CURICULUM VITAE

EDWARD SIMBIOSE BANGUN

Bengkong Pltds. No. 18 Batam Indonesia

Telephone : +628**********

Position Applied: Piping Superintendent/Fabrication/ Erection/Commissioning.

KEPODANG GAS DEVELOPMENT CENTRAL PROCESSING(Wellhead Module) and

BECHTEL AUTRALIA PASIFIC LNG CURTIS ISLAND.

Assigned Date : Nov 2013, to marc 2014

Fabrication Site : Mc.Dermott Batam Indonesia

Position : Piping Superintendent.

(Just to Fabrication Spools)

INPEX OPERATIONS AUSTRALIA LTD,UMBILICALS,RISERS & FLOWLINES(URF)

Assigned Date : April 2014, to at present

Fabrication Site : Mc,dermott Batam Indonesia

Position : Piping Superintendent.

RESPONSIBILITIES:

-Prepare to make planning following service system as priority.

-Monitoring erection/installs pipe spools as isometric.

-Monitoring Testing like hydro test, pneumatic test

-Monitoring supervisor & Foreman for Reinstatement after testing

GORGON PROJECT – BARROW ISLAND LNG PLANT Jay Ray McDermott Batam Indonesia

Assigned Date : October 2011, to October 2013

Fabrication Site : McDermott Batam Indonesia

Position :Piping Superintendent

RESPONSIBITIES:

Prepare planning following service system priority

As piping superintendent, I was assigned in installations/erection & prepare for flushing before test, drying/blowing after test, hydro-test, pneumatic test until reinstatement

I was responsible to lead our supervisor, foreman &team

I prepare test packages for testing together with engineering

Coordinate with the client for final acceptance

Prepare continue for reinstatement category B until mc 04 to close Test page

CHEVRON PROJECT LQ & UTILITY MODULES THAILAND & CPP PLATONG GAS II;

Jay Ray Mc.Dermott Batam Indonesia

Assigned Date : august 02, 2009 to 2011

Fabrication Site : McDermott Batam Indonesia

Position :Piping Superintendent

RESPONSIBITIES:

Prepare planning following service system priority

As piping superintendent, I was assigned in pneumatic testing,hydrotest & reinstatement

I was responsible to lead our supervisor, foreman &team

I prepare test packages for testing together with engineering

Coordinate with the client for final acceptance

Prepare continue for reinstatement category B until mc 04 to close Test page

NORTH BELUT CONOCO PHILLIPS CPP PLATFORM Jay Ray McDermott Batam Indonesia

Assigned Date : October 26,2008 to August 01 2009

Fabrication Site : McDermott Batam Indonesia

Position : Piping Supervisor

RESPONSIBITIES:

Prepare planning following service system priority

As piping supervisor, I was assigned in pneumatic testing, hydrotest & reinstatement

I was responsible to lead our foreman &team

I prepare test packages for testing together with engineering

Coordinate with the client for final acceptance

Prepare continue for reinstatement category B until mc 04 to close Test page

SUTUVANG- CPP PLATFORM- Su Tu Field Development Project Cuu Long Vietnam, Jay Ray McDermott Batam Indonesia

Assigned Date : may 15, 2007 to October 25, 2008

Fabrication Site : McDermott Batam Indonesia

Position : Piping Supervisor

KERISI-CONOCO PHILLIPS PROJECT, Jay Ray McDermott Batam Indonesia

Assigned Date : april 01, 2007 to may 10, 2007

Fabrication Site : McDermott Batam Indonesia

Position : piping completion foreman

Woodside-Foster wheeler Project- LNG Liquitfied Natural Gas NWSV Train-V project karatha austrlia, Jay Ray McDermott Batam Indonesia

Assigned Date : marc 08, 2006 to march 2007

Fabrication Site : McDermott Batam Indonesia

Position : pneumatic testing, hydro test foreman

RESPONSIBILITIES:

As piping lead foreman technician under the commissioning department, I was assigned in pneumatic & hydro testing groups under the instruction of our supervisor through field engineer.

I was responsible to lead our group

I prepare test packages for testing

Check the system to ensure that all punch list particularly the category” A” has been done.

Ensure that all material are removed and must take and keeps them to a safe place.

Prepared and installed materials like blind flanges, caps, bolts, hoses which will be used to all limited and endpoint of system

Conduct initial test to find out if there are leak and then repair it if there is.

Coordinate with the client for finally acceptance.

