CURICULUM VITAE
EDWARD SIMBIOSE BANGUN
Bengkong Pltds. No. 18 Batam Indonesia
Telephone : +628**********
Position Applied: Piping Superintendent/Fabrication/ Erection/Commissioning.
KEPODANG GAS DEVELOPMENT CENTRAL PROCESSING(Wellhead Module) and
BECHTEL AUTRALIA PASIFIC LNG CURTIS ISLAND.
Assigned Date : Nov 2013, to marc 2014
Fabrication Site : Mc.Dermott Batam Indonesia
Position : Piping Superintendent.
(Just to Fabrication Spools)
INPEX OPERATIONS AUSTRALIA LTD,UMBILICALS,RISERS & FLOWLINES(URF)
Assigned Date : April 2014, to at present
Fabrication Site : Mc,dermott Batam Indonesia
Position : Piping Superintendent.
RESPONSIBILITIES:
-Prepare to make planning following service system as priority.
-Monitoring erection/installs pipe spools as isometric.
-Monitoring Testing like hydro test, pneumatic test
-Monitoring supervisor & Foreman for Reinstatement after testing
GORGON PROJECT – BARROW ISLAND LNG PLANT Jay Ray McDermott Batam Indonesia
Assigned Date : October 2011, to October 2013
Fabrication Site : McDermott Batam Indonesia
Position :Piping Superintendent
RESPONSIBITIES:
Prepare planning following service system priority
As piping superintendent, I was assigned in installations/erection & prepare for flushing before test, drying/blowing after test, hydro-test, pneumatic test until reinstatement
I was responsible to lead our supervisor, foreman &team
I prepare test packages for testing together with engineering
Coordinate with the client for final acceptance
Prepare continue for reinstatement category B until mc 04 to close Test page
CHEVRON PROJECT LQ & UTILITY MODULES THAILAND & CPP PLATONG GAS II;
Jay Ray Mc.Dermott Batam Indonesia
Assigned Date : august 02, 2009 to 2011
Fabrication Site : McDermott Batam Indonesia
Position :Piping Superintendent
RESPONSIBITIES:
Prepare planning following service system priority
As piping superintendent, I was assigned in pneumatic testing,hydrotest & reinstatement
I was responsible to lead our supervisor, foreman &team
I prepare test packages for testing together with engineering
Coordinate with the client for final acceptance
Prepare continue for reinstatement category B until mc 04 to close Test page
NORTH BELUT CONOCO PHILLIPS CPP PLATFORM Jay Ray McDermott Batam Indonesia
Assigned Date : October 26,2008 to August 01 2009
Fabrication Site : McDermott Batam Indonesia
Position : Piping Supervisor
RESPONSIBITIES:
Prepare planning following service system priority
As piping supervisor, I was assigned in pneumatic testing, hydrotest & reinstatement
I was responsible to lead our foreman &team
I prepare test packages for testing together with engineering
Coordinate with the client for final acceptance
Prepare continue for reinstatement category B until mc 04 to close Test page
SUTUVANG- CPP PLATFORM- Su Tu Field Development Project Cuu Long Vietnam, Jay Ray McDermott Batam Indonesia
Assigned Date : may 15, 2007 to October 25, 2008
Fabrication Site : McDermott Batam Indonesia
Position : Piping Supervisor
KERISI-CONOCO PHILLIPS PROJECT, Jay Ray McDermott Batam Indonesia
Assigned Date : april 01, 2007 to may 10, 2007
Fabrication Site : McDermott Batam Indonesia
Position : piping completion foreman
Woodside-Foster wheeler Project- LNG Liquitfied Natural Gas NWSV Train-V project karatha austrlia, Jay Ray McDermott Batam Indonesia
Assigned Date : marc 08, 2006 to march 2007
Fabrication Site : McDermott Batam Indonesia
Position : pneumatic testing, hydro test foreman
RESPONSIBILITIES:
As piping lead foreman technician under the commissioning department, I was assigned in pneumatic & hydro testing groups under the instruction of our supervisor through field engineer.
I was responsible to lead our group
I prepare test packages for testing
Check the system to ensure that all punch list particularly the category” A” has been done.
Ensure that all material are removed and must take and keeps them to a safe place.
Prepared and installed materials like blind flanges, caps, bolts, hoses which will be used to all limited and endpoint of system
Conduct initial test to find out if there are leak and then repair it if there is.
