Post Job Free

Resume

Sign in

Telecom Specialist

Location:
Cedar Hill, TX
Salary:
$25+
Posted:
March 21, 2017

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

EXPERIENCED IT PROFESSIONAL WITH OVER 12 YEARS OF DIVERSE EXPERIENCE, EXPERTISE IN DATA CENTER HARDWARE OPERATIONS.

PROFESSIONAL EXPERIENCE

LEVEL 3 INC. DAY OPERATION TECHNICIAN

Telecommunications Technician Job Duties:

Plans network installations by studying customer orders, plans, manuals, and technical specifications; ordering and gathering equipment, supplies, materials, and tools, assessing installation site; preparing an installation diagram.

Establishes voice and data networks by running, pulling, terminating, and splicing cables; installing telecommunications equipment, routers, switches, multiplexors, cable trays, and alarm and fire-suppression systems; building ironwork and ladder racks; establishing connections; programming features; establishing connections and integrations; following industry standards; activating remote access tools; coordinating with contractors.

Verifies service by testing circuits, equipment, and alarms; identifying, correcting, or escalating problems.

Documents network by labeling and routing equipment and cables; recording configuration diagrams and specifications.

Maintains network by troubleshooting and repairing outages; testing network back-up procedures; updating documentation.

.

APRIL 2016- PRESENT

WISECONNECT INC. OCT-2015-APRIL 2016

TELECOM SPECIALIST

INSTALLING CIENNA SHELVES, RACKING AND STACKING, ADDING SHELVES,DRESSING CABLES,

CAT5E,TERMINATING,FIBRE BUILDING FIBRE THROUGH AND LADDER RACK AS WELL, DO BNC TERMINATIONS AS WELL AS DS1, DS3 CONNECTIONS

EF & I June 2014 - December 2014

Network Technician-1

Identifies, troubleshoots and resolves hardware-, software- and network-related problems

encountered by end-users of the, the Internet, the mainframe, PCs and Macintoshes and new computer technology.

Configures and installs Windows workstations and Macintosh operating systems in response to the demands of a complex network design.

Helped end-users on the use and features of the various operating systems and applications on the various platforms.

Performs primary network system administration on network servers as needed.

Installs, certifies and troubleshoots campus and remote-campus network cabling infrastructure,

including a wide variety of local area network equipment and software.

Uses established tracking system to log requests; monitors progress, tracks problem resolution,

identifies patterns of failure, researches bug fixes and implements solutions; communicates with

manager regarding unresolved problems.

AS a vendor to help to resolve hardware operating system issues; researches and tests possible solutions and implements solutions.Analyzes bugs in system and application software; researches and tests possible solutions; implements solutions.

Works with Programmers to solve mainframe application problems to meet end-user computing

needs.

Insight global Inc. June 2014

Network Technician-1

Outsource Telecom Inc. February 2014 - May 2014

Data Center./Voice and Data

Ran and terminated cat6e cable rack and stack.

Servers, switches and routers.

Build basket-like troughs to run the cable in.

Build ladder rack, and dressed out closet.

Punch down patch panels, labeling,adds and updated

Equipment

Nexius Co January 2014 - February 2014

Installer (DAS LTE)

Primary tasks to do for tomorrow are the following:

Layout ” coax cables per RF design. We will pre-cut cables based on RF design cable lengths, as possible.

Connectorize the N-connectors to the ” coax using automatic Prep tool. Demo may be needed to ascertain that each team can perform the task.

Access the drop-down ceiling locations per RF design, bore hole carefully on the ceiling tile and attach indoor antennas appropriately.

Layout prepped cables inside ceiling

Mount back ceiling tiles with installed antenna

Connect indoor antennas to Prepped ” Coax cables.

Install Splitters/Couplers as needed.

Label the new antennas with new Antenna numbers

Identify the existing labels of the antenna and redline the RF design as necessary

Take photos of the installations, particularly the Antennas with labels.

ERICSSON/JM Neil October 2013 - January 2014

Site Auditor

Travel to each site (DFW) and plug in the RBS Switch and

Recorded the serial numbers of all newly installed equipment that was installed in the switch.

