Post Job Free

Resume

Sign in

Lean Manufacturing Engineering

Location:
DeKalb, IL
Posted:
March 16, 2017

Contact this candidate

Resume:

Naga Tadikamalla

*** ***** *****, ** 815-***-**** aczb02@r.postjobfree.com

Professional Summary

Experienced in get ready designing drawings in AutoCAD and SolidWorks.

Implemented kaizen events such as 6S, Kanban, push system, pull system, line balancing & POUS (point of use storage).

Developed an Arena simulation model.

Developed a Matlab program for a single machine scheduling problem.

Calculated cycle times, lead times & takt time to analyze squanders at every workstation by designing a current state map overhauled a future state map.

Adopted various poke-yoke devices to reduce total cycle time and total lead time.

Applied Six Sigma to reduce patient TAT (Turnaround Time).

Adopted DMAIC to improve patient waiting time and file mismatch problems.

Developed BSC (Balance Score Card) using strategic map, SWOT analysis (strengths, weakness, opportunities and threats) and KPI’s (Key Performance Indicator).

Optimum location for a police station was calculated by Minimax Rectangular method and Minisum

Tchebychev methods. .

Identified the areas of improvements using DOWNTIME (lean) and standardized work.

Developed a database using MS access.

Education

Master of Science, Industrial and Systems Engineering Aug’ 15 - May’ 17

Northern Illinois University (NIU), DeKalb, IL Cumulative GPA: 3.33/4.0

BACHELOR of Engineering, Mechanical Engineering Sep’ 11 - May’ 15

MVSR Engineering College, India Cumulative GPA: 3.5/4.0

Course Work & Skills

Facilities planning and Designing, Scheduling and Logistics, Engineering information systems,

Facilities Layout & Location Analysis, Lean manufacturing systems, Six Sigma, Simulation analysis and modelling, Data analytics, Economics analysis, Healthcare systems and Strategic Planning.

Skills

MS Office, Excel, Power point, C, C++, AutoCAD CATIA, Blue J, AutoCAD, CAD/CAM, ANSYS, Minitab, R Programming, JAVA, Solid Works, ARENA, Access, SQL.

Certifications

Logistics by Northern Illinois University.

Integrated manufacturing systems by Northern Illinois University

Work Experience

Graduate Teaching Assistant – Northern Illinois University, DeKalb, IL Aug’ 16-may’17

Developed quantitative and practical concepts to 30 students in an undergraduate level course.

Developed a variety of data for lab work to carry out digital experiments using calibration techniques.

Evaluated tests, homework, laboratory work and held office hours to ensure students understood course concepts

Dans Energy Pvt Ltd may’14 – may’15

Chosen to plan designing drawings in AutoCAD and SolidWorks for detail components, subassemblies and assemblies utilizing bills of materials (BOMs).

Implement and refine manufacturing processes by applying continuous improvement and lean manufacturing principles to all areas of production to increase ROI (return on investment) and enhance throughput.

Conduct simulation modeling and analysis of structural components utilizing CAD techniques.

Work together with authoritative and budgetary groups for creating rules and techniques to enhance guidelines and execution.

Academic Experience

Solid Works

Designed and created a sun oriented water refining plant

Daily 5litres of fresh distilled water was collected for 7 hours of exposure to sun.

A Meta-Heuristic Approach for Modelling a Single Machine Scheduling Problem

Developed a Matlab program for a solitary machine booking issue utilizing meta-heuristic: Genetic Algorithm.

Minimized number of total weighted earliness and tardiness subjected to minimized number of tardy jobs by 26%.

Lean manufacturing systems

Calculated cycle times, lead times, takt time to identified wastes at each workstation through current state mapping and implemented kaizen events such as 6S, Kanban, pull system, cross-functional teams, line balancing & POUS to redesign a future state map.

Improved the throughput by 85 %, decreased deformities by 90% and conveyed a future state mapping (VSM) and Improved generation rate of tubular machining office from 1600 units/month to 2500 units/month by including additional factory and aggregate yield of 3300 units/month by including another machine.

Six Sigma

Applied DMAIC way to deal with longer holding up time and patient record bungle issues

Model use of the arrangement lessened episode events from 30% to 20% at a neighborhood healing center in NIU.

Simulation model to improve the services of a fast food restaurant: Taco Bell

Developed an Arena simulation model based on customer’s arrival, order and process times for certain period of time

Improved the food service waiting time from 268 sec to 94 sec and resource utilization from unimaginable 94% to 74%.

New facility layout and location of NIU Police Station

Collected the wrongdoing reports happened in DeKalb for as far back as 6 months from NIU site

Optimum area for NIU police headquarters was ascertained utilizing Minimax Rectangular technique and Minisum Tchebychev strategy to subside the wrongdoing rate in Northern Illinois University (NIU), DeKalb.

Improving the patient flow at the medical surgical unit in a hospital

Analyzed the typical problems and identified the areas of improvements utilizing DOWNTIME (lean) and proposed lean tools like 5S, Kanban and standardized work.

Invented poke-yoke devices which helped in reducing total cycle time and total lead time

Developed a matlab program using simulated annealing heuristic way to deal with timetable patients to accessible medical attendants for limiting the overabundance time spent on a patient.

Developed an ARENA model based on patient’s arrival time and appointment time.

Developed a database using MS access.

Improved waiting time from 5minutes to 3minutes and resource utilization from incomprehensible 96% to 85%.



Contact this candidate