CURRICULUM VITAE
Name : Iwan Setiawan
Address - 1 : Jl.Swadaya 2 kali abang Ceger RT 13/02 No.19 Harapan Jaya Bekasi Utara
: Kota Bekasi Telph. 021-******** / Hp085711005191
- 2 : Jl. J A Yani No.5 RT 15/05 Gg.Pemuda Cipaisan Purwakarta
: 41113 Purwakarta Telph. 026-209226 / Hp085711005191 Email : aczdxq@r.postjobfree.com
Place Date of Birth : 04 March 1974
Religion : Muslim
Paspor No : AL083813
Qualification : Mechanical Engineering
Summary of Experience:
Having more than 18 years’ experience as follows :
- Petrochemical Industry 31 2 Years
- Oil and Gas 1 Years
- Mechanical and Piping Engineering High Rise Building Project 7 Years
- Mechanical, Electrical and Piping Drafter High Rise Building and Plan Project 9 Years
Engineering Software Capability:
- Auto CAD 2D & 3D with Mech-Q and 3D Piping Library
- Pipe Data Pro 72
- CAESAR II
- PDMS
Qualification:
Familiar with Piping Engineering Codes & Standards;
- ASME B31.3, Process Piping
- ASME B31.8, Gas Transmission and Distribution Piping Systems
- NFPA 13, Standard for the Installation of Sprinkler Systems Professional Training and Seminar Attended:
- Piping Designer and Engineering, Caesar II, Piping Coded, Piping Matrial, PDMS. Oil Institute November 2016 ~ December 2017
- June 2013, Auto Cad Mechanical 2010, Conduct by Cipta Satria Informatika Autodesk Official Training Courseware (AOTC)
- January 2008, Basic Safety Course and Introduction of SAUDI ARAMCO Standard (SAEP, SAES, SAIC, SATIP, SATR etc.), Conduct by Hyundai Engineering & Construction and Saudi ARAMCO
- July 1994, Electrical and Piping Drafter, Jakarta Engineering School Experience
1. Company : Ssangyong Engineering and Construction As : Mechanical and Piping Engineer
Project : ST Regist Hotel
: Office Capital Place
Period : February 2014 to November 2015
Job Description:
Lead and Communicate Subcontractors and Vendors to assist them in Project Schedule as it pertains
Represent Sunray with Owner’s, Architects, Consultants, Government Authorities, Vendors and Subcontractors.
Manage day to day work progress on site. Monitoring progress and Program.
Build effective working relationships with client and Sunray Project team members
Review the General Contract and Contract Documents and confirm the budget setup and project milestones in conjunction with Project Lead Create a schedule of values and project logs. Plan for project safety and mobilization including review and validation with team members. Maintain the schedule write scopes of work distribute and log subcontractors write required contract riders and purchase orders and confirm compliance with project insurance requirements. Review subcontractors references obtain subcontractors bonds and maintain project files.
Maintain and manage all purchase and delivery schedule change order processes shop drawings document control logs Owners, Architect and Subcontractor correspondence.
Meeting Management.
At lend all schedule and Management MEP meeting necessary to monitor and manage the project chairing as appropriate.
Manage Subcontractor closeout transfer utilities.
2. Company : PT. South Pacific Viscose (Phetrochemical Industry) As : Piping Designer
Project : Waste Sulfuric Acid (WSA Area)
: Waste Water Treatment Plant (WWTP Area)
Period : Sep 2011 to February 2014
Job Description:
Review Drawing from Main Consultan
Modify Process Flow Diagram and P&ID as per process engineering requirement
Review of Design Drawing of General Arrangements Equipment Layout
Review of Design Isometric Drawing include Bill of Material (BOM)
Review of Detail drawing
Providing technical assistance to discipline assigned 3. Company : PT.Jayantara Artha Mandiri
As : ME Engineering
Project : Central Park Jakarta
Period : Jan 2009 to August 2011
Job Description:
Review of Drawing from Main Contractor
Planing Schedule from For contruction Drawing to Shop Drawing
Preparation Planing Create Drawing from For Contruction Drawing to Shop Drawing
Preparation Planing Create Drawing Section and Detail Drawing
Coordination with Arcitec Department for Equipment Foundation, Supports System and arrangement equipment layout
Coordination with Clien about Arrangement Mechanical and Electrical Equipment Layout Drawing
Modification and Adjusting Drawing Ducting, Electrical and Piping at Coordination Drawing MEP
Coordination with vendor engineering on installation process
Modification and Adjusting Drawing Mechanical & Electrical at ceiling elevation at Coordination Drawing Ceiling Plan
Modification Drawing Piping (MVAC, Hydrant, Plumbing, Cable Tray Create Detail, Section Drawing (Shop Drawing) for all item.