Strategic Direct Solutions LLC June 2013 – October 2013

Battery Replacement and Installer

Installed Ladder rack, build battery rack and terminate

Battery cables mount battery cabinets,as well as place batteries in the cabinets.

Outsource Telecom Inc. May 2013 - June 2013

Installer

Rack n stack Shelves and ran and dressed cable, build letter rack and

Fiber troughs and terminate cat5e, cat6 etc. as well as pre-fab fiber.

Travcom Inc. March 2013 – May 2013

Installer/Commission

Installing shelves, (cisco) routers running cable,

Power cables, terminating in the BDFB, lacing the cable down to the rack

Building and lugging cables documenting all work according to specs.

Installing fuse panels and powering up all equipment.

C4 Tech services Inc. Jan 2013 - March 2013

Installer/Integrator

Build the 6201/ and integrations

The cabinets, then call the noc

To see if the noc could see the 4g integration

Also with call test phone check to see if the data up link

And download were to specification, as well as voice specifications.

Also commission the DULs and integrate the SP210/310 if need be the SP31

Cat 3, Cat 5, Cat 5e, Cat 6, Coax, fiber cabling, testing of DSO/DS1/DS3 circuits, utilize & maintain DACS system. In addition, performed provisioning & maintenance of Alcatel Lucent, Samsung, Ericsson or Lucent 5ESS switch, OC3, 12, 48 & 192 circuits, including the Sonneplex within the Central Office.

Arris Solutions Inc. Oct 2012 – Dec 2012

Installer/Installation

Rack and stack, put in shelves run cable, dress cable from site to site

Nal/Syncreon April 2012 - September 2012

Building (RBS) cabinets, (6102, 6601, and 6101)

Pre-stage the cabinets, inventory of the bom. (Material to build the cabinets) then get cabinets

Ready for deployment. Test and make sure that it has continuity. Build cabinets for, Sprint

Metro P.C, US Cellular. Indoor and outdoor cabinets.

EXI PARSON/ ERICSSON February 2012 - March 2012

3RD & 4TH Carrier Installs

Include Installing (RRUW)’s

Running (LMR) cables and dressing them in,

Taken pictures befor and after installs.

Grounding,the Radio’s. Running conduit for the fiber.

Installing the fibers, running cables (LMR) into the 3106 (outdoor) cabinets.

As well as the 3206 which are (indoor) cabinets? Doing (DAM REPORTS).

Daily (EOD) reports.

Verizon Lab / Business Office September 2010 to March 2011

Central Office Installer

Testing and turning up functions for DS0/DS1/DS3+ services.

Interacting with both internal/external Customers and Carriers.

Operating and maintaining all types, including legacy systems as well as next generation technologies, of local and toll switching equipment, data network equipment, computer processing equipment and associated peripherals. Assisting with or performing system and equipment installations, acceptance testing and initialization.

Performing and verifying generic upgrades, system reconfigurations, F.C.O.'s hardware changes and system relocations.

Assigning cable pairs and installing interfaces to ports, and associated computer equipment.

Performing daily backups and routine monitoring of switches, computer systems and data networks.

Monitoring switching equipment computer systems, networks to ensure they are operating at optimal levels. Corrective action taken as needed.

Tracking, analyzing, and reviewing system alarms, logs, trouble reports, traffic measurement reports, etc. Corrective action taken as needed.

Performing tests, analyzing data and interpreting manuals and wiring diagrams to locate and clear trouble conditions in switching equipment, computer systems, data networks and associated peripherals.

Planning jobs and determining materials, tools, force, to complete tasks. Developing schedules for completing tasks. Adjusting priorities and informing work team when problems arise.

Maintaining accurate and complete records. Preparing and updating logs, records and files regularly.

Works inside an open office environment at a computer terminal for extended periods of time, and modifies/analyzes some software programs. May be required to travel and work in various buildings.

Outsource Telecom Inc. May 2009 - August 2010

Data Center/Blackberry Inc./Voice and Data

Ran and terminated cat6e cable rack and stack.

