Post Job Free

Resume

Sign in

Project Manager Professional Experience

Location:
Miami, FL, 33186
Posted:
May 10, 2017

Contact this candidate

Resume:

Santiago Malave, PE

**** ** ***** ***** ***. *** Miami FL 33186

Mobile: 787-***-**** or 305-***-**** E-Mail: acz8ml@r.postjobfree.com Technical Expertise Business Savvy Impeccable Conduct Dedication and drive to succeed CONSTRUCTION MANAGEMENT & ENGINEERING

PROJECT MANAGEMENT VALUE ENGINEERING BUDGETING & PLANNING RESOURCES ALLOCATION PROCUREMENT PROCESS SAFETY BEST PRACTICES SITE/CIVIL ASSESSMENT PERMITS & REGULATIONS Licensed Professional Engineer with a successful trajectory managing complex projects, both as leader and individual contributor, combining technical, business and human aspects to guarantee success. Valuable resource to complete each project with impeccable execution outpacing internal and external benchmarks; monitor all disciplines and each project phase. Trailblazer Legacy:

Plan, Budget and schedule adherence Safety accidents avoidance Up to 40% in cost reductions

+ Profit margins Change orders reductions and avoidance Anticipate and prevent adversity Assertive supervision with zero guarantee claims General contractor and subcontractor experience Develop individual contributors into managers Grow business divisions with up to $70MM in revenue Assume and turnaround projects in default Cultivate team work, build consensus and create partnerships Special projects such as pharmaceuticals clean rooms, high end homes and business start-ups Insist on performance excellence and work ethic Keen mind and understanding of parallel processes Led projects from the design stage to implementation Reviewed and evaluated cost controls to achieve efficiencies and cost reductions including procurement created a Small Jobs Division to strengthen relationships and increase client retention Supervised individual home building projects on private lots Recognized for integrity, quality, efficiency, impeccable delivery and high performance results PROFESSIONAL EXPERIENCE

PROJECT MANAGER – T&G Constructors, Miami, FL (2016 – Present)

Interfaced with clients, permit expediters, architects (Indiana) and with the Structural and MEP consultants. Via phone, electronic communications, written addenda, etc.

Direct communication with owner’s representative during the permit process.

Direct communication with subcontractors.

Worked on institutional project facilities.

Pre-construction services as Scope of Works, Plan Reviews, etc.

Direct coordination during MEP Design process.

Performed fieldworks coordination, reviewed scheduling, procurements and drawings.

Red Team Software Program.

Prepare all RFI’S, Meetings Minutes including with the design team.

Initiated company joint venture new division as Shell Contractor. SUPERINTENDENT – iConstructors, Ft. Lauderdale, FL (2015 – 2016)

Projects interfaced with clients, architects and subcontractors.

Worked on commercial interiors high end projects for banks, health insurances and law firm offices.

Coordinate all inspections thru county website and controls permits drawings for inspector’s approvals.

Performed all fieldworks coordination, reviewed scheduling, procurements and drawings. Prepare all RFI’S in Plan Grid Program. OSHA compliances, conference interstate meetings and reporting.

“Engineer Malavé’s attitude

and spirit is that of “CAN

DO”. I found him to be a

true professional in his

field”. – General Manager

PROFESSIONAL EXPERIENCE (CONTINUED) Santiago Malavé-Vázquez, PE, Page 2 PROJECT MANAGER / SUPERINTENDENT - Villavicencio & Associates / Del Valle Group (2013 – 2014)

Managed all project aspects and interfaced with clients, subcontractors, and other engineers. Collaborated with engineers and technical specialists, achieving goals and maintain solid client relationships.

Performed estimates, oversaw fieldwork, reviewed documentation, cost controls, procurement, scheduling, drawings, RFI’S, Change Order procedures, logistics, staff supervision and quality control, risk management, OSHA compliance, meetings and reporting.

Worked on a variety of challenging projects: Villavicencio & Associates: Eli Lilly – Equalization and MBR Concrete Tanks for Wastewater Systems and Coopervision – Utilities and Manufacturing Buildings. Del Valle Group: Design & Build for the Development of Arecibo Testing Wells; Puerto Nuevo Wastewater Treatment Plant (Grit Collection Facility and Septic Receiving Stations with Roadway Improvements). CONSTRUCTION & PROJECT MANAGER Golden Builders (2005 – 2013)

Developed projects leading all phases: proposals, scheduling, planning, feasibility analysis, drawings, specifications, budgets, SWPPP Inspection Reports, contract management, procedures, metrics, permits, inspections and quality control, ensuring regulatory adherence and surpassing client expectations.