Coordinate with the client for finally acceptance.
JVPC-Japan Vietnam Petroleum Company CCP Complex; Jay Ray McDermott Batam Indonesia
Assigned Date : May 27, 2002 to September 26, 2003
Fabrication Side: McDermott Batam Indonesia
Position : Production/Commissioning Technician
North Pailin -2 Unocal Thailand CCP PLATFORM; Jay Ray McDermott Batam Indonesia
Assigned Date : April 01, 2001 to may 28, 2002
Fabrication Site : McDermott Batam Indonesia
Position : Production/Commissioning Technician
RESPONSIBILITIES:
Responsible for all the equipment to be use for hydro test
Flashing and drying
Coordinate piping engineer prior for infections
Responsible for all hydro test equipment and make sure that it is completely supplied
Ensure all document, tools, consumable and equipment is available to perform the scope of work
Establish positive working relation with immediate supervision and personnel from other department
Coordinates with client regarding the ready for testing certificates
Total Finaelf Peciko- Kalimantan Indonesia, PT Nippon Steel Indonesia
Assigned Date : March 05,2000 to January 25,2001
Fabrication Site: Nippon Steel Tanjung Uncang Batam Indonesia
Position : production Foreman
RESPONSIBILITIES:
Fit-up Responsible for all the piping installation and Install
Coordinate with piping engineer prior for inspection
and Responsible for all piping alignment, horizontal vertical
Ensure all documents, tools, consumables and equipment is available to perform the scope of work
Unocal Thailand -1 CPP Complex, Jay McDermott Batam Indonesia
Assigned Date : june 01,1997 to November 26,1998
Fabrication Site : McDermott Batam Indonesia
Position : Production Pipe Fitter A
RESPONSIBILITIES:
Fit-up Responsible for all the piping installation and Install
And Responsible for all piping alignment, horizontal vertical
Prepare system for hydro-test
Coordinate Piping Supervisor
Ensure all Document, tools, consumable and equipment is available to perform the scope of work
Woodside – Foster Wheeler Total Bongkot Project, Jay-Ray McDermott Batam Indonesia
Assigned Date: June 18, 1994 to May 13, 1996
Fabrication Side: McDermott Batam Indonesia
Position : Production Pipe Fitter
RESPONSIBILITIES:
Responsible for all the piping installation Fit-up and Install
Fit-up and alignment of pipe
Coordinator with piping foreman and supervisor
Responsible for all piping alignment, horizontal and vertical.
Woodside Project Jacket – Conoco Phillips & Pogo Project, Jay Ray McDermott Batam Indonesia
Assigned Date : 08, August, 1991 to July 31, 1993
Fabrication site : McDermott Batam Indonesia
Position : Production Pipe Fitter
RESPONSIBILITIES:
Responsible for all the piping installation Fit-up and install
Fit-up and alignment of the Pipe
Coordinate with piping foreman and supervisor
Responsible for all alignment horizontal and vertical.
EDUCATIONAL BACKGROUND:
1979-1985 : Elementary School Berastagi Medan : Graduated
1985-1988 : Junior High school Berastagi Medan : Graduated
1988-1991 : Senior High school Technical Berastagi Medan : Graduated
CERTIVFICATE TRAINING & APPRECIATION
Woodside’s Goodwyn A Jacket, October 1992
Safety Worker Award, Jan.1997
Conoco Phillips for KERISI CPP-MCF, may 2007
SU TU VANG-EPCI PROJECT R2837[ONSHORE/OFFSHORE, October 2008
WOODSIDE ENERGY NWS LNG-V EXPANSION, oct 2005-may 2007
NORT BELUT PROJECT, onshore & offshore, November 2008
CHEVRON LG-UTILITY& CPP PLATONG GAS II PROJECT PASS II
Certificate MTS
Certificate IIF[Incident and Injury Free
Certificate IIF Coaching
Productivity Through People
Certificate Of Training Basic Offshore, Emergency Training& Travel Safety By Boat, HUET, Sea Survival, Fire Fighting and Self Rescue, Boat Travel and Emergencies, Safety Induction, TEMPSC Familiarisation.
PERSONAL BACKGROUND:
Name : Edward Simbiose Bangun
Date of birth : October 17, 1971
Sex : Male
Civil status : Married
Citizenship : Indonesia
Religion : Christian
Height/Weight : 5’ 4” / 124 lbs.
