.

Check the Piping Service Classes if it conforms to the Project Specifications and standards.

Responsible for piping 3D modeling for piping and equipment using PDMS software.

Responsible for Piping IFC isometric production.

Prepared equipment information such as nozzle orientation, equipment platforms and vessel clip for mechanical department.

SMOE (Sembawang Marine & Offshore Engineering) Pte Ltd (Sept. 2008 – Dec 2010) Admiralty road west Singapore

Position: Piping Designer

Department: Piping Section

Project Involvement:

MAERSK OIL OG GAS AS-HALFDAN PLATFORM FACILITIES.

CARIGALI-PTTEPI PLATFORMS.

Duties and Responsibilities:

Perform PDMS 3D modeling for detailed piping route design, equipments as per project specifications, standard drawings, design instructions, plot plan, flow diagram and supplier information.

Incorporate and revised drawing as per actual and mark-up as-built using PDMS and AutoCAD.

Provide Material Take-off (MTO)

Extraction of piping weight and CoG in PDMS.

Issue quality IFC piping isometric drawings showing field weld and necessary details for construction using PDMS Spooler.

Clash check and Data consistency of 3D Model and report progress to the project piping supervisor.

Update PDMS 3D model based on as-built drawing.

Site Check to verify for piping routing, tie-in location and Equipment location. KNM Process System Sdn Bhd. (Jan 2008 – August 2008) Selangor, Malaysia

Position: Field Piping Engineer

Department: Fabrication

Under: Azdaman Engineering Sdn. Bhd.

Project Involvement:

MISSION II-250,000 TPA BIODIESEL & 27,308 GLYCERINE PRODUCTION PLANT Duties and Responsibilities:

Responsible for supervision of fabrication and installation of piping items as per drawing and client specification.

Site Check to verify for piping routing, tie-in location and Equipment location.

Detailed checking of piping layout (elevation and dimensional accuracy) as per standards, specifications and project requirements.

Coordinate with QC for the related inspection and requirements.

Attend daily tool box meeting.

Responsible to identify and record piping items used accordance with isometric drawings and P&ID.

Carry out daily reporting and monitoring at site progress to achieve planned schedule.

Reports to Piping Supervisor for daily progress. KEPPEL BATANGAS SHIPYARD INC. (June 2006 – Dec 2007) San Miguel Bauan, Batangas, Philippines

Position: Field Engineer

Department: Fabrication Department

Project Involvement:

B289 & B290 (ENSCO 001 and 002 Semi-Submersible Drilling Oil Rig)

And OBO Chief -Mini Bulk Carrier (Conversion to Double Hull Oil Tanker) Duties and Responsibilities:

Responsible for supervision of fabrication and installation of piping items as per drawing and client specification.

Site Check to verify for piping routing, tie-in location and Equipment location.

Coordinate with QC for the related inspection and requirements.

Issue piping isometric drawings showing field weld locations for construction.

Provide Material Take-off (MTO) for availability of material and planning for the project.

Attend daily tool box meeting.

Responsible to identify and record piping items used accordance with isometric drawings and P&ID.

Assist Piping Supervisor.

Carry out daily reporting and monitoring at site progress to achieve planned schedule.

Reports to Piping Supervisor for daily progress. BABCOCK HITACHI PHILIPPINES INC. (Apr 2005 - Mar 2006) San Roque, Bauan, Batangas, Philippines

Position: CAD Designer

Department: Boiler-Piping Fab Section

Project Involvement:

APECO-ISK Project and SHI-DOP Project– fabrication of 1 set BM Boiler. Duties and Responsibilities:

Prepare detailed piping isometric drawing based on company standard, P&ID and G.A. drawing.

Prepares Material Withdrawal Table and Material Take-off (MTO) for the fabrication.

Issue quality IFC piping isometric drawings showing field weld locations.

Prepared Welding Schedule Sheet.

3D modeling using AutoCAD.

Degree in Bachelor of Science in Mechanical Engineering Technological Institute of the Philippines (2004)

Quiapo, Manila, Philippines

Nickname : Roi, Froi Civil Status : Married

Birthday : 05 Oct 1981 Nationality : Filipino

This is to certify that all the information disclosed in this resume is true and correct to the best of my knowledge.

Froilan S. Manalo

ELIGIBILITY

PERSONAL INFORMATION



Contact this candidate