Over twenty years of engineering success with renowned companies in the Oil, gas and chemical industry. Work experience spans United States and abroad. Experience includes providing basic, FEED and detailed engineering services (EPC) in refining and Oil & Gas area. Areas of work involve Crude Distillation unit, cryogenic plant for air separation, Gas plant and water & wastewater treatment system. Responsibilities include heat and material balances, prepared Piping and Instrumentation Diagrams (P&IDs), Process Flow Diagrams (PFDs), Equipment Specification Datasheets, and Piping Isometric Drawings. Also experienced in hydraulics, instrument specifications, safety relief (based on API 520 & 521 standards) and control valves. Participated in the safety and environmental and process hazard reviews. Possess strong interpersonal, leadership and computer skills. Thrive in team-oriented environment.

OBJECTIVE

Career objective is to lead the project as process lead in Oil & Gas and chemical industries. Manage the project and meet the project goal within specified time frame and allocated budget.

PROFESSIONAL EXPERIENCE

CB&I, Houston, TX Sep 2014 – Nov 2015

Senior Process Engineer

Cameron LNG Project:

Worked as Responsible Engineer for Utilities.

Involved in developing, reviewing and providing input to P&IDs and LDTs Line Designation Tables to the utilities area for FEED through IFC.

Participated in 30% and 50% plant model review for the Utility system. Reviewed the plant model against the P&IDs for conformance throughout the development of the model.

Handled and worked with Process Flow Diagrams (PFDs), Heat & Material Balance (H&MB), Piping Isometric Drawings, Equipment Data sheets.

Prepared Process descriptions and utility summaries.

Reviewed vendor prints for various equipment and provided comments.

Participated Line-by-Line P&ID’s reviews and Hazop meetings involving client & other internal disciplines and Incorporated all the comments received during HAZOP.

Performed and supervised hydraulic calculations comprising calculations related to the sizing and design of piping, pumps and prepared datasheets.

Provided sizing data for control valve, flow element, and other in-line instrument to the control system discipline engineers.

Assisted and contributed my endeavor to the young engineers as and when required.

Contributed my effort to the team and given complete support for successful completion of the project in a timely fashion.

Continually demonstrated sustained commitment to CB&I’s “Zero Accident” policy.

Bechtel Oil, Gas & Chemicals, Inc., Houston, TX 2010 – 2014

Senior Project Engineer

EWS (Escondida Water Supply) Pipeline Project:

Worked as Lead Engineer for EWS Pipeline Project.

Involved in developing, reviewing and providing input to Piping & Instrumentation Diagrams

(P&IDs) and Line Designation Tables (LDTs) for FEED and Detailed engineering.

Reviewed vendor prints and provided comments.

Performed pump calculations, line sizing and reviewed data sheets. Interacted with client, various disciplines on design development issues for resolution.

Prepared MOC prior to issue P&IDs for design.

Participated in client reviews, HAZOP meetings and provided technical expertise to engineering team.

Sabine Pass LNG Project:

Worked as Responsible Engineer for Unit 34(Hot Oil System) and Unit 29 (Waste water treatment).

Design and developed P&ID’s for Hot Oil system for FEED and EPC phase.

Performed PSV load calculation for various scenarios causes over pressurization.

Prepared flare load summary.

Participated in 30% and 50% plant model review for the Hot oil and Flare system. Reviewed the plant model against the P&IDs for conformance throughout the development of the model.

Flare Knock out drum sizing.

Performed PSV inlet/Outlet lateral line sizing and sub-header sizing.

Hydraulic calculations including line sizing, control valve calculation, pump calculation, revision list, and prepared all other P&ID related work like DPDT, equipment data sheet, PSV datasheets and SP items datasheets.

Interacts with all other disciplines including control systems, process & piping in order to get the work done in a faster and efficient manner.

Attended all training sessions and seminars in order to get better prepared with new skills and knowledge that will be extremely helpful to one to be able contributing to work efficiency.

Put in best efforts to ensure that the projects met the deadline and maintained quality at the same time.

Gladstone LNG project:

Responsible Engineer for Unit 61 (Temp. facilities).

Prepared and developed P&ID’s, hydraulic calculations including line sizing, control valve calculation, pump calculation, revision list, redlining, and all other P&ID related work such as equipment / SP items datasheets.

Issued LDTs, DPDTs and UFDs along with P&IDS for Temporary facilities unit 61.

Linde Engineering, Tulsa, OK. 2007 – 2009

Senior Plant Engineer

Lead plant Engineer for Devon’s Cryogenics plant (CANA, Canadian County, OK).

Developed, reviewed and provided input to Piping & Instrumentation Diagrams (P&IDs), line list, line sizing, generating data sheets and related design/development work.

Developed Cause & Effect of the plant and participated in various meetings such as HAZOP review and Line-by-Line Review meetings that involved client and other internal disciplines.