Passport # : W 980140
Date Issued : 11 MARCH 2011
Date expiry : 11 MARCH 2016
CHARACTER REFERENCES:
Marc Naquin
Piping Superintendent
PT McDermott Indonesia
Tel # +628********
Batam, Indonesia
Pablo Varona
Hook up – commissioning manager
PT McDermott Indonesia
Tel # +628*********
Batam, Indonesia
Arnel Velasco
Piping Inspector Supervisor
Cuulong sutuvang
PT McDermott Indonesia
Tel. # +628**********
Batam, Indonesia
Gary Volcovicas
Piping Superintendent
North Belut CPP Top Side
PT McDermott Indonesia
Batam, Indonesia
Jun A Pedragosa
Manager Commissioning
Kerisi project by Conoco Phillips
Tel. # +628**********
PT McDermott Indonesia
Batam, Indonesia
Anthony Lobb
PTMI Snr Const Manager
Batam,Indonesia.
CURRICULUM VITAE
PERSONAL DATA
Name : JON KEYAKINAN PARANGIN ANGIN
Place / Date of Birth : Kabanjahe, 23 June 1986
Nationality : Indonesia
Sex : Male
Religion : Moslem
Marital Status : Married
Education : Senior Technical High School
Address : Bengkong Otorita Jl. Mentok No. 9 Tanjung Buntung
Kota Batam
Contact Number : +62-899-****-*** / +62-812-****-****
CERTIFICATE OF COMPETENCY
Certificate of Safety Recognition to Million Works Hours Without A LTI at the APLNG Mod yard, Batam Indonesia on 02 April 2014.
Certificate of Competency in Basic Rigging at Craft Training Center PT. McDermott Indonesia, Batam No. CC0708 on 28 September 2009.
Certificate of Confined Space Entry and Permit to Work Course at Industrialindo Kosnsultrain Services. Certificate No. PTW.10982/IKS/07. Held in Batam on 13 Auguts 2007.
Hereby Extend this token of Apreciation at PT. McDermott/J. Ray McDermott & Conocophilips, Indonesia on 27 July 2009.
Certificate of Apreciation for Outstanding Performance and Continued Suport during the Offshore Contruction Phase of SU TU VANG-EPCI Project at J.Ray McDermott, AS on October 2008.
Certificate of IRM has Succesfully and diligenty Performed Hydrotest & Pneumatic tes for Cuulong Joint Operating Company SU TU VANG Project.
WORKING EXPERIENCE
1.Name Of Company : PT. DRESINDO HARAPAN SUKSES
Classification : Pipe Fitter
Project Location : Bechtel APLNG Module Yard, Kabil - Batam
Period of Services : 17 June 2013 until 20 September 2014
Reason of Leaving : Finish Project
2.Name Of Company : PT. WORLD WIDE EQUIPMENT SOUTH EAST ASIA
Classification : Fitter
Project Location : Batu Ampar - Batam
Period of Services : 21 January 2013 until 16 April 2013
Reason of Leaving : Contract Completed
3.Name Of Company : PT. GLOBAL PROCESS SYSTEM
Classification : Pipe Fitter
Project Location : Sekupang - Batam
Period of Services : 08 March 2012 until 30 November 2012
Reason of Leaving : Retrenchment
4.Name Of Company : PT. MCDERMOTT INDONESIA
Classification : Pipe Fitter C
Project Location : PT. McDermott Indonesia – Batam Base
Period of Services : 15 May 2009 to 17 November 2011
Reason of Leaving : Retrenchment
5.Name Of Company : PT. CONOCO PHILIPS INDONESIA INC. LTD.