JVPC-Japan Vietnam Petroleum Company CCP Complex; Jay Ray McDermott Batam Indonesia

Assigned Date : May 27, 2002 to September 26, 2003

Fabrication Side: McDermott Batam Indonesia

Position : Production/Commissioning Technician

North Pailin -2 Unocal Thailand CCP PLATFORM; Jay Ray McDermott Batam Indonesia

Assigned Date : April 01, 2001 to may 28, 2002

Fabrication Site : McDermott Batam Indonesia

Position : Production/Commissioning Technician

RESPONSIBILITIES:

Responsible for all the equipment to be use for hydro test

Flashing and drying

Coordinate piping engineer prior for infections

Responsible for all hydro test equipment and make sure that it is completely supplied

Ensure all document, tools, consumable and equipment is available to perform the scope of work

Establish positive working relation with immediate supervision and personnel from other department

Coordinates with client regarding the ready for testing certificates

Total Finaelf Peciko- Kalimantan Indonesia, PT Nippon Steel Indonesia

Assigned Date : March 05,2000 to January 25,2001

Fabrication Site: Nippon Steel Tanjung Uncang Batam Indonesia

Position : production Foreman

RESPONSIBILITIES:

Fit-up Responsible for all the piping installation and Install

Coordinate with piping engineer prior for inspection

and Responsible for all piping alignment, horizontal vertical

Ensure all documents, tools, consumables and equipment is available to perform the scope of work

Unocal Thailand -1 CPP Complex, Jay McDermott Batam Indonesia

Assigned Date : june 01,1997 to November 26,1998

Fabrication Site : McDermott Batam Indonesia

Position : Production Pipe Fitter A

RESPONSIBILITIES:

Fit-up Responsible for all the piping installation and Install

And Responsible for all piping alignment, horizontal vertical

Prepare system for hydro-test

Coordinate Piping Supervisor

Ensure all Document, tools, consumable and equipment is available to perform the scope of work

Woodside – Foster Wheeler Total Bongkot Project, Jay-Ray McDermott Batam Indonesia

Assigned Date: June 18, 1994 to May 13, 1996

Fabrication Side: McDermott Batam Indonesia

Position : Production Pipe Fitter

RESPONSIBILITIES:

Responsible for all the piping installation Fit-up and Install

Fit-up and alignment of pipe

Coordinator with piping foreman and supervisor

Responsible for all piping alignment, horizontal and vertical.

Woodside Project Jacket – Conoco Phillips & Pogo Project, Jay Ray McDermott Batam Indonesia

Assigned Date : 08, August, 1991 to July 31, 1993

Fabrication site : McDermott Batam Indonesia

Position : Production Pipe Fitter

RESPONSIBILITIES:

Responsible for all the piping installation Fit-up and install

Fit-up and alignment of the Pipe

Coordinate with piping foreman and supervisor

Responsible for all alignment horizontal and vertical.

EDUCATIONAL BACKGROUND:

1979-1985 : Elementary School Berastagi Medan : Graduated

1985-1988 : Junior High school Berastagi Medan : Graduated

1988-1991 : Senior High school Technical Berastagi Medan : Graduated

CERTIVFICATE TRAINING & APPRECIATION

Woodside’s Goodwyn A Jacket, October 1992

Safety Worker Award, Jan.1997

Conoco Phillips for KERISI CPP-MCF, may 2007

SU TU VANG-EPCI PROJECT R2837[ONSHORE/OFFSHORE, October 2008

WOODSIDE ENERGY NWS LNG-V EXPANSION, oct 2005-may 2007

NORT BELUT PROJECT, onshore & offshore, November 2008

CHEVRON LG-UTILITY& CPP PLATONG GAS II PROJECT PASS II

Certificate MTS

Certificate IIF[Incident and Injury Free

Certificate IIF Coaching

Productivity Through People

Certificate Of Training Basic Offshore, Emergency Training& Travel Safety By Boat, HUET, Sea Survival, Fire Fighting and Self Rescue, Boat Travel and Emergencies, Safety Induction, TEMPSC Familiarisation.

PERSONAL BACKGROUND:

Name : Edward Simbiose Bangun

Date of birth : October 17, 1971

Sex : Male

Civil status : Married

Citizenship : Indonesia

Religion : Christian

Height/Weight : 5’ 4” / 124 lbs.

