Post Job Free

Resume

Sign in

Engineer Design

Location:
Oconomowoc, WI, 53066
Posted:
March 28, 2017

Contact this candidate

Resume:

P

PATRICK J. SELODE

N** W*****

Sussex Rd.

Hartland, Wi. 53029

262-***-****

acziyc@r.postjobfree.com

Summary:

Sir, Industrial Engineer Technician / Manufacturing and Design Engineer with over 25 years of progressive experience in product design and hands on production. Background in performance testing, Lean Methodologies and Kaizen Projects. Proficient in Process Instruction generation, Process Flow Diagrams, and Failure mode effect analysis (FMEA), both design and process. High end user of Pro-e (CREO) with expertise in Geometric dimensioning and Tolerance. Project Leader experience for new product development and launch. Extensive trouble shooting on mechanical failures, including customer interface on prototype testing during phase. Professional Experience:

Quintech Integration, Inc. Pewaukee, Wi. (Contract Assignment) Industrial Engineer Apr. 2016 to Nov. 2016

$10-24.9 Million Turn Key Conveyor System Integrator of Powered and Gravity Feed Conveyor’s servicing

‘High Volume” package sorting and loading for, UPS, FedEx Ground, FedEx Smart Post facilities. Team Member for Conveyor System Engineering, Component Specification, Component Pricing. Research and retention of Mechanical and Electrical Contractors for project Bid submittal to customers. Permit Application which included Fire, Egress, and Seismic requirements. Site Layout dimensioning in Auto Cad, Datum Reference Lines for conveyor installation.

Extensive travel to potential job sites for installation verification and confirmation of customer’s Design Layouts.

Field Project Management during project execution which interfaced with Equipment Supplier’s, Customer Plant Engineering, and installation contractors. Conduct Conveyor Audits with customer representatives to ensure specifications for Safety, Function, and Structural integrity have been followed and met.

Powered Conveyor Commissioning with the customer and installation contractor to ensure proper operation, and Safety Features are functional.

Coordinate any additional system modifications resulting from Commissioning and Audit’s. GENERAC Power Systems, Inc. Eagle/ Waukesha, Wisconsin 2009 to 2016

$2.4 Billion global manufacturer of Back-Up power Generators, Industrial and Commercial Market. Sr. Industrial Engineer Technician:

Responsible for all phases of Small Industrial Liquid Cooled Stand By electric power Generator assembly. Responsible for Alternator final assembly of Direct Drive and Gear Box driven Alternators ranging in size from 30 KW to 200 KW.

Responsible for Parts Distribution Center (PDC) set up High Volume Service Parts packaging line, coordinated all rental and maintenance of Lift Truck Equipment. Purchased all packaging materials and equipment. General facility maintenance including Public Well contamination clean up. Fire Door Inspection and PM schedules. Coordinated packaging equipment installation and PM’s.

P

Conducted numerous detailed time studies for “Configured” and Modelized industrial generators to balance assembly lines.

Facilitated (4) new Diesel powered, and (5) Spark Ignited Pilot and Pre-Production builds of Standby By generator new product introduction. This involved identifying design issues, BOM inaccuracies and product structuring.

Establish all assembly procedures and Work Instructions of generator and alternator production process.

Designed Diesel and Spark Ignited Engine Prep. Fixtures still in use today at the Eagle and Whitewater facilities.

Designed and implemented a “Modular” Customer Connection Interface assembly line which houses High and Low Voltage Circuits and Control Panel for all current Industrial Generator production.

Created and maintained routings for all generator and alternator assembly.

Responsible for Test Cell safety equipment and Emission Testing equipment maintenance. All fuel types, Natural Gas, Diesel Fuel, LP liquid and Vapor systems.

Worked closely with production staff and QA Dept. to eliminate production line rework which resulted in achieving Efficiency and Effectivity ratings to meet goal.

Generated torque campaigns for all torque control tooling, responsible for all tool purchasing and repairs.

Coordinate all Bridge Crane and Jib Crane maintenance and repairs and installation. HUSCO International Waukesha, Wisconsin 1991 to 2008

$245 Million Global manufacturer of Customized Hydraulic equipment Manufacturing Engineer, Industrial Products Division (2005 to 2008) Responsible for engineering support to analyze design needs prior to production. Critiqued design to ensure efficient assembly practice and cost effective labor rates. Oversaw all Final Operations Including Assembly, Test, and Paint.

Member of team to design and install next generation of semi-automated production Lines. Result: Increased production by 30% and reduced errors by 90%.

Participated in Kaizen events to analyze current manufacturing processes for efficiency. Result: Enhanced process efficiency by 15 to 30%.

Facilitated numerous process FMEA’s to identify and eliminate cumbersome processes. Result: Effectively met routing times in line with customer expectations, maintained production line balance.

Handled company-wide bore finishing operations.. Result: Attained a 30% reduction of tool consumption, 40% of tooling costs, and 50% of new tool setup time.

Redesigned blind bore tooling. Result: Achieved a 40% reduction of scrap rate, achieved a repeatable process.

Scheduled Preventative Maintenance for all machinery and equipment, as well as day to day repairs. Result: Continuous maintenance of monthly production goals and order schedules.

P

Design Engineer – Industrial Products 1993 to 2005 Project Leader of Pilot Pressure Controls Group

Responsibilities spanned design, prototype build, testing, customer testing and 2005 production implementation.

Implemented rapid prototype delivery and enhanced design, increased customer technical and field support. Result: Restored customer confidence in product line and retention of $5,000,000.00 account.

Design team leader for global product requiring on site design work in the UK. Result: Completed qualification testing to support successful design approval. Exceeded production forecasts by 45%.

Design team member for 22,000,000.00 product line of Hydraulic control valves and joystick controls for tractor loader backhoes (TLB’s), bulldozers, and skid steers. Result: Met all customer design specifications, approvals, and production goals. Designer 1991 to 1993

Member of design team to develop Proportional Solenoid valve, still in production. Prior to 1991

Held positions as Mechanical Designer, Drafting Supervisor in heavy Industrial manufacturing. Education:

1 tear completed Mechanical Drafting – Waukesha Technical College

2 semesters completed Design of Machine Elements and Statics and Strength of Materials Milwaukee Area Technical College.

Training and additional certificates:

Kaizen Principals, 2007

Six Sigma Yellow Belt, 2007

Geometric Dimensioning and Tolerance, 2004

Basic Pro-E and Advanced Pro-E (CREO) Parametric Technology Corporation



Contact this candidate