Classification : Piping Technician
Project Location : Kerisi CPP-MSG Project, PT. McDermott Indonesia
Period of Services : February 2007 until July 2007
Reason of Leaving : Finish Job
6.Name Of Company : PT. MCDERMOTT INDONESIA
Classification : Pipe Fitter B
Project Location : PT. McDermott Indonesia – Batam Base
Period of Services : 08 September 2006 until 02 April 2009
Reason of Leaving : Retrenchment
Sincerely Yours,
JON KEYAKINAN PARANGIN ANGIN
CURRICULUM VITAE
PERSONAL DATA :
Name : ADITIA IMANUEL SEMBIRING
Place/Date of birth : Barus Julu, January 14th 1992
Education : Senior High Scool
Nationality : Indonesian
Religion : Christian
Sex : Male
Marital Status : Single
NPWP No. : 46.554.815.4.215.000
Address : Komp. Dam Muka Kuning, Rt.004/Rw.015
Kel. Muka Kuning, Kec. Sungai Beduk
Phone : +62-821-****-****
Email : acz6sy@r.postjobfree.com
CERTIFICATE OF COMPETECY
> Certificate of Achiebement EST Group's Grip Tight, Test Plugs Module II
Training by Curtiss Wright by PT. DHS PT. Some Indonesia Kabil
> Certificate of Safety Recognition 10 Milian Work Hours Without A LTI
> Certificate of Achiebement EST Group's Grip Tight Test Plugs. By PT. McDermott
Batam Yard, Indonesia.
> Certificate is Mc Piping Technician ( Hydrotest/Pneumatic/GALT)
> Certificate Training Course " Assembling and Tightening Bolt Connectionss"
( Hydratight by PT.McDermott Indonesia )
WORK EXPERIENCE:
1. Company : PT. DRESINDO HARAPAN SUKSES
Project Location : Bechtel APLNG Module Yard
PT. Smoe Indonesia Kabil - Batam
Clasification : Pipe Fitter
Period Service : June 17'h 2013 up to June 16th 2014
Reason of Leaving : Finish Contract
2. Company : PT. McDERMOTT INDONESIA
Project Location : PT. McDermott Indonesia Batam Base
Clasification : Pipe Coin. Tech
Period Service : March 05th 2012 up to 15 April 2013
Reason of Leaving : Retrenchment
3. Company : PT. GLOBAL PROCESS SYSTEMS
Project Location : PT. Global Process Systems - Sekupang
Clasification : Pipe Fitter
Period Service : May 08d' 2011 up to November 30th 2011
Reason of Leaving : Retrenchment
Your Faithfully
(ADITIA IMANUEL SEMBIRING)
BEREN MEJEMAT TARIGAN
Mobile Phone: 081*********
Email: acz6sy@r.postjobfree.com
CURRICULUM VITAE
Personal Detail
Name : Beren Mejemat Tarigan
Place & Date of Birth : Tj.Barus, 1th July 1989
Status : Single
E-mail :acz6sy@r.postjobfree.com
Phone : 081*********
Address : Bengkong Otorita Jln.Mentok
No 9.Batam 29432
Mechanical Completion, Pre-Commissioning.
Formal Education
2003 – 2006 : Senior High School SMK Negeri 1 Berastagi
2000 – 2003 : Junior High School Adven Barus Julu
1994 – 2000 : Elementary School Negeri 1 Tj.Barus
Certification And Training
Permit to Work System by PT.McDERMOTT
Confined Space safe Strategy, roles and responsibilities by PT.McDERMOTT
Hazard Indentification Tool (HIT) by PT.McDERMOTT
Hydro & Pneumatic Testing by PT.McDERMOTT
Manual Torque Tightening Hydratight by PT.McDERMOTT
EST Group’ GripTight’TM Test Plugs by CURTISS WRIGHT
Certificate of Safety Recognition by APLNG Bechtel
IIF Commitment Certificate by Gorgon Project Australia
Safety Recognation by APLNG Mod Yard
Working Experience
Working at PT.SMOE Indonesia
Period : September 2013 – September 2014 ( Project APLNG)
Purpose : Permanently Working
Position : Pipe Fitter
Working at PT.Mcdermott Indonesia
Period : March 2012 – August 2013( Project Gorgon (PARs_PAUs) - Gorgon Australia)
Purpose : Permanently Working
Position : Technician Leaktest
Position : Technician Hydro & Pneumatic Testing
Position : Technician Retro Jetting & Blowing
Working at PT.Mcdermott Indonesia
