Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Fairfax, VA
Posted:
March 30, 2017

Contact this candidate

Resume:

Mustaqim Ahmad

*/*

Mustaqim Ahmad

***** ***** ***** **.

Fairfax, VA. 22030

Res: 703-***-****, Cell: 571-***-****

E-mail: aczko0@r.postjobfree.com

Summary of experience:

Worked at General Electric / Quest-Global, USA as Controls Engineer Support for General Electric After Market Services for Control system of CCPS gas and steam turbines from Dec 2014 to Dec 2015.

Worked at Granite Services International Inc. / GE and obtained Training for General Electric Speedtronic Control Systems Mark VI, Training for Environmental Health & Safety (EHS), OSHA, NFPA70E, Lock Out / Tag out by G.E. GE online 34 course for Power Plant maintenance, Operation, Safety, Time and Resource Management, Customer dealing. Practical hands on training for Controls & Instrumentation of gas turbines

Worked at M. C. Dean, VA, USA for Testing and Commissioning of LV Electrical Systems and Switch Gear at Department of Defense (DOD) projects like Pentagon Renovation, BRAC and WHS at Virginia, USA.

Worked as Instrumentation and Control Specialist (I&C Engineer) for G.E and ABB gas turbines of CCPP at Rabigh Power Plant, Saudi Electricity Co., Saudi Arabia.

Worked 3 years with National Power UK experts as I&C Engineer to develop Computerized Maintenance Management System (CMMS) for General Electric Combined Cycle Power Plant (CCPP) at 1650 MW Guddu Power Station, Pakistan.

Worked with Mitsubishi experts as I&C Engineer during Installation Project of Mitsubishi gas turbine

Experience on large Thermal Power Plants of Water & Power Development Authority (WAPDA) Pakistan while working at different positions involving operation and maintenance activities especially as I&C Engineer participated in Retrofit of Control systems of Fuel Regulator and Speedtronic Mark I. Education:

Bachelor of Electrical Engineering (with specialization in Electronics and Communications) from University of Engineering and Technology, Lahore, accredited by World Education Service, USA. Professional trainings:

Training for Speedtronic Control Systems, Environmental Health & Safety (EHS), OSHA, NFPA70E and Lockout/Tag out etc. by GE USA.

Training for Substation Maintenance - I from AVO Institute, USA.

Training for Substation Maintenance - II from AVO Institute, USA.

Training for Coal Fired Power Plants at Shawinigan-Integ, Vancouver, Canada.

Training for Operation and Maintenance of Mitsubishi gas turbines for one month.

Training for General Electric Speedtronic MK I and Training for Operation & Maintenance of Thermal Power Stations (6 Months) at Wapda Training Academy, Lahore. Computer Skills:

Computerized Maintenance Management System TIMS by Husky Software UK

Microsoft Office.

Mustaqim Ahmad

2/3

Professional Experience:

General Electric/Quest-Global, New York USA. December 2014 to December 2015 Controls Engineer Support

Worked as Controls Engineer for General Electric control systems of gas turbines and Combined Cycle Power Plants such as Speedtronic at General Electric, Schenectady, New York, USA. Software updating for Speedtronic MKV, MKVI, MKVIe, developing and embedding Back up Exhaust Temperature Curves for frame 6B, 7FA and type D steam turbines. Changing software for different TILs and embedding into controls. Granite Services International Inc. / GE, Houston, Texas December 2011 - May 2012 Technical Adviser/Field Service Engineer

Maintenance of GE Control systems for gas turbines

Training for General Electric Speedtronic Control Systems

Training for Environmental Health & Safety (EHS), OSHA, NFPA70E, Lock Out / Tag out by G.E

GE online 34 course for Power Plant maintenance, Operation, Safety, Time and Resource Management, Customer dealing. Practical hands on training for Controls & Instrumentation of gas turbines M.C. Dean, Dulles, Virginia October 2008 - November 2011 Commissioning & Testing

Commissioning, testing and maintenance of LV Electrical System, sub-stations and related equipment such as Back up Emergency Systems, Transformers, Switchgears, Circuit breakers, IFS, HVLS, Cables, Disconnects, Switchboards and Panels at projects of Department of Defense (DOD) such as:

Pentagon Renovation Project

BRAC (Fort Meade, Fort Belvoir).