Coordinated and interacted with client and other internal disciplines like the Process, the Plant Design & Piping, the Mechanical, and the Control Systems from time to time during the process of P&ID development and hydraulic calculations.

Reviewed vendor prints for various equipment.

Completed all projects in timely manner to client’s satisfaction.

Bechtel Oil, Gas & Chemicals, Inc., Houston, TX 2007 – 2007

Senior Process Engineer

Motiva Port Arthur Refinery:

Worked for 325,000 BPD Crude Distillation Unit which has been designed for Motiva Port Arthur Refinery as part of the Port Arthur Refinery Expansion project.

Prepared and Developed Piping & Instrumentation Diagrams (P&IDs), Line list and all associated activities for FEED and EPC phase.

Involved in developing Process Flow Diagrams (PFDs), Heat & Material Balance (H&MB), Piping Isometric Drawings, Equipment Data sheets.

Performed and hydraulic calculations comprising calculations related to the sizing and design of piping, pumps, control valves.

Worked with sizing calculations of relief valves and laterals.

All projects completed as per schedule, guidelines and specifications laid out by the client.

CB&I, Houston, TX May 2006 – Dec 2006

Process Engineer (Contract Position for 7 months)

Worked for 25 MMScfd Gas Plant for Chevron Texaco Cabinda Gas Plant-Angola.

Prepared Heat and Material balance, developed PFD’s and P&ID’s, Equipment sizing, Control valve sizing and Hydraulic calculations.

Performed preliminary flare sizing using Flarenet.

Prepared Flare load summary.

Sized PSV’s based on API 520 & 521 standards using in-house Excel program.

CDI Corporation, Houston, TX Jan 2006 – May 2006

Senior Process Engineer (Contract Position for 5 month)

Worked as a senior process engineer on the Silane manufacturing project.

Developed PFDs, P&IDs, the mass & energy balance, process simulations (Hysis, Aspen), and equipment data sheets.

Solved several lines over pressuring and flow limitation problems for Huntsman Conroe facility.

S & B Engineers and Constructors, Ltd, Houston, TX 2004 – 2005

Senior Process Engineer (Contract Position)

Worked as a senior process engineer on the Chlor_Alkyl (Chlorine and Caustic) project in revamping of Hydrogen processing unit for Dow Chemicals (Freeport plant).

Performed hydraulics using SiNet modeling program and equipment sizing for Hydrogen processing unit and new cooling water system.

Prepared mass & energy balances, developed PFD and Index flow sheet for Hydrogen processing unit and cooling water system.

Developed Equipment record form.

Genesis Engineering, Anaheim, CA 1998 – 2002

Process Design Engineer

Prepared heat and material balances, equipment specifications for water and wastewater treatment plants.

Developed P&IDs and LDTs.

Performed pumps and control valves calculations.

Review Vendor packages and equipment data sheets.

Performed qualitative analysis to estimate the environmental risk.

METITO Group of Companies, Jeddah, Saudi Arabia. 1990 – 1998

Technical Sales Engineer

Provided technical services and training to client’s engineers and operators in chemical selection, process parameter setting and control, dosage calculations for specific utilities requirement, chemical handling and safety procedures.

Performed successfully chemical treatment and cleaning of open & close loop of circulating water system and sterilization of domestic HWS/CWS.

Worked closely with sales department and the client to promote sales and for technical backup.

Developed engineering bid packages and proposals.

Performed plant installation and commissioning of water treatment plants.

Responsible for managing laboratory testing for the boiler feed water, cooling water, Chiller, drinking water and sewerage.

Bela Chemicals Industry. 1988 – 1990

Unit Engineer

Reviewed & implemented operating procedures and operator training related to assign units as well as newly implemented projects or major process changes.

Heavily involved in unit troubleshooting.

Prepared monthly mass-balance report.

Involved in daily routine for monitoring the process equipment reliability, ensuring production quality, reducing operating cost and improving operability of the unit.

Prepared and provided daily production reports to the production manager and worked closely with the operators and shift supervisors.

Heavily involved for maintaining steady state operation of the boilers, cooling system and demineralization plant.

Worked closely with operations during plant turnaround resulting in completion of all turnaround projects within the turnaround schedule.

EDUCATION

M. S., Chemical Engineering – Rowan University, Glassboro, New Jersey. GPA – 3.5/4.0

B. S., Chemical Engineering – Punjab University, Lahore, Pakistan. GPA – 3.7/4.0

TECHNICAL SKILLS

Aspen, Hysis, Computer Networking Certifications, including MCSE, MCP+I, MCP

and Microsoft Office 2000 applications.

OTHER ACHIEVEMENTS

Awarded scholarships during most academic years.

Awarded distinctions in most subjects at Punjab University.

Awarded company process engineer achievement award for completing major projects.

Registered member of Pakistan Engineering Council since 1988.



Contact this candidate