Period : Feb 2010 – March 2011 (Project Esso – Kipper Tuna Turrum Project)
Purpose : Permanently Working
Position : Technician Preservation
Position : Technician Hydro & Pneumatic Testing
Position : Technician Retro Jetting & Blowing
Position : Technician Tubing Test
Working at PT.Universal Karya Mandiri
Period : May 2008 – July 2008 ( Project by PT.Global Procces Syistems )
Purpose : Contract
Position : Pipe Fitter
Position : Pipe Punchlist
JOB DESCRIPTION
Position : Technician Preservation
Job description :
Pickling Pipe Spool and Valves
Cleaning inside and outside Pipe Spool and Valves
Cover Equipment,Turbin,Valves,and Pipe Spool
keep all the goods from the vendor to complete the installation in order to maintain the quality of manufacturing as new
Position : Technician Hydro & Pneumatic Testing
Job description :
Preparing Packages for Testing
Reviewing Test Packages and preparing for testing materials
Performing pre-test reviews prior to pressure testing, and verifying system is prepared for test
Witnessing pressure testing
Witnessing Flushing, Blowing, and Drying
Restoring system to pre-test set-up (replaces valves, valve internals, remove test blanks, remove test blinds and complete flange torqueing )
Can do Retrojetting, Flushing, and Drying after or before testing
Specialties piping; testing
Position : Technician Retro Jetting & Blowing
Job description :
designing, producing and finishing decorative pieces, including windows, mirrors, lamp bases, ornaments, tableware and sculptures;
-working with molten glass (from a furnace) and a blowing iron to form the glass into a rough shape;
-kiln forming - slumping glass into a mould;
-recycling scraps (cullet) from larger producers;
-soldering pieces of coloured, painted or enamelled glass;
-using decorative techniques, including engraving, acid-etching, stencilling, sand or grit blasting;
-restoring, renovating and repairing original pieces;
-selling wares directly to customers or stockists, from a studio, shop or gallery;
-networking to establish effective contacts in one's own specialist market;
-attending training courses to keep abreast of technological, scientific and innovative advances in the industry and to learn new techniques;
-researching and monitoring the worldwide glass market to ensure products are current, in demand and reasonably priced;
-attending craft fairs and exhibitions;
-giving live demonstrations of production of work before selling;
-producing a catalogue or portfolio of designs for publicity purposes.
Personality
Good attitude, Kind, Communicative, Diligent, Tolerant, Target Oriented, be Responsible.
I authorized that the declaration stated by me on this curriculum vitae is investigated. Reponses and information given here are true and correct to the best my knowledge.
I understand that false or misleading information or any fact may result in rejection of this application.
Regards;
Beren Mejemat Tarigan
CURRICULUM VITAE
PERSONAL DATA :
Name : RUDIYANTO
Place of Brith : Cilacap, March 22, 1972
Marital Status : Married
Religion : Moslem
Nationality : Indonesia
Education : High School
Address : Perum GMP 1 Blok H-15 RT 04 RW 03 Batu Ampar, Batam
No Telephone : 082*-****-****
Qualification : Piping Dept
EXPERIENCE IN WORKING
1.Fabrication Spool / Pipe
2.Erection & Installation Spool / Pipe
3.Punch List
4.Hydro Test
5.Pneumatic Test
6.Leak Test
7.Reinstatment
8.Pipe Alignment
9.Line Work
TRAINING EXPERIENCE
1.M & O INDONESIA
Certification Of Competency In :
* BOSIET ( Basic Offshore Safety Induction & Emergency Training )