Conferred with subcontractors, clients and their representatives. Assessed contracts, proposals and estimates by performing risk analysis and developing risk plans. Managed office administration to ensure qualified and trained personnel, procedures and documentation compliance and financial stability. GENERAL MANAGER / PROJECT MANAGER / ESTIMATOR & SUPERINTENDENT AIREKO (1984-1988 / 2002 – 2005)

Orchestrated a new Residential Construction Division (Recko Builders) for an established company becoming one of the leaders in the housing construction industry generating over $70MM in contracts.

Supervised Project Managers and formulated the strategic planning to achieve business plan objectives maximizing return and minimizing risk for the company. Implemented performance standards for each department and measured against established goals. In conjunction with staff, established company systems and procedures for reporting, project controls, financial controls, and employee relations.

Led a project with minimal use of subcontractors including: SITEWORKS (20 acres): earthwork, site improvements, wastewater plant, electrical substation, pipe racks for mechanicals & electricals, tanks supports for sprinklers, glycol, water systems and BUILDING (75,000 sf): Warehouse with 8 loading docks, Packaging Area and conveyors installations, Production Area and stainless steel kettles installations, Cafeteria & Kitchen areas with equipments and furniture installations, Mechanical & Electrical Rooms with boilers, air conditioning, pumps among other equipments. SUPERINTENDENT, CONSTRUCTION & PROJECT MANAGER Shamal Construction (1988 – 2002)

Piloted a construction company startup developing over 50 industrial, commercial and institutional projects as General Contractor. Led all project phases from initial proposal and negotiation to delivery and closing ensuring regulatory adherence and surpassing client objectives.

Conferred with subcontractors, clients and their representatives. Assessed contracts, proposals and estimates by performing risk analysis and developing risk plans. PROFESSIONAL EXPERIENCE (CONTINUED) Santiago Malavé-Vázquez, PE, Page 3 PROJECTS SUMMARY (NEW CONSTRUCTION, REMODELING, & EXPANSIONS)

Commercial: Banks (Bank of America, C-1 Bank, Santander, Royal of Canada, Popular & Bayamon Federal), Well Care, IBM, Ford, Caribe Hilton & Albuergue Olympics.

Industrial (Pharmaceuticals & Medical Devices): Eli Lilly, CooperVision, Schering, Lederle, Mennen, CR Bard Implants, Alcon, Nypro, Edwards, Pfizer & Clorox

Institutional: Schools: XXI Century P.R. School Program (Ramón Alejandro Ayala School, Comerio), Saint John Library & Universities: UPR, SUAGM and Inter American. (Several buildings for Engineering, Sciences & Aeronautics Schools including classrooms, laboratories, amphitheaters, etc.)

Residential: Costa Caribe Golf Villas, Velomas, Playa Enterprises, HUD: Housing Urban Development (Multi Story Building for Elderly & PBA: P.R. Public Building Authority (Modernization Housing Improvements). From low cost housing projects to luxury complex.

Government: PRASA: P.R. Aqueduct and Sewer Authority (Design Build for Arecibo Testing Wells, Grit Collection & Sewage Stations in Puerto Nuevo Wastewater Treatment Plant), Municipalities: (Toa Baja (“PR National Volleyball Team Facilities”), Vega Baja (“Electronic Library”), Carolina (“Puerta De La Carolina”), San Juan (“Civil Defense Headquarters”), PRIDCO: P.R. Industrial Development Company (“Various Typical Buildings for Industrials”). DRN: Department of Natural Resources (“Maritime Operations Building including dock facilities”).

For detailed description of above projects, please refer to pages 4-5 “Projects Detailed Description” . EDUCATIONAL BACKGROUND

University Of Puerto Rico, Mayaguez Campus Bachelor of Science in Civil Engineering Professional Development: ARMCO Pre-Engineered Buildings Supervision Course Project Inspection OSHA 30-hour trainings ENGAGEMENTS

College of Engineers and Land Surveyors of Puerto Rico (CIAPR) Supported the CIAPR Basketball Program AGC Board of Directors (PR Association of General Contractors) Vice-president (two terms) SKILLS

Proficient in Plan Grid, Red Team Software, MS Word, MS Excel & MS Outlook Fully Bilingual (English & Spanish)

PROJECTS DETAILED DESCRIPTION Santiago Malavé-Vázquez, PE, Page 4 I- COMMERCIAL:

A- Banks:

- Superintendent (SUP): Santander National Bank - New Branch ($1.5MM). Bank of America, C1 Bank

- SUP: Royal Bank of Canada - Public Bathrooms Remodeling in a 15 Story Building ($2.7MM).

- SUP: Banco Popular - Branch Remodeling ($0.6MM).

- SUP: Bayamon Federal Bank - New Computer Center ($1.8MM). B- Other:

- SUP: IBM - Computers Center Remodeling ($0.7MM).

- Project Manager (PM): Ford - New Dealership with 10 acres parking lot for vehicles distribution ($4.8MM).

