Piping Design Specialist

** ***** ********** ** ******* design of petrochemical, oil & gas and mining. Fully conversant with all aspects of engineering,and construction management, from feasibility study, FEED to detailed design, and construction support, as piping designer, checker to piping stress specialist in major projects. Expertise at design of reaction area, furnace and compressor area.

3D modeling software I have been using: Auto-plant, PDS and CADworx.

Piping stress analysis software I have been using: Autopipe, CAESAR II, SAP-5

2402 4333 Central Blvd 604-***-**** (H)

Burnaby BC V5H 4W8 acze0e@r.postjobfree.com

EDUCATION

1985 Bachelor of Mechanical Engineering in He-Nan University of Scientific-Technological, China

EXPERIENCE

Sept. 2014 - Oct, 2014 DPH Focus, Calgary AB Canada

Piping Specialist

EDAD east SAGD Project.

Fabrication isometrics, support details, special item details and stress isometrics checking. Piping model Checking.

Provided support and job coaching to team members.

Assisted stress engineer to optimize piping layout using AutoPipe

Maintain the material/valve description database

Dec. 2012 - Nov. 2013 Fluor Canada, Vancouver, BC, Canada

Piping Design Specialist

HVC Mill Optimization Project (Dec. 2012 – Jun. 2013).

North End Flotation Building piping and equipment layout.

Checking GA, fabrication isometrics, support details & special item details

Udokan Copper Project (Jun. 2013 –Nov. 2013).

Feasibility study for flotation, solvent extraction & cadmium removal area

Jan. 2012 - Nov. 2012 Fluor Canada, St. John’s, NL, Canada

Piping Specialist

Long Harbor Processing Plant, NL, Canada

CMT Group in St. John’s office

Provided support and job coaching to team members. Project coordination and design review meeting with other disciplines and client representatives

Construction support: Punch list, RFI resolution.

Piping stress analysis using AutoPipe

Performed stress analysis calculation and checked nozzle load to comply with API, ASME and vendor requirements

Maintain the material/valve description database

Travel site to develop detailed piping route and pipe support sketches,

Feb. 2010 - Dec. 2011 Fluor Canada, Vancouver, BC, Canada

Piping Design Specialist

Long Harbor Processing Plant, NL, Canada

Responsible for the port site facilities, concentrate and limestone offloading facilities, storage, concentrate and limestone grinding, sulfuric acid storage and distribution, non-process buildings and utilities, and pipe corridor (worked in PDS).

Piping layout for major acid pipes, and slurry lines.

Prepared ISO’s for stress and updated piping routing accordance with the stress analysis

Sept. 2006 - Feb. 2009 Fluor Canada, Calgary, Alberta, Canada

Piping Design Specialist

Irving Oil Refinery, HUTGU Project, Saint John, NB, Canada (Sep. 2006 – May 2007).

Tie-in Design, Main pipe-rack piping modeling ( PDS )

Sunoco Inc., Toledo Refinery Expansion Project, Ohio, United States (May 2007 - May 2008).

Piping and equipment layout and piping modeling (PDS).

Develop Tie-in design using CloudWorx.

Irving Oil Refinery, Eider Rock Project, Saint John, NB, Canada (May 2008 – Dec. 2008).

Transfer pipe-rack & main pipe-rack study & develop module strategies.

Kuwait National Petroleum Company, KNPC Project, Kuwait (Jan. 2009 – Mar. 2009).

Steam Generation Plant study, module strategies & modeling.

Mar. 2005 - Sep. 2006 SNC-LAVALIN INC., Calgary, Alberta, Canada

Senior Piping Designer

Husky Oil Operations Limited, Tucker Thermal Project, Bonneville, Alberta, Canada (April 2005 – August 2005).

Piping and equipment layout and piping modeling for heat ex-changer structure for water treatment plant(Auto-Plant).

IFC isometrics extraction.

Saudi Aramco, Southern Area Sea Water Expansion Project, Khurais, Saudi Arabia (August 2005 - Sep. 2006).

Developed Plot Plan and equipment location plan, piping and equipment layout and 3D modeling for sea water pump station.

Prepared ISO’s for stress and updated piping routing accordance with the stress analysis

Travel Saudi Aramco site to develop Tie-in design.

Provided support to team members.

