Post Job Free

Resume

Sign in

Project Engineer

Location:
Cranston, RI
Posted:
March 22, 2017

Contact this candidate

Resume:

*

Hasan Khaled, Sr. Project Scheduler

Delay Analyst / Forensic, Claims Planner

MSc. Construction Project management, BSc. Civil Engineering, Mobile: +1-401-***-****

E-mail: aczfqo@r.postjobfree.com

Seeking a position in the Construction Field wherein I can utilize the blend of my 10 years’ practical Experience and enhanced educational skills to help in achieving the organization growth and targeted goals.

7 Years of Professional experience in the construction fields, Oil&Gas Fields

(EPCC Projects, High Rise Building, Low Rise, Villas Compounds...etc.) in the domain of Planning, Scheduling, Projects control & management.

2 years /UG of Professional experience in Projects Engineering coordination and Technical solutions (Civil, Arch. & MEP).

2 Years/UG of Professional experience in Projects site supervision for Site works and activities at all Phases of projects execution period and handing over stage/UG.

INITIAL PRODUCTION FACILITY,EPCC PROJECT,ZUBAIR OIL FIELD,IRAQ WEATHERFORD OIL TOOL MIDDLE EAST, DUBAI, UAE

Sr. PLANNING ENGINEER Delay Analyst / Forensic, Claim Planner . Project Value $ 980,000,000

Responsibilities include:

Assist with dispute resolution and claims planning matters on multiple projects, including construction scheduling, delay and disruption analysis.

Project based tasks to include fact-finding to detailed analysis, quantification of delay and damages, economic modeling, and strategy formation.

Demonstration of critical paths & consequent disruption etc.

Development of the master and construction schedules, liaison with works package contractors to ensure all programmes are consistent with the construction schedule.

Demonstration of entitlement to EOT occurring as a result of delay/ disruption/ loss of efficiency. Production rate analysis and work cycle analysis to demonstrate entitlement to EOT, drafting of claim and negotiation strategy. Career Objective

Projects Accomplished Experience

Experience Narrative

2

Development of the master and construction schedules using Primavera P6. and liaison with contractors to ensure all baseline programmes are consistent with the construction schedule.

Support experts in demonstration of critical paths, consequent disruption and entitlement to EOT occurring as a result of delay/disruption/loss of efficiency

Preparation in anticipation for the defenses to counterclaims and advice regarding retrospective analysis for EOTs, prolongation costs, disruption, programme critiques and delay analysis critiques..

Extracting, analyzing and comparing critical paths of multiple schedules.

Reviewing and analyzing the schedules and other project data as required.

Carrying out appropriate analytical techniques to derive Contractor time entitlement (or lack of it).

Understanding and applying resourcing and cost to schedule activities as well as generating S curve analysis from such.

Competency in financial and contractual matters and fully conversant with FIDIC form of contract.

Interfacing with both clients and other key stakeholders including inter-office disciplines at a senior level.

FIRST OIL PRODUCTION EPCC PROJECT FOR GARRAF OIL FIELD DEVELOPMENT/IRAQ EPCC PROJECT

WEATHERFORD OIL TOOL MIDDLE EAST, DUBAI, UAE

Sr. PLANNING ENGINEER (Jun 2011 – Jun 2013)

Project Value $ 370,000,000

Responsibilities include:

Review and understand all relevant documentation pertaining to the project including scope of services, project execution plan, proposal/project schedule

(including manpower projection plan), conditions of contract.

Work within the standard planning/scheduling procedures. Ensure that these procedures fulfill client requirements and develop additional project specific procedures where necessary.

Prepare activity plans to accomplish all work required by the procedures and to ensure that sufficient planning resources are provided.

Consult with Engineering as necessary to validate and confirm construction plans and strategy.

Liaise with Client Project Control personnel as necessary.

Timely preparation and issue of :

- Overall Project Schedule Level I

- Strategic Project Schedule Level II

- Project Network Level III

- Schedule Basis Memorandum (SBM)

- Manpower Projection Plan

- Critical Equipment Lists/Schedules

- Progress 'S' Curves and tabulations

- Man-hour/Manpower histograms

- Short-term look-ahead schedules

- Monthly progress report including narrative

3

Ensure that all involved parties participate in preparation of items described in above Item and that they agree to their respective elements and approve documents where necessary.

Produce current physical progress reports and final job statistics.

Prepare and issue project action reports to Project Planning Engineer.

Maintain accurate schedule and control curves in an updated condition.

Analyze schedule trends and produce regular forecasts of schedule performance and issues for project review

INTERNATIONAL PETROLUIM & INVESTMENT COMPANY (IPIC) NEW HEAD QUARTER PROJECT

COMMODORE CONTRACTING COMPANY, ABU DHABI, UAE

PLANNING ENGINEER (Jun 2009 – Jun 2011)

Project Value AED 1000,000,000

Responsibilities include:

All Related Planning & Scheduling duties for the above project from the Building Permit Certificate (27.04.2009) to Building Completion Certificate

(14.02.2012).