Create Detail, Section and Isometric Drawing for Toilet Area
Recording Progress of Approval Forcontruction Drawing and Shop Drawing
4. Company : HYUNDAI Engineering & Construction (Kingdom Saudi Arabia) As : Piping Drafter
Project : Khuraise Gas Centre (Gas Processing and Refinery Project) by Saudi ARAMCO
Period : Feb 2008 to Dec 2008
Job Description:
Review Drawing from Consultan
Modify Process Flow Diagram and P&ID as per process engineering requirement
Review of Design General Arrangements Equipment Layout
Review of Design installation piping process and equipment
Coordination with Civil and Mechanical Department during Structure, foundation and equipment layout
Recording Progress of welding Joint at Welding Joint System Room 4. Company : PT. Jayantara Artha Mandiri
As : Engineering
Project : Pamanukan Trade Centre (High Rise Building)
: Mall Taman Palem (High Rise Building)
: Sentra Grosir Cikarang (High Rise Building)
: Pusat Grosir Cililitan (High Rise Building)
Period : 2003 to 2007
Job Description:
Planning Schedule of Construction Drawing to Shop Drawing
Monitoring Drafter progress
Coordination with civil department Structure, foundation and equipment layout
Modification of Installation MVAC, Plumbing, Fire Hydrant, Sprinkler,
Sound System, Smoke Detector System, CCTV System, Electrical for Shop Drawing
Planning Schedule for As Built Drawing Design General Arrangements Equipment Layout
Preparation Documentation for Hand Over Document 5. Company : Shinryo Indonesia
As : MEP Engineering
Project : JVC Electronic Indonesia
: Kaneta Kogyo Indonesia
: Sanken Indonesia
Period : 2001 to 2002
Job Description:
Check site for Modification Installation MVAC, Plumbing, Fire Hydrant, Sprinkler, Sound System, Smoke Detector System, CCTV System, and Electric Power Penel
Modification Drawing Piping (MVAC, Pipe Hydrant, Plumbing, Cable Tray Create Detail, Section Drawing (Shop Drawing) for all item.
Coordination with civil department Structure, foundation and equipment layout
As Built Drawing
6. Company : Sumi Rubber Indonesia
As : Mechanical Drafter
Project : Sumi Rubber Phase II
Period : 2000 ~ 2001
Job Description:
Modification and Design mechanical equipment for machining and Manufacturing
7. Company : Truba Jurong Engineering
As : Electrical QC
Project : Tanjung Enim Lestari
Period : 1999
Job Description:
Mergering Test Power Cable
Checking Installation of Cable Ladder
Checking Installation of support Cable Ladder
Checking grounding system Installation
Recording Electrical Equipment List base on procedur 8. Company : PT. Taiyo Sinar Raya Teknik
As : Electrical Drafter
Project : Toshiba Electronic Indonesia
: KIA Keramik Mas
: Sumi Rubber Indonesia (DUNLOP)
Period : 1996 to 1998
Job Description:
Review of Drawing for Construction
Design Installation Cable tray for Wiring power cable
Design Installation Cable tray for Wiring secondary power cable / Coordination with Structure Drawing and Architech Drawing
Design Detail Drawing
Planing Schedule As Built Drawing
Preparation Document for Hand Over Document