Post Job Free

Resume

Sign in

Project Manager / Process Engineer

Location:
Grapevine, TX
Posted:
March 20, 2017

Contact this candidate

Resume:

Cell: 817-***-**** E M M A N U E L D E L L E C A S E

aczd02@r.postjobfree.com

https://www.linkedin.com/in/emmanuel-dellecase-54b14032 P R O J E C T MA N A G E R /EN G I N E E R, P M P, M I N I - MB A Process Engineering/Project Management, Oil and Gas

* Chemical engineer

* Facilities design, construction, operation

* Project management

* Flow assurance

* Data analysis and modeling

* Wax, hydrates, scale, asphaltenes

* Process simulation / optimization

* Pipeline hydraulics

Team player, eager to learn, grow and contribute.

Seeking challenging projects, engineering or operations assignments. P R O F E S S I O N A L E X P E R I E N C E

CLOVIS SERVICES LLC, TEXAS 2016 –PRESENT

I N D E P E ND E N T CON T R AC T OR /CON S U L T AN T o Identified hydrate knowledge gaps for major oil company and developed a strategic road-map to optimize pipeline operations and reduce inhibition costs o Engineered and commissioned a tool to enter pipelines under pressure and to provide visual inspections

o Analyzed data on ice formation in O&G pipelines to optimize mitigation costs UNIVERSITY OF TULSA, FLOW ASSURANCE PROJECTS – TULSA, OKLAHOMA 2000 –2015 P R O J E C T E NG I N E E R /MANAG E R

Managed over $30M in flow assurance projects

o Developed innovative project concepts and proposals to support business o Developed detailed scopes and estimated costs/schedules/resources o Managed procurements (RFQs, bid reviews and contractor selections) o Supervised construction of facilities; led commissioning efforts o Created and maintained project documentation and data storage procedures o Controlled projects and verified quality of deliverables

Successfully completed multiple O&G facilities construction on time and budget o High pressure wax deposition three-phase flow facility ($4.5M project) o Relocation of gas hydrate facility from Colorado to Oklahoma ($2M project) o Construction from ground-up of Direct Electrical Heating facility to study safe dissociation of natural gas hydrates ($3M BP project) o Fast-track (1-yr) completion of two flow facilities to study ice deposition in crude oil pipelines in arctic conditions ($7.5M Alyeska project) o Successfully managed completion of multiple smaller projects (small scale wax deposition facility, severe slugging, heavy oil, delayed coking kinetic facility, riser structure, live oil recombination/injection system, autoclaves)

Communicated on all project activities

o Presentations of project proposals, estimates and status as needed o Bi-annual generation of detailed reports and formal presentations o Internal communications and reviews with staff and management o Authored or co-authored 16 publications and presentations at conferences

Performed detailed design of large scale oil and gas facilities o Generated detailed designs, PFDs, P&IDs, piping layouts and CAD drawings o Sized, specified and selected process equipment including tanks, separators, pumps, compressors, heat exchangers, boilers, chillers, flare systems, valves and instrumentation

o Engineered structures, pressure vessels and mechanical systems (#30,000 rocking table, 50’ x 40’ re-inforced concrete building, containment slabs, pipe racks, automatic density-scanner tracking system, 2-story 80’ x 20’ deck-structure)

Efficiently utilized computer technology to improve efficiency and deliverables o Improved wax deposition model software by programming XL VBA-based GUI o Reduced data processing from 6 weeks to a mere hour by developing a program to automate the task

o Developed a program to analyze more than 700 points per second data stream from fiber-optics system and convert data into an engineering format o Programmed control systems and HMIs for multiple process facilities o Created data processing tools to improve data quality and streamline deliverables to sponsors

Responsible for safe operation of pilot facilities o Developed and implemented operating procedures; monitored process data o Trained operators and researchers on safe facility operation o Coordinated operations, maintenance and organized operating staff schedules o Maintained compliance with OSHA, DEQ/EPA regulations; maintained logs and training records

Managed team of technical personnel, students and researchers o Mentored students and monitored work progress w.r.t. research goals o Oversaw data collection, analysis and interpretation as well as the development of computer models (facility simulation software, DEH and inhibitor hydrate dissociation models)

o Developed and taught new graduate Flow Assurance course

Strong attention to safety and environment

o Led and participated in several HAZOP, PHA and safety reviews o Promoted safety culture that resulted in a 15-year accident-free track record o Reduced hydrocarbon run-offs by initiating the installation of two separators and containment slabs where needed

o Participated in the development of SPCC plan and air emission estimates

Computer skills

o MS Office/Project, Process simulation (PIPESIM, HYSYS, OLGA, PVTSim, PRO/II), Design (AutoCAD), SCADA Systems (iFix, RS Logix 5000, OTPO22, Labview), Programming languages (C/C++, Fortran, VBA)

E D U C A T I O N

Project Management Professional (PMP), Mini-MBA

Master in Chemical Engineering

Associate degree in Advanced Automation

Campbell Gas Processing and J.P. Brill Multiphase flow courses Active SPE and PMI member



Contact this candidate