WHS (Building Management Control and HVAC)

Saudi Electricity Co., Saudi Arabia, 2700 MW Rabigh Power Plant March 2000 - October 2008 Instrumentation and Control Specialist

Lead a team as Maintenance Engineer I&C for following:

8x60 MW ABB and 4x70 MW General Electric Gas turbines for ABB and GE Combined Cycle Power Plants

(CCPP).

Retrofit of obsolete ABB control systems: Prepared specifications to replace obsolete control system with state-of-the-art digital control system, technical evaluation of quotations and tenders, scrutiny of offered system and recommendations. Coordination with OEM experts and contractors.

Corrective Maintenance: Troubleshooting and daily maintenance for safe and smooth operation of units.

Planned maintenance: Inspections & Overhauling. Testing and commissioning of instruments, BOP and control systems without OEM experts saving millions.

Spare parts Procurement: Preparation of detailed specifications for multi source tendering saving millions.

Preparation of schedules, budget, technical reports and participation in overhauling review meetings.

Arrangement of manpower. Mentoring of new and less experienced technicians so that team keeps abreast by development of maintenance procedures for new equipment. Saudi Electricity Co., Saudi Arabia. Tabouk Power Plant January 1998 - March 2000 Electrical Engineer

Electrical Engineer for 4x25 MW General Electric frame 5 gas turbines equipped with Speedtronic Control MK-II with ITS and Six Stork-Werkspoor diesel engines.

Associated substation electrical equipment such as Siemens Minimum Oil circuit Breakers, General Electric Vacuum Circuit Breakers.

Procurement of spare parts, specifications, tendering, evaluation and finalization of purchase orders. Mustaqim Ahmad

3/3

Water and Power Development Authority, WAPDA, Pakistan September 1978 – January 1998 1. Senior Engineer I&C July 1995 to January 1998 and April 1986 to March 1992 Quetta Thermal Power Station.

Lead a team as Senior Engineer I&C for safe and smooth running of General Electric, Mitsubishi, Fiat AEG-Kanis gas turbines and Coal fired Riley Stoker (USA) Boilers and De Laval (USA) Steam Turbines.

Retrofit of obsolete GE/AEG-KANIS control systems: Prepared specifications to replace obsolete control system with state-of-the-art digital control system, technical evaluation of quotations and tenders, scrutiny of offered system and recommendations.

Corrective Maintenance: Troubleshooting and routine maintenance.

Planned maintenance: Inspections & Overhauling. Testing and Tune up of Control System, field instruments, BOP without OEM experts saving millions.

Spare parts Procurement: Preparation of detailed specifications for multi-source tendering thus saving millions.

Coordination with OEM experts and contractors.

2. Senior Engineer I&C (CMMS) March 1992 to July 1995 1650MW Guddu Thermal Power Station.

Worked with National Power UK., consultants for 3 years to develop Computerized Maintenance Management System for enhanced efficiency of General Electric 600 MW Combined Cycle Power Plant using Husky Soft ware’s Technical Information and Maintenance System (TIMS) comprising of:

Asset Definition and Asset Collection.

Development of Work Specifications and procedures for Control systems and related Instrumentation.

Short term and long term planned maintenance schedules for I&C.

Setup of Work Request Issuance and Work Order Control Center.

Setup of Stores Module for economical and smooth purchases.

`

3. Assistant Engineer I&C March 1983 – April 1986

Quetta Thermal Power Station.

To assist senior engineer in trouble shooting, corrective and planned maintenance of:

General Electric, Mitsubishi, Fiat AEG-Kanis gas turbines and Coal fired Riley Stoker (USA) Boilers and De Laval (USA) Steam Turbines.

Corrective Maintenance: Troubleshooting and daily maintenance for safe and smooth operation of units.

Planned maintenance: Inspections & Overhauling. Testing and calibration of field instruments, BOP and control systems without OEM experts saving millions. 4. Assistant Engineer Operations. June 1980 – March 1983 Quetta Thermal Power Station

Lead a team for Shift Operation of:

General Electric, Mitsubishi, Fiat AEG-Kanis gas turbines and Coal fired Riley Stoker (USA) Boilers and De Laval (USA) Steam Turbines and 132Kv switch yard.

Preparation of shift reports, monthly and annual generation reports.

Planning for emergency/annual shutdowns and testing of stand by equipments

Investigation of tripping and other faults, root cause analysis.

5. Assistant Engineer Telecommunications September 1978 – April 1980

Responsible for maintenance of Power Line Carrier Communications equipment from SIEMENS and ABB along with associated automatic exchanges and auxiliaries such as battery system and chargers.



Contact this candidate