RESUME
Manish M Lakhekar S/o: M G Lakhekar, plot no 35, bajrang
Mob: 989******* society, Nagpur 440006
Email: **********@*****.*** Contact: +91-774*******
MECHANICAL ENGINEER ( Project Piping )
Seeking a challenging and rewarding opportunity with an organization of repute, which recognizes and utilizes my true potential while nurturing my analytical and technical skills
SUMMARY OF SKILLS
Accented with the latest trends and techniques of the field. Have an inborn quantitative aptitude & aspire to carve a niche for myself in the in the field of Mechanical Project & Drawing (Auto-Cad).
Enriched with the ability to learn new concepts & technology within a short span of time.
Self motivated, hard working & goal-oriented with a high degree of flexibility, creativity, resourcefulness, commitment and optimism.
Outstanding communication skills, verbal as well as written coupled with exceptional presentation skills with the ability to perform above expectations.
Total Year of experience: 07 + Years
Position: Project Engineer Mech (Piping) and Drafting (Auto-Cad).
INDUSTRIAL EXPLOSURE
1)Since April’ 9th at Bhansali Polymer Engineering Ltd in its Satnoor plant (Sausar,Chindwara) as a
Project & Drawing Engineer.
2)From May’2010 to March’ 2014 at Dfwenvirotech I Pvt. Ltd, Nagpur Plant as a Project Mechanical Engineer.
3)From Sept ’2009 to April ’2010 at ABL engineering pvt Ltd in its Butibori Plant as Mechanical Engineer.
4)From Aug ’2007 to June ’2009 at Amitasha Enterprises pvt Ltd in its MIDC Nagpur Plant as
Trainee Mechanical Engineer.
JOB PROFILE:
Basic monitoring of day-to-day project activity at site & maintaining daily log book for the same.
Making Drawing in AUTO-CAD as per planning and Site Verification, P & IDs Piping Layout, Plan, Detailing, Layout Plan Etc.
Preparation of bill of materials of project, microplaning FQP.
Cost estimation of the project.
Project monitoring & reviewing all document drawings.
Execution and successful commissioning of the project.
Assurance/checking of work as per the drawings.
Witnessing the alignment of static & rotary equipments.
Hydro and pneumatic testing of Tanks, pipe lines & Valves as per IS Standard.
Impart Training to Staff & Technicians for SOP.
Prepare monthly management performance report.
Detailed Knowledge of Problem solving tools (For repetitive problems) such as why-
why analysis, cause & effect diagram etc.
Plant Manufacturing Maintenance like Daily Work Management (DWM), Behavior Based Safety Management (BBS), and Quality Circle Management etc.
Condition monitoring of Equipment and machinery by Vibration, shock pulse, thickness, and sound level measurements.
Spare parts management: Thorough experience of specification preparation, Procurement and maintaining mechanical spare parts of the total section.
Daily job planning that Erection work to be carried out as per time schedule.
Development of New Vendors / Parties for imported spares.
Inventory management.
Team leadership, Manpower handling.
Continual Improvement
Abnormality maintenance in the plant and Preventive maintenance.
Awards & Recognition
Awarded with Excellence Project Planning and commissioning in DFWEnvirotech I. Pvt.Ltd. Nagpur,
Training Attended
Project management and planning seminar.
Auto-Cad Drafting and design.
SAP, MS- office, Excel.
EDUCATIONAL CREDENTIALS
Diploma in Engineering (MECHANICAL) from Datta Maghe Polytechnic Nagpur with 55.31% in 2008.
S.S.C from Gandhi Vidhyalaya, Nagpur Board.
H.S.C. From J.M.Patel collage, Bhandara.
Projects Undertaken
Title
BEPL: San –II plant expansion at ‘Abu-road Unit’. 9 months
Synopsis
This project had main motive is to improve goods capacity than existing. There where used hot oil for maintain temp Instead of steam. Erection of piping, pumps and D.O. was successfully done. Commissioning also done in time period As per FQP, planning and IS standard. With the help of seniors, ED-T, contractor and sub-contractor.
Title
BEPL: Boiler Chimney and FV-0001/2 Duct Modification at ‘Satnoor Unit’. 4 months
Synopsis
This is for new chimney project, height 32mtrs and existing vessels to improve goods capacity,
Erection Done by vendor and commissioning done by BEPL as per IS standerd. As per FQP and
Planning. With the help of seniors, ED-T, contractor and sub-contractor.
Title
DFW: Expansion of Satpura Thermal power Plant MPPGCL. 1.7 yrs
Synopsis
This is piping Erection project like, DW, SW, PW, DM, Atomized Sprinkles for dust suppression system, This project was done along with my team members. As per FQP, Planning. Erection Done by DFW and commissioning done by MBE (MPPGCL). As per FQP, planning and IS Standard. With the help of seniors, ED-T, contractor and sub-contractor.
Title
DFW: Dust Suppression at Kota Thermal Power Plant Rajasthan. RVVUNL. 1.2 yrs
Synopsis
This is piping Erection project, Atomized Sprinkles for dust suppression system, This project was done along with my team members. As per FQP, Planning and IS Standard. Erection Done by DFW and commissioning done by (RVVUNL). As per FQP and planning. With the help of seniors, ED-T and contractor.
Title
DFW: Dust Suppression at Altratech cement plant Gulbarga, Hyderabad. 9 yrs
Synopsis
This is piping Erection project, Atomized Sprinkles for dust suppression System, This project was done along with my team members. As per FQP, Planning and IS Standard. Erection Done by DFW and commissioning done by (RVVUNL). As per FQP and planning. With the help of seniors, ED-T and contractor.
Title
Amitasha: Tower Erection/Assembling At plant Nagpur.
Synopsis
This is Structural Erection project, as per planning and drawings with the help of seniors, suggestion we made this erection as a Engineer. As per FQP, Planning and IS Standard and This project was done along with my team members.
Date of Birth: 5th Feb 1982.
Languages Known: English, Hindi and Marathi
Hobbies: Playing & Watching Cricket & Volleyball
PLACE:
DATE: (Manish M Lakhekar)