Post Job Free

Resume

Sign in

Electrical Engineer-Project

Location:
Jazan, Saudi Arabia
Posted:
March 25, 2017

Contact this candidate

Resume:

Engineer Rahil Tasawar

009***********(Riyadh, KSA) 009**********(Pak)

E-mail: aczg7u@r.postjobfree.com

More than 18 year diversified experience in deriving EPC projects from pre-construction through project closeout by carrying out the Project construction execution, field engineering, QC inspection, pre-commissioning and commissioning. Implementation, Monitoring & Control Construction for all stages throughout the Project’s span from the phase of Engineering/Design up to Hand over by carrying out the .

Moreover, well skilled in developing estimates and schedules, attaining bids and managing the work of subcontractors across various trades, maintaining detailed vendor and project information databases, expediting project construction schedules.

Professional Qualification:

•B.Sc. in Electrical Engineering

1992 To 1998.

•Approved by Saudi Electricity Company as PM

•Member of Saudi Engineering Council as Professional Engineer

•Member of Pakistan Engineering Council as Professional Engineer

•Certified Internal Auditor.

Professional Skills

•Extensive background and expert in electrical installations including!

•Power/Dist. Transformers from 100 kVA to 100 MVA

•11/33 kV outdoor switchyards

•69/33 kV GIS Switchgears with related R & C Panel

•11 kV AIS Switchgear panel with Control

•Compact & Package substations

•MV RMU’s

•Underground Power/Control/Signaling cable works(FOC & SCADA)

•Overhead lines up to 33 kV

•High bus riser ducting

•indoor/outdoor lighting along with Electric conduits,

•Cable Trays system

•Fire alarm system

•3 MVAR to 10 MVAR multi-stage Capacitor Banks

•DC Supply System i.e. 24VDC to 110 VDC,

•LVAC works

•Chiller Plants of different capacities

•SCADA(ABB)

•Security and Access Control Systems.

•Oversee all on-site project activity to ensure projects are completed on schedule, within budget, and in accordance with engineering design.

•Coordinate and communicate between field, designers and client.

•Interfaced and communicated with client regarding project status and coordinated as required to resolve issues with site construction, procurement, and/or engineering.

•Ensure that construction plans are in agreement with customer expectations and identify points at which contractual obligations will have been met. Reviewed engineering designs, drawings and other related engineering documents to identify potential problems ahead of time and proactively implement solutions.

•Cost estimating and creating the budgets for projects.

•Monitoring the subcontractors and vendors/suppliers performing work on the project.

•Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.

•Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.

•Coordinated proposed changes in design with consultants and construction manager while maintaining schedule and budget.

•Good team mate and leader, motivated to move ahead.

•Long affiliation to work with multi-national and multi-culture environment.

•Interfacing and communication with all levels of management, quality managers and inspectors, development engineering divisions and QA testing staff.

•Quality Assurance & Control Project Interface.

•Testing, Pre-commissioning and Commissioning of Electrical installations.

CURRENT EMPLOYMENT

Company: China Harboure Engineering Company, Jizan, KSA

Client: ARAMCO

Project: An EPC Project of Seawater Intake System with 132/13.8 kV, 3 x 50 MVA Substation, 12 X 3000 kW Water Pumps etc.

Position: Pre-Commissioning Manager

Duration: Dec, 2016 to date

EMPLOYMENT DETAILS

Company: Hadania Corporation, Riyadh, KSA

Client: Saudi Electricity Company

Project: Turn-Key Project of a New 33/13.8 kV Substation at Baqaa, Hail

Cost: SAR 30 Million

Position: Project Manager

Duration: Sep, 2015 to Dec, 2016

Responsibilities:

•Overseeing of construction of approved projects, including monitoring all phases of construction, to ensure quality of work and terms and conditions of the respective contracts are fulfilled.

•Control and update drawings, specification, submittals received and approved by the client for construction site copy/Issued for Construction.

•Conduct surveillance site monitoring to assure that the electrical activities are based on company standards before final inspection.

•Inspect and witness the Testing of Electrical equipment like Transformers, Switchgears, RMU’s and cables etc.

Company: Global Chemical & Maintenance System LLC, Muscat

Position: Project Manager

Duration: June, 2008 to June, 2015

Projects in account as Project Manager:

•EPC Project of Extension of 11/33 kV, 2 x20 MVA Substation constructions along with demolishing of 33/11 kV Switchyard by creating new distribution system.