Jul. 1985 - Oct. 2004 LPEC, Luo-Yang, He-Nan, China SINO

Senior Piping Engineer/Lead (Feb. 2003 – Sep. 2004)

Lanzhou Petrochemical, 1200 k t/a Hydro-cracking Project for complex, 504kt/a Amine Sweetening, LPG & Gasoline Demercaptan, 924kt/a Sour Water Stripping and 15kt/a Sulfur Recovery Unit

Duties and responsibilities included:

Built piping stress system model by using CAESAR II.

Performed stress analysis calculation and checked equipment nozzle load to comply with API, ASME and vendor requirements

Finalizing stress analysis design basis, critical line list, work procedure, data sheets, support specification & standards

Maintain the material/valve description database

Preparing and updating plant plot plan of the project ( worked in Micro-station and Auto-CAD )

Checking data sheets and relative information, GA and ISO as design input and output

Reviewing drawings in reactor, furnace and compressor area for Hydro-cracking project ( worked in PDS )

Technical trouble shooting in site and coordination with construction team in Lanzhou for 8 month.

Senior Piping Engineer/General Construction supervisor (Nov. 1998 – Feb. 2003)

Projects included Feed Fuel Project for Guangzhou International Airport, Central Heating Project for Luo-Yang National Hi-tech Development District, City Coal Gas Pipeline Project for Luo-Yang City

Duties and responsibilities included:

Preparing and updating plant plot plan of the project

Supervising piping design team and coordinated with other disciplines, vendors and clients in the detail design phase

Preparing design manual and piping material specification based on process and client requirements, design standards and experience

Checking GA and ISO drawings

Technical trouble shooting in site and coordination with construction team

Provided technical consulting for client and as client’s representative reviewed and approved sub-contractors’ construction drawings

Piping Engineer/Piping Lead (1993 – 1998)

Projects included 1,000 k t/a FCC Project for Qingdao Petrochemical Corporation, 1,200kt/a Hydro-cracking Project for Tianjin Petrochemical Complex, 1,400 k t/a FCC Project for Jin-xi Petrochemical Complex, 950kt/a Hydro-cracking Project for Nanjing Petrochemical Complex, 650kt/a Hydro-cracking Project for Jilin Petrochemical Complex

Duties and responsibilities included:

Piping stress analysis using CAESAR II

Performed stress analysis calculation and checked nozzle load to comply with API, ASME and vendor requirements.

Finalizing stress analysis design basis, critical line list, work procedure, data sheets, support specification & standards.

Piping design for reactor area

Providing information to relative disciplines including civil/structure, mechanical, electrical, etc.

Determining nozzle orientation of process equipment and making Squad Checking with other disciplines' drawings, such as equipment assembly, structure, electrical and instrumentation drawings of reaction area

Piping design for pipe-rack area include centrifugal pumps, air coolers Creating equipment and piping models

Preparing data sheet of pipe-rack with vertical and horizontal load of piping to civil engineer

Squad check with relative disciplines drawings related reactor area such as equipment assembly, structure, electrical and instrumentation drawings.

Piping Engineer/Piping Design & Piping Stress (1989 – 1993)

Piping design for pipe works around typical process equipment and pipe-racks.

Piping stress analysis using SAP-5, Prepared spring support list for the following projects

Performed stress analysis calculation and checked equipment nozzle load to comply with API, ASME and vendor requirements

Checking and approving stress documents.

S Project for Japan Gas Corporation (JGC)

Piping design for towers and pumps

35 k Nm3/h Hydrogen Manufacturing Project for Jilin Petrochemical Complex

Piping design for reciprocating compressors, pipe-rack and pumps

1,000kt/a Hydro-cracking Project for Liao-yang Petrochemical Complex

Piping design for reactor and high-pressure heat ex-changers

1,000kt/a FCC Project for Da-qing Petrochemical Complex

Piping design for reactor area

Assistant Piping Engineer/Piping Stress Engineer (1985 – 1989)

Piping stress analysis using SAP-5

Performed stress analysis calculation and checked equipment nozzle load to comply with API, ASME and vendor requirements

ADDITIONAL TRAINING

2003 Training course, PDS, Micro-Station, LPEC, China

1997 Training course, Auto-Plant, LPEC, China

1997 ISO 9000 Quality Assurance System LPEC, China

PROFESSIONAL ASSOCIATIONS

Pressure Piping System, Professional Registration of Examination and Approval, China (2000)



Contact this candidate