Servers, switches and routers.

Build basket-like troughs to run the cable in.

Build ladder rack, and dressed out closet.

Punch down patch panels, labeling,adds and updated

Equipment.

AT&T Company June 2008 - April2009

Central Office Installer

Ran cat5e, Cat6 cable, and fiber optic cable.

Installed jumpers and fiber trays.

Installed Cisco 7600 and 7610 multi-plexers.

Installed fuse panes, and BNC connectors.

Wire-wrapped 100 pair cable.

Installed iron-work.

Fusion Solutions 2007-2008

Central Office Installer

Ran (cat5e) cable.

Mounted bays

Wire-wrapping and cable dressing.

BNC, RJ-45 fiber optic

Tested equipment with T-berd (2300) and Fluke analyzers.

Switch & Data Inc. 2007

Infrastructure Engineer

Worked at keeping the circuits up, ran cat5e fiber-optic, BNC cables in and out of a multi-media room. Installed cages and kept the facility cages together.

EF & I Service Corp. July,2006 – Dec,2007

Central office Installer

Worked at the AT&T facility, putting bays together, wire-wrapping, dressing cable, building iron-racks and testing equipment.

Cingular Wireless May 2005 - June2006

Complete installation of the 2106 RBS units:

Mounted the base frame according to the site drawings.

Marked and drill the holes

Attached and anchored RBS to the base frame

Tightened with torque wrench (30-40) nm

Placed the ground cable on the cabinet and secured the ground cable on the roof of the cabinet (15nm)

Connected the AC main power supply to the ACCU with four single-phase cables.

Connected the DC power supply.

Connected the battery back-up systems in case of the power failure.

Connected the power and fiber cables between the BBS and the RBS cabinet.

Connected the antenna cables according to the site specifications.

Tested the 2106 RBS cabinets, inspected the cable connections, and switched on the RBS,

Set up the IDB, read fault status, testing external alarms, testing battery back-up system and performing concluding routines.

Performed these tests with a laptop PC notebook using the OMT software package.

Certified Communications November 2004 –April 2005

Ran and terminated cable (cat-5e and fiber-optic)

Data cross-connect, put in jacks, set phones in workstations, and MDF and IDF

Install PBX phones and cross-connect them as well.

Dress and form cable in pathways and j-hooks. (Main Distribution Frame) J hooking, installing backboards, dropping cables down the walls and jacking them

Installed, labeled and terminated closet dressing

Nortel Networks Inc. Sept 2001 - November 2004

Central Office Installer

Installed BDFB’ s for Mojave Wireless Corp. in Kingman, Arizona on 19 cell site across King Man, AZ

Ran and terminated cat-5e and fiber-optic cable for voice and data.

Dressed and formed cable in pathways.

Performed J hooking, installed backboards, and dropped cables behind walls.

Installed:

o250 DMS Switches

oE-mobility I-BTS stations

oPatch Panels (IRNC, Passports, 1500)

oPower works fuse-panels

oRan Fiber-Optic Cable

oMulti-port Aggregate Devices

oPassport Router

oRan (RF) Cable

oBDFB Power Distribution Bays.

Butler International Communications Company 1999-2001

Central Office Installer

Installed 250 GPRS Switch with Nokia for T-Mobile.

Installed RF cable to various BTS stations

Responsible for defining the limitations of application and inspected rendering NDT codes.

Set-up and verified equipment settings

Evaluated results according to applicable codes, standards, and specifications.

Supervised all level 1 duties that included organizing and reporting results of all CO inspections

EDUCATION

1999 Butler Technology School US-Texas-Irving

1983 Cedar Valley Community College

CERTIFICATIONS/TRAINING

Currently studying for my CCNA certification, Present

Ericsson Training Certifications, Richardson, Texas 2012

LTE

WDCDMA

T-Mobile /Intergration Deployment

Central Office Installer Training

Building of DSM switching

Fiber-optic cabling

Text messaging

Computer Science

October CCI Training Inst.

Learned helpdesk Escalation



Contact this candidate