More than 5 years of experience as Piping stress engineer in refineries, chemical and petrochemical industries. Working asPIPING STRESS ENGINEER for past 5 Years. Involved in Stress Analysis of Piping using CAESAR II. Knowledge of stress/supporting of lines connected to Pressure Vessels, Towers, Pumps,Exchanger(Plate Type, Tube /Shell), Airfin Cooler.
Software Used : Caesar II 2014,2013, Auto Desk Navisworks, AutoCAD, Nozzle Pro
Experiance Details
I)Dodsal Engineering and construction, UAE
Kuwait Oil Company : Effluent water treatment and injection plant ( EWTIP) Project (EF/1761)
Nature of Work :-
-Handled stress analysis of critical lines connected to Tanks, Pumps and RTRP Lines, Pig launcher and Underground piping. Also Pipeline analysis.
-Max Pipe size upto36”
-Caesar II Modelling and stress analysis of Reinforced Thermosetting Resin Pipe (RTRP) lines and RTRP tanks.
-IFC Documentation
Kuwait Oil Company : NEW GATHERING CENTRE, GC-31
IN NORTH KUWAIT CONTRACT NO. 14050474
-Reanalysis of Piping connected to pump and tank, Technical Comment discussion with PMS on Comments, PMC comments incorporation and IFC documentation.
-Achievements : Removed 6 Springs on Tank systems.
Date Of joining: 22 Oct 2016 to Till Now
II)Jacobs Engineering India Pvt. Ltd. : - Design Engineer-Piping Stress.
Exxon Mobil Projects, USA.
Nature of Work :- Work share with Baton Rouge, Beaumont
1)Handled stress analysis of critical lines connected to Tanks, Pumps, Exchangers, Condensate Pot, Drier,Pumps,Air Fin cooler, Plate type heat exchanger, Stack type of Heat Exchanger,Lines Connected to PSVs PRVs ETC
2)Flange Leakage By NC Method
3)Nozzle qualification by and Trunnion Check by Nozzle Pro (PRG 2015)
Project Handled:
1.Cold Flare Safety
2.EP Drier
3.Sulphur Recovery Unit
4.Crude Oil Flexibility
5.Slagen Residue
6. HCLA Snubber
7. Scan Finer
8. CUA Flex
9.RHLA-1 Expansion
10. CHRF (CHALMETTE REFINING) ULSM PROJECT
11.KDLA ( Degassing Tank)
Client : Flint Hills Resources ( Pine Bend Refinery, Minnesota, Texas)
(Workshare with Houston Office & H&G House, Belapur)
Project : Sour water Systems, Pine Bend Refinery
Location: Pine Bend
-Workshare with Houston Office
-Handled stress analysis of 90(Level-1 Lines) critical lines connected to multiple pumps and sour water skimmers and Tanks.
-Squad check for IFC Isometrics.
Project : PH3- PAC Propylene Project Ph3, Port Arthur Refinery
Location: Port Arthur
-Piping stress analysis of 70 (Level-1) Stress critical lines
-Column, Pumps, Propylene Polishing Beds(Vertical vessels), Sulphur removal beds(vertical vessles)
-Analysed High Temperature upto 650F.
Project : PH3- Diesel Selectivity, Pine Bend Refinery
-Stress analysis Of Nearly 100(Level-1) stress critical Lines.
-Analysed Top suction-Top Discharge pump of 650F Pumps, Columns, Rack lines, Heat exchanger Air Fin Cooler.
-Critical stress analysis because of space constraint.
Project : PH3- ATS (Ammonium Thiosulfate),Pine Bend Refinery
-Piping Stress analysis Of 100 stress critical lines
-Critical because of space constraint
-Pumps, Vessles, Vent-scrubber, Heater, Air cooler
-Analysis of 30” dia lines with 650F temperature line connected to heater
Project: GHCL 4Th stream Expansion
Client: GHCL
Location: Sutarpada, Gujrat, India
-Worked on FRP and GRP Piping.
-Caesar II Modelling of FRP Piping and Stress analysis of 30 packages.
DATE OF JOINING: 27TH August,2014
DATE OF LEAVING: 19Th Of October,2014
III)COMPANY NAME : UHDE INDIA PVT LTD
1)Project Name : Oroscom UREA, USA.
Working Responsibilities:
Total Systems : 110
- Reanalysis Of Piping Connected to Pump, Exchangers, Columns, Tanks, Etc
-Caesar II Modelling.
-Nozzel Load Qualification.
-Released For construction Documentation.
-ASMEB SEC VIII FLANGE LEAKAGE DETAILING
2)Project Name : Donaldson Ville Ammonia, (NON COMPRESOR AREA), CFI industries Project, USA
-CAESAR II Inputing.
-PE Documentation.
-Detailing of special supports, Drawing of springs or hanger by licard
-Flange Detailing As per ASME B SEC VIII.
-Nozzle Load calculation.
DATE OF JOINING: 26th August, 2013
DATE OF LEAVING: 26Th Of August,2014
IV)COMPANY NAME: SISTECH CONSULATANT, BHANDUP MUMBAI
1) RIL JERP 3- MEG Pipe Stress Analysis For 300 Lines.
2) RIL Offsite and Utilities Pipe stress analysis for 200Lines.
3) Veg Oil Refinary Around 100critical lines.
4)IOTDE KARIMOON INDONESIA tankfarm piping stress analysis for 250Lines.
5) THERMAX Riser downcomer piping stress analysis for RIL Jamnagar
Responsibilities on Projects
- Piping Modelling in CAESARII for stress analysis
-Preliminary Static thermal Analysis
-Analysis Of Piping Connected to Pump, Exchangers, Columns, Tanks, Etc
-Preparation of Isometric from GA
- Pipe supporting Using review in NAVIS WORKS
-Identification of all load cases to be considered in analysis
-Pipe stress analysis Documentation
-Review Vendor data regarding nozzle loading
- Applicable codes ASME B31.3
-Calculation of Nozzle Load
DATE OF JOINING: 12th August,2011
DATE OF JOINING: 25th August,2013
Personal Profile
Date of Birth : 09-04-1989
Adress : R.no.16,secondfloor,RamjiSmruti,Madhukarnagar,
Near maruti mandir, thakurli, Dombivli(east).
Nationality : Indian
Religion : Hindu
Gender : Male
Marital status : Single
Languages Known :English, Hindi and Marathi.
Passport Number :L 5741769
Academic Credentials
B.E. (Mechanical)
Sr. No.
Exam
Year
University/Board
Percentage %
1
B E (Mech)
Dec 2011
Mumbai
59.66
2
HSC
Feb 2006
Mumbai
75.50
3
SSC
Mar 2004
Mumbai
80.53