Purchasing Logistics Expeditor
Negotiation Performance and Budget Management Regulatory Compliance Cost Reduction
Product Development Strategic Planning Business Integration Resource Allocation
Qualifications Profile
Seasoned, performance-focused, and process-oriented professional with diverse background in operational management, international sales, succession planning and execution, and manufacturing; complemented with keen expertise in resolving suppliers’ concerns regarding quality, packing, conformity with standards, and timelines. Multifaceted and engaging leader with exceptional communication, analytical, and problem-solving skills. Equipped with strong interpersonal aptitudes in establishing positive relationships with diverse individuals utilizing bilingual fluency in English and Spanish.
Professional Experience
CONFIDENTIAL Seattle, WA (2012–Present)
Buyer 2017–Present
Hold responsibility in sourcing, quoting, and procuring materials from diverse range of new builds and warranty repairs for numerous vessels, including WSF144 Class MV Tokitae, Samish, Chimacum, and Suquamish
Manage the production, material, inventory, and purchase planning to effectively support master schedule
Take charge of the execution of replenishment orders and change according to material requirements planning (MRP), while maintaining product availability for production leads
Establish and maintain positive working relationships with suppliers, vendors, and internal customers, while adhering to corporate objectives and guidelines
Closely monitor the inventory discrepancy and perform corrective actions as required
Generate detailed and accurate Excel spreadsheets for quotes and orders of complex builds and system specific materials
Provide first-rate assistance to Accounting Department in processing receipts and invoicing details
Assume accountability in reading blueprints and schematic drawings to efficiently identify correct material for purchasing
Made major contributions in working with project vessels such as Harley Tug Dale R, Lindsey, Maxum Petroleum Barge, San Francisco Fire Boat the St. Francis, amounting to 11.8 million-dollar budget
Material Control Expeditor 2012–2017
Took charge of receiving pipe spool kit drawings and bill of materials (BOMs) from production planning to scrubbed spool configuration from the Engineering Department with production required date(s); along with evaluating BOM against current Vigor parts catalog to search for exiting parts numbers with IFS history and descriptions
Guaranteed 100% accuracy of BOM by thoroughly assessment of any inconsistencies and errors during production planning
Generated new IFS part numbers and purchase requisitions in IFS for spool kits to be delivered to a buyer
Administered all inbound manual purchase requisitions from US Fab requestors, while serving as purchase order expeditor for all pipe kit tracker log and key resource on discrepant pipe receipts from suppliers
Received and oversaw steel nest drawings for processing into purchase requisitions
Assumed responsibility in interfacing with pipe shop on needs, production schedule, and other input; as well as ensuring proper maintenance and administration of pipe kit tracker log
Led the overall engineering and production planning of initial drawing dumps to ensure clean content; along with ensuring that the Materials Team’s input is considered in anticipated boat #2 pipe dump
Provided first-rate assistance to the Procurement Division on the new construction project of the Washington State Ferries with a budget of approximately $231M per ferry, while working on two ferries
Participated in an intensive IFS training and created comprehensive training criteria for teaching and coaching the entire organization regarding purchase requisition procedures
Genie a Terex Company/Aerotek Fall City, WA
Material Specialist 2011 2012
Coordinated equipment components, sub-assemblies, and accessories, as required for the assigned stage of production and in coordination with a small team of co-workers
Employed keen attention to details in inspecting the quality of work-in-progress from previous workstations by examining alignment and proper fit following a defined standard
Assisted with gathering information on items such as task time cycles, evaluation of safe work methods with lean manufacturing principles
Group Delta Consultants Seattle, WA
Geotechnical Instrument Installer 2010–2011
Coordinated with Traylor Bros regarding the schedules for instrument installation for Sound Transit U220 Link Light Rail Tunnel Project
Administered cable splicing, as needed; strain gauges installation; spot welding; performance monitoring; and delicate instruments evaluation
Handled the installation of data loggers, electrical conduit, instrument cable, transducers for extensometers, and in-place inclinometers
Facilitated field installation under the supervision of the geotechnical engineer; along with progression review with site engineers which included processing timelines, schedules, and troubleshooting of instruments
Obtained in-depth knowledge of geotechnical instrumentation and spot welding for slope indicator instruments after completion of an intensive training
Confidential Fall City, WA
Owner 2003 2010
Rendered keen oversight to entire business operations including development of work orders and contracts inclusive of materials, cost, and on-time completion as well as management of client relationships
Administer entire aspects of interior and exterior renovations, including carpentry, plumbing, painting, siding, window installations, arbors, decks, and roofing
Perform wide range of duties for the production of projects such as purchasing materials, scheduling deliveries, and organizing timelines for installations
Established and cultivated referral relationship with John L. Scott Real Estate in Mercer Island
Played an integral role in the annual production of approximately five full remodeling of bathrooms and kitchens utilizing different kinds of imported Italian tiles
ICICLE Seafoods, Inc. Dutch Harbor, AK
Processor 2010
Observed strict adherence to government policies and standards in maintaining cleanliness and safety regulations within assigned work areas
Managed the overall packaging procedures such sorting quality/grade, scaling, and packing 17# per package, amounting to approximately 1.2M pounds of fish a day
Held responsibility in cleaning four five-ton stainless steel fish hold tanks and a 16’x10 walk-in freezer
Hess Construction Bellevue, WA
Tile Installer 2005 2010
Led the complete tear-out and reframing/rough in shower pans utilizing liner and dry pack method and waterproofing
Created innovative design layouts and plans and administered the installations of floors and wall tiles utilizing different kinds of stone materials such as granite and porcelain
Capitalized on industry expertise in managing varying scales of projects, ranging from small sq. ft. to over $100K projects
EARLIER CAREER
Superior Imaging Group Seattle, WA
Sales and Logistics Coordinator
Eagle Lawn and Garden Issaquah, WA
Paint Department (Part-time)
Atlas Sportswear Inc., Seattle, WA
Print Production Supervisor
Cliff Colour Los Angeles, CA
Production Coordinator
Letter Graphics Culver City, CA
Production Artist
Body Glove International Hermosa Beach, CA
Sample Printer
Professional Development
ISO 1991 and Lean Manufacturing Implementation Training
ISO 9001 Training
Four Color Process Theory Certified
ASA Sailing Certification 101: Basic Keelboat Sailing
ASA Sailing Certification 103: Basic Coastal Cruising
Transportation Worker Identification Credential
Professional Affiliation
Member, American Sailing Association
Technical Skills
Microsoft Windows Microsoft Office Suite (Word and Excel) IFS (ERP) System Software