2. MSTS ASIA SDN . BHD.
Certification Of Compentency In :
* COMBINED SEA SURVIVAL, FIRE FIGHTING & FIRST AID
3. PT. MC DERMOTT INDONESIA- CRAFT TRAINING CENTER
Certification Of Compentency In :
* HYDRO TEST & PNEUMATIC TEST
4. MCCS ( Mechanical Completion Commissioning Service ) INTERNATIONAL
Certification Of Competency In :
* HYDRO TEST & PNEUMATIC TEST
5. PT. MC DERMOTT INDONESIA - CRAFT TRAINING CENTER
Certification Of Competency In :
“ ASSEMBLING AND TIGHTENING BOLTED CONECTION “
Has attended theory and practical sessions for :
* FLANGE ASSEMBLY
* MANUAL TORQUE TIGHTENING
* HYDRAULIC TORQUE TIGHTENING
* HYDRAULIC BOLT TENSIONING
6. PT. MC DERMOTT INDONESIA - CRAFT TRAINING CENTER
Certification Of Competency In :
* LIGHT RIGGING
* BASIC RIGGING
7. PT. MC DERMOTT INDONESIA - CRAFT TRAINING CENTER
Certification Of Competency In :
* I I F ( Incident & Injury Free )
AWARDS IS PRESENTED
PT. MC DERMOTT INDONESIA
SERVICE AWARD 5 YEARS
SAFETY CHAMPION AT PROJECT CHEVRON PLATONG GAS II OFFSHORE THAILAND
QUALITY AWARD AT PROJECT ESSO KIPPER TUNA TURRUM GAS
SAFETY EXECELLENCE AT PROJECT MAERSK PEREGRINO FPSO
WORK EXPERIENCE
1. Company : PT. MC DERMOTT INDONESIA
Periode of Service : February 18,2007 to February 23, 2015
Project Location : * CPP (Central Processing Platform) ARTHIT PROJECT
Fabricasy in Batam & Offshore Thailand
* CPP ( Central Processing Platform ) SU TU VANG PROJECT
Fabricasy in Batam & Offshore Field Vietnam
* CPP ( Central Processing Platform ) NORTH BELUT PROJECT
Fabricasy in Batam & Offshore Field Natuna
* CHEVRON UTILITY DECK & PLLQ 2 PROJECT
Fabricasy in Batam & Offshore Field Thailand
* CHEVRON PLATONG GAS II PROJECT
Fabricasy in Batam & Offshore Field Thailand
* MAERSK PEREGRINO FPSO PROJECT
Fabricasy in Batam
* ESSO KIPPER TUNA TURRUM GAS PROJECT
Fabricasy in Batam
* GORGON PROJECT
Fabricasy in Batam
* KEPODANG PROJECT
Fabricasy in Batam & Offshore Field Indonesia
Classification : Pipe Fitter Foreman
Reason For Leaving : Contract Completion
2. Company : PT. WAIJO
Periode Of Service : June 14, 2005 to March 31,2006
Project Location : Trans Pasific Pertochemical Indotama ( TPPI )
Tuban Auromatic Project East Java
Classification : Pipe Fitter Foreman
Reason for Leaving : Contract Completion
3. Company : PT. CAHAYA MITRA SEHATI
Periode Of Service : June 22,1999 to January 26,2000
Project Location : PT. Pisma Putra Tex – Pekalongan
Classification : Pipe Fitter Foreman
Reason For Leaving : Contract Completion
4. Company : PT. SUMBER ARTO ENGINEERING
Periode Of Service : December 27,1997 to September 15,1998
Project Location : Asahimas Clas New Factory, Cikampek
Classification : Pipe Fitter Foreman
Reason For Leaving : Contract Completion
5. Company : PT. BOSKALIS INTERNATIONAL bv
Periode Of Service : August 22,1997 to December 14,1997
Project Location : PLTU’s Tanjung Jati Project at Jepara
Central Java, Indonesia
Classification : Mechanical
Reason For Leaving : Contract Completion
6. Company : PT. MITRA PRIMA INTIPERDANA
Periode Of Service : September 10,1996 to January 11,1997
Project Location : PT. Sinar Sosro – Cakung
Classification : Pipe Fitter Foreman
Reason For leaving : Contract Completion
7. Company : PT. CAHAYA MITRA SEHATI
Periode Of Service : March 22,1996 to January 5,1996
Project Location : PT. Kasen Nozzle Ejip – Cikarang
Classification : Pipe Fitter Foreman
Reason For Leaving : Contract Completion
8. Company : PT. KARYA GATRA PADUTAMA
Periode Of Service : November 3, 1995 to March 3 1996
Project Location : Nakakin Ejip Cikarang
Classification : Pipe Fitter 1
Reason For Leaving : Contract Completion
9. Company : PT. TAIYO SINAR RAYA TEKNIK
Periode Of Service : May 16,1995 to October 16,1995
Project Location : PT. Indonesia Toray Synthetic 10 P Tangerang
Classification : Piping Instrumentation
Reason For Leaving : Contract Completion
10. Company : HAM PT. RANGKA RUANG
Periode Of Service : April 25,1994 to April 18,1995
Project Location : Project SPM “HAM 461” Cilacap
Classification : Pipe Fitter 1
Reason For Leaving : Contract Completion
The Above Information is true and correct to the best my knowledge it is understood that above personal date be unshed record of my experience condition reference.
Batam,
Your Sincerely
RUDIYANTO