Responsible for developing Integrated CPM schedule which shows the sequence of events compatible with Work Breakdown Structure.

Coordinates schedule input from multiple contractors and project teams and incorporate the information gathered into the integrated schedule.

Prepares short-term look ahead schedules and leads the update in routine progress meetings.

Responsible for developing, measurement and reporting progress, including progress “S” curves

Monitors and forecasts progress of activities in schedules by assessing or measuring physical progress in engineering and field construction.

Highlight problem areas and recommend remedial actions.

Evaluates allocation of resources and provide recommendations to maintain required progress.

Forecasts weekly and monthly work progress for the project.

Liaisons with all team leaders to communicate required completion dates and interfaces between responsible parties.

THE CUBE TOWER & ALFATTAN TOWERS OFIICES BUILDING

SUNG WON CORPORATION DUBAI, UAE

PLANNING ENGIEER, TECHNICAL & ENGINEERING COORDINATOR Jun 08 – May 09 Responsibilities include:

Establish and manage a planning and progress control system in order to support the Project Control Manager decisions making process and allow him to complete the production/installation according to the internal baselines and in compliance with the contractual dates and requirements.

Ensure the implementation of the Planning and Progress Control System through the review of the contractual documents, issuance of project schedules according to CPM, interface with Production Departments to build up activities, 4

assign milestones and constraints, and suggest indicators and objectives. Also checks the tasks progress, update schedules and calculate ratios, accordingly.

Maintain updates of all schedules. Ensure any deviation from plan is promptly spotted and analyzed, final time impact is estimated and the effect of corrective actions taken is monitored.

Create a schedule awareness atmosphere among all project participants and maintain records for all significant events relevant to contractual claims/obligations.

Provide requested histograms, tables, curves, resources logs. Compiles productivity report, delivery status of materials and other deliverables (using

Primavera P3/P6 & other applications).

CRICKET STADUIM – DUBAI SPORT CITY

BAUER ENERGT & INTELLECT COMPANY, DUBAI, UAE

SITE PLANNING ENGINEER (MECH. & ELEC.) Feb 2007 – May 2008 Project Value AED 740,000,000

Responsibilities include:

Liaising with any consultants and/or sub-contractors engaged in the project.

Checking drawings and quantities of MEP Works.

Supervising and monitoring the site labor force and monitoring the MEP works.

General planning duties including the creation of baseline program, generation of WBS,Activity codes, resource allocation and loading, Cost allocation and loading, weekly updates, producing periodic reports...etc.

Selecting the appropriate techniques and sequence of events for the project Execution Plan.

presenting schedules of work, often with visual aids such as bar charts and procedures diagrams;

Using specialist planning computer software, such as Primavera Project Planners,Excel, MS Project...etc.

monitoring progress throughout the construction process and comparing this with the projected schedule of work;

liaising with the site agent and surveyor throughout the process, making adjustments to projects as necessary;

Develop and Revise program of works for the purposes of mitigating the occurred delay during works progress.

YAFOUR GARDEN RESORT /VILLAS COMPOUND – DAMASCUS, SYRIA GROUP OF ARAB CONTRACTING ENGINEER, DAMASCUS, SYRIA SITE PROJECT ENGINEER Apr 2006 – Jan 2007

Responsibilities include:

Responsible for management of material and human resources on sites

Perform cost analysis and prepare budget for senior management review

Assist engineers in designing layout and site research

Act as liaison between builders and contractors to ensure adequate supply of resources

Coordinate with site inspectors to check the ongoing project status and development

Maintain reports of contractors for proper execution of key projects on a daily basis

Check the material quality as per prescribed standards. 5

Master Degree Construction Project Management (In Progress) Heriot Watt University, School of Built Environment – Dubai - UAE

Bachelor’s Degree in Civil Engineering (BSc.), 2001-2006 University of Damascus, Faculty of Civil Engineering, Damascus - Syria.

AutoCAD 2003 -2009.

Microsoft office Applications Word, Excel, Access, Power Point.

Microsoft office Project MS Project.

Primavera P3.1 & P6.

Resource Management Using Primavera Level 2.

Advanced Project Progress and Delay Calculation Using Computer

Primavera Professional Training.

Intensive courses in Planning, Management, Construction Claims, and Time delay analysis, from 2P2C Project Controls Services (specialized company).

Effective planning & Scheduling Using Primavera 6.0

Project Management Professional (PMP) international test preparation course.

Arabic: Native speaker.

English: Excellent in speaking, reading and writing. Nationality: Syrian.

Resident of: USA, Rhode Island 02905

Birth date: 15 Jan, 1984

Gender: Male.

Marital Status: Married.

Mobile: +1-401-***-****

E-mail: aczfqo@r.postjobfree.com

Skills & Education:

Professional Courses

Personal Information & Contact Details

Languages



Contact this candidate