Client: Rural Area Electrical Company, Oman

Location: Khasab, Oman

Cost: SAR 13 Million (Converted from OMR)

•EPC Project of 11/33 kV, 2 x20 MVA, Step up Substation construction along with 10 km power cable laying and 33 kV Switchyard

Client: Rural Area Electrical Company, Oman

Location: Mazyuna, Oman

Cost: SAR 15 Million (Converted from OMR)

•Construction of 33 kV building, installation of 20 x GIS Switchgear panels along with all ancillary system.

Client: Mazoon Electricity Company, Oman

Location: Nizwa, Oman

Cost: SAR 11 Million (Converted from OMR)

•Up-grading of Buraimi 20 S/S form 2x 6MVA to 2x10 MVA.

Client: Majan Electricity Company, Oman

Location: Buraimi, Oman

Cost: SAR 5 Million (Converted from OMR)

•Up-grading of 33 kV S/S up to 2x 3MVA along with 12 km 11 kV O/H line 08 km Power Cable Laying.

Client: Majan Electricity Company, Oman

Location: Wadi Fida, Oman

Cost: SAR 4 Million (Converted from OMR)

•A Turn-Key EPC Power Project (6 MW, Cummins) in one Island of Oman (Hallanyiat).

Client: Rural Area Electrical Company, Oman

Location: Hallanyiat Island, Oman

Cost: SAR 30 Million (Converted from OMR)

•A Turn-Key power project of capacity 10 MW (Cummins and Mireles Black Stone at Mudhai in Dhofar region in Oman.

Client: Rural Area Electrical Company, Oman

Location: Mudhai, Oman

Cost: SAR 13 Million (Converted from OMR)

•A Turn-Key power project (5 MW, Caterpillar).

Client: Oman Telecom Company, Oman

Location: Salalah, Oman

Cost: SAR 3 Million (Converted from OMR)

Company: Arabian BEMCO Contracting Company, Jeddah, KSA

Project: PP9, 1200 MW Power House, Riyadh

Client: SEC-CRB

Position: Electrical Engineer

Duration: April, 2005 to June, 2008

Responsibilities:

•Execution works for Electrical Equipment’ installtions such as cable tray works, power &control cable laying, indoor /outdoor wiring/conduit works and earthing system etc.

•To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.

•To provide the entire electrical solutions as per requirement.

•To maintain the DPR/WPR & MPR etc..

•To check the entire work as according to approved drawings.

Company: Thabat Group of Industries, Hodeida, Yemen.

Position: Electrical Engineer

Duration: June, 2001 to Feb, 2005

Responsibilities:

•Monitoring, controlling and troubleshooting of Power distribution systems and electrical process equipment, Power/Distribution Transformer, 11 kV/33 kV GIS/AIS Switchgear, MV/LV cables, DC power supply System, Motor control center, etc.

•Routine/preventive & corrective maintenances of 21.5 MW Caterpillar power house.

•Installation of conduit system, cable trays, cable laying for new machines installation as per approved drawings and location.

•Testing of All type of cables such as Continuity, Megger & Hi pot test, etc.

ELECTRICAL ENGINEER (H.O.D.)

Company: Ghazi Power Ltd. Bhai Pheru, Pakistan

(21.7 MW capacity power House equipped with CATERPILLAR GENSETS- Model- 3616). 1999 – 2001

FIELD SERVICE ENGINEER (ELECTRICAL)

Company: Allied Engg. & Services Limited Lahore, Pakistan.

(SOLE DEALER OF CATERPILLAR GENERATORS AND EARTH MOVING MACHINES IN PAKISTAN) 1998 – 1999

PROFESSIONAL FOREIGN TRAINING

Professional training regarding Latest Cummins Engines as well as Cummins Power Generation/engine control systems at Cummins Regional Office Dubai, UAE as follow:

•G-Drive (G.C.S.) Training Level Two By Mick Evans.

•New ISB’s Engines Training by Mick Evans.

•Power Command Control Technical Training

(PCC & PCCP-1).

•Power Command Control Technical Training (PCCP-2) By Charles Porter.

•Basic Electronic Theory and Systems (On Line Special Course).

•Computer Based Engine Control System, INSITE- 6

COMPUTER SKILL

Operating Systems : Windows – 10, XP, Windows vista, Window 7.

Packages : MS-Office 2007 - 2013



Contact this candidate