Post Job Free
Sign in

Project Microsoft Office

Location:
Houston, TX, 77063
Posted:
April 04, 2017

Contact this candidate

Resume:

Ahmad Esmaeili Doabsari

Production Control Planner/Scheduler

Houston, TX 77063

*.**********@*****.*** - 949-***-****

Experienced supervisor and trainer; able to explain information clearly, and recognize excellence in individuals, 10 years of experience with areas of expertise. Worked for 5 years in the largest Middle East cars spare parts manufacturer (CROUSE). Team leader in two projects (Implementing Renault L90 production line and layout in CROUSE Company, Implementing MIS project in KIMIYA MOTOR PAYDAR), Professional in Windows, Mac, Microsoft Office package (Word, Excel, Access, Outlook, PowerPoint, Microsoft Project, Publisher, SharePoint, Visio), SAP, Exceptional ability to stay attentive when dealing with customers, Administrative skills Willing to relocate to: Houston, TX

Authorized to work in the US for any employer

WORK EXPERIENCE

Production Planner/Scheduler,

Crouse Inc. (PJS) - Tehran - September 2010 to July 2015

• Reviewed and updated forecast reports, master production schedules, material requirements, lead-time quotes, capacity planning and shortage report.

• Analyzed production specifications and plant capacity data and performs mathematical skills to determine manufacturing processes, tools, and labor hour.

• Calculated salon’s efficiency.

• Monitored inventory levels and product demand to determine reorder levels and safety stocks that will ensure product availability and minimize inventory costs.

• Planed and scheduled workflow for each department and operation according to previously established manufacturing sequences and lead times.

• Planed sequence of fabrication, assembly, installation, and other manufacturing operations for guidance of production workers.

• Expedited operations that delay schedules and alters schedules to meet unforeseen conditions

• Planed and prepared production schedules for manufacture of products based on customer demand via SAP.

• Prepared purchase orders to obtain raw materials, tools, and equipment.

• Recognize bottlenecks, timing and balancing production lines.

• Monitored daily sale to prevent any possible supply shortages.

• Coordinates and plan material requirements for new products including reviewing BOM’s and cut- in dates to make verification and production units.

• Collaborate with quality assurance department to fulfill ISO requirements.

• Worked closely with buyers, inventory analyst and contract manufactures to determine the appropriate level of safety stock for finished goods and components in order to minimize the lead times.

• Communicates with customers when there is significant variation in product demand.

• Worked with vendors to ensure that supply needs are met. Planning engineer and Project scheduler,

Sahel Consulting Engineers - Tehran - September 2009 to September 2011 Designed and develop project schedule. Interact with project team and task managers to define scope of work to develop and update detailed schedules through PRIMAVERA 6

• Cost information and identification of variances from original plan.

• Evaluated project schedule progress and performance and identify developing problem areas.

• Analyzed critical path and constraints to determine effect of changes to schedule and recommend work-around.

• Assisted project team to develop and maintain periodic status reports to keep management informed on project progress.

• Assisted to set up tasks and sub tasks to ensure satisfactory realization of project contract requirements as scheduled.

• Interact with customer and project staff to schedule work and coordinate assignments. Production Planning Expert,

Kimiya Motor Paydar - Tehran - May 2006 to September 2009 Trained new operators and implemented new division operator training program to improve retention rates and increase production rate.

• Prepared pictorial BOM in order to better identifying of components.

• Timing and balancing each production line.

• Evaluated operational records and made scheduling adjustments to maximize efficiency.

• Supervised material flow, storage and global order fulfillment.

• Implemented MIS project to illustrate each department responsibility.

• Identified bottlenecks and necessary action to eliminate them.

• Analyzed each production lines to detect production problems.

• Supervised material flow, storage and global order fulfillment. EDUCATION

Master of Business Administration in Business Administration National University - San Diego, CA

July 2015 to November 2016

Bachelor of Industrial Engineering in System Analysis Azad Tehran University - Tehrān

2006

SKILLS

Production control planner/Scheduler (10+ years), Scheduler, material planing, Warehouse Management, Inventory Control, Inventory Management, SAP, Computer Skills, Supply Chain, MRP (9 years), Administrative, Ms Project, Ms Excel, Outlook, Project Management, MRP, Sales order LINKS

https://www.linkedin.com/in/ahmad-esmaeili-a288bb57/



Contact this candidate