- SUP: Caribe Hilton Hotel - Lobby & Entrance Remodeling ($1.1MM).

- SUP: Albuergue Olimpico - New Olympic Museum Building ($1.4MM). II- INDUSTRIAL:

A- Pharmaceuticals, Medical Devices & Light Industrial :

- PM & SUP: Eli Lilly - Civil Works for Equalization & MBR Concrete Tanks ($2.5MM).

- PM & SUP: CooperVision - Civil Works for Manufacturing & Utilities Buildings ($4.0MM).

- SUP: Schering - Production Area Expansion ($1.5MM).

- SUP: Lederle - New Guard House, Entrance Remodeling & New Parking Facilities ($3.0MM).

- PM & SUP: Mennen - 75,000 sf New Building including Warehouse, Packaging, Production, Ofiices, Cafeteria, Mechanical & Electrical Rooms Facilities; plus site improvements for Fire Water & Glycol Steel Tanks, Treatment Plant, etc in a 20 acres Lot ($12MM).

- PM & SUP: CR Bard Implants - Design & Build for 4 Clean Rooms (3.8MM).

- PM & SUP: Alcon - New Clean Room in a building during manufacturing operation (0.8MM).

- SUP: Nypro - Pre Engineered Steel Building for warehouse expansion ($1.2MM).

- SUP: Edwards - Pre Engineered Steel Building for warehouse expansion ($1.4MM).

- SUP: Pfizer - Cafeteria Building Expansion & Remodeling ($1.7MM).

- SUP: Clorox - New Manufacturing & Warehouse Facilities ($2.5MM). III- INSTITUTIONAL:

A- Schools:

- Construction Manager (CM): Infrastructure Financing Administration (AFI) - Design & Build for XXI Century P.R. Education Program with New Buildings & Remodeling for an intermediate school ($7.4MM).

- PM: St. John’s High School - Library Building Expansion during schools operations with concrete Underground cistern ($1.8MM).

B- Universities:

- PM: University of Puerto Rico (UPR) - Concrete Laboratories 3 Story Buildings interconnected with a center Building for public with bathrooms & elevators ($9.4MM).

- PM & SUP: Others - Concrete and steel buildings including siteworks for Engineering, Sciences & Aeronautics Schools including classrooms, laboratories, amphitheaters, etc. for several universities ($40MM). B- Churches:

PM: Antioch Church in Miami Gardens (UPR) – Pre Engineering and Structural Steel Buildings including Sanctuary, Chorus, Storages, Offices, Audiovisual, Public Restrooms Areas & Elevators ($14MM). PROJECTS DETAILED DESCRIPTION (CONTINUED) Santiago Malavé-Vázquez, PE, Page 5 IV- RESIDENTIAL: From low cost housing projects to luxury complex.

- General Manager (GM): Costa Caribe Golf Villas - Luxury villas construction (siteworks not included) ($37MM).

- GM: Velomas - 250 single family units project including siteworks ($21MM).

- SUP: Playa Enterprises - Guest House Building Remodeling in Isla Verde (one of the main tourist area in PR) ($3MM).

- SUP: Housing Urban Development (HUD) - Seven Story Concrete Building for Elderly under Federal Program Funds

($11MM).

- PM: P.R. Public Building Authority (PBA) – Modernization of 75 existing low income houses and a recreational Areas under Federal Funds Program ($3.9MM).

V- GOVERMENT:

- P.R. Aqueduct and Sewer Authority (PRASA):

- PM: Design & Build for Arecibo Testing Wells ($2.5MM).

- PM: Grit Collection & Sewage Stations in Puerto Nuevo Wastewater Treatment Plant (200 MGD Plant) ($20MM).

- SUP: P.R. Industrial Development Company (PRIDCO) - 5 typical steel buildings of 23,000 sf including loading docks & bathrooms lean to areas for Industrials (($4.0MM).

- SUP: Department of Natural Resources (DRN) - Maritime Operations Center including a concrete and a pre engineered buildings plus dock facilities in a environmental protected zone which required permitts and coordination with the US Corps of Engineers ($3.5MM).

- MUNICIPALITIES:

- PM & SUP: Toa Baja (“PR National Volleyball Team Facilities”) - PR Volleyball Federation facilities including offices, dormitories, 3 courts steel building ($7MM).

- PM: Vega Baja (“Electronic Library”) - Interior works in a 3 story Building ($4MM).

-PM & SUP: Carolina (“Puerta De La Carolina”) - Pedestrian bridge above 4 lanes highway to provide elevated garden and “pergola” with a multi purpose area ($6MM).

- SUP: San Juan (“Civil Defense Headquarters”) – Remodeling of bunker facilities ($3.2MM).



Contact this candidate