Passport # : W 980140

Date Issued : 11 MARCH 2011

Date expiry : 11 MARCH 2016

CHARACTER REFERENCES:

Marc Naquin

Piping Superintendent

PT McDermott Indonesia

Tel # +628********

Batam, Indonesia

Pablo Varona

Hook up – commissioning manager

PT McDermott Indonesia

Tel # +628*********

Batam, Indonesia

Arnel Velasco

Piping Inspector Supervisor

Cuulong sutuvang

PT McDermott Indonesia

Tel. # +628**********

Batam, Indonesia

Gary Volcovicas

Piping Superintendent

North Belut CPP Top Side

PT McDermott Indonesia

Batam, Indonesia

Jun A Pedragosa

Manager Commissioning

Kerisi project by Conoco Phillips

Tel. # +628**********

PT McDermott Indonesia

Batam, Indonesia

Anthony Lobb

PTMI Snr Const Manager

Batam,Indonesia.

CURRICULUM VITAE

PERSONAL DATA

Name : JON KEYAKINAN PARANGIN ANGIN

Place / Date of Birth : Kabanjahe, 23 June 1986

Nationality : Indonesia

Sex : Male

Religion : Moslem

Marital Status : Married

Education : Senior Technical High School

Address : Bengkong Otorita Jl. Mentok No. 9 Tanjung Buntung

Kota Batam

Contact Number : +62-899-****-*** / +62-812-****-****

CERTIFICATE OF COMPETENCY

Certificate of Safety Recognition to Million Works Hours Without A LTI at the APLNG Mod yard, Batam Indonesia on 02 April 2014.

Certificate of Competency in Basic Rigging at Craft Training Center PT. McDermott Indonesia, Batam No. CC0708 on 28 September 2009.

Certificate of Confined Space Entry and Permit to Work Course at Industrialindo Kosnsultrain Services. Certificate No. PTW.10982/IKS/07. Held in Batam on 13 Auguts 2007.

Hereby Extend this token of Apreciation at PT. McDermott/J. Ray McDermott & Conocophilips, Indonesia on 27 July 2009.

Certificate of Apreciation for Outstanding Performance and Continued Suport during the Offshore Contruction Phase of SU TU VANG-EPCI Project at J.Ray McDermott, AS on October 2008.

Certificate of IRM has Succesfully and diligenty Performed Hydrotest & Pneumatic tes for Cuulong Joint Operating Company SU TU VANG Project.

WORKING EXPERIENCE

1.Name Of Company : PT. DRESINDO HARAPAN SUKSES

Classification : Pipe Fitter

Project Location : Bechtel APLNG Module Yard, Kabil - Batam

Period of Services : 17 June 2013 until 20 September 2014

Reason of Leaving : Finish Project

2.Name Of Company : PT. WORLD WIDE EQUIPMENT SOUTH EAST ASIA

Classification : Fitter

Project Location : Batu Ampar - Batam

Period of Services : 21 January 2013 until 16 April 2013

Reason of Leaving : Contract Completed

3.Name Of Company : PT. GLOBAL PROCESS SYSTEM

Classification : Pipe Fitter

Project Location : Sekupang - Batam

Period of Services : 08 March 2012 until 30 November 2012

Reason of Leaving : Retrenchment

4.Name Of Company : PT. MCDERMOTT INDONESIA

Classification : Pipe Fitter C

Project Location : PT. McDermott Indonesia – Batam Base

Period of Services : 15 May 2009 to 17 November 2011

Reason of Leaving : Retrenchment

5.Name Of Company : PT. CONOCO PHILIPS INDONESIA INC. LTD.

Classification : Piping Technician

Project Location : Kerisi CPP-MSG Project, PT. McDermott Indonesia

Period of Services : February 2007 until July 2007

Reason of Leaving : Finish Job

6.Name Of Company : PT. MCDERMOTT INDONESIA

Classification : Pipe Fitter B

Project Location : PT. McDermott Indonesia – Batam Base

Period of Services : 08 September 2006 until 02 April 2009

Reason of Leaving : Retrenchment

Sincerely Yours,

JON KEYAKINAN PARANGIN ANGIN

CURRICULUM VITAE

PERSONAL DATA :

Name : ADITIA IMANUEL SEMBIRING

Place/Date of birth : Barus Julu, January 14th 1992

Education : Senior High Scool

Nationality : Indonesian

Religion : Christian

Sex : Male

Marital Status : Single

NPWP No. : 46.554.815.4.215.000

Address : Komp. Dam Muka Kuning, Rt.004/Rw.015

Kel. Muka Kuning, Kec. Sungai Beduk

Phone : +62-821-****-****

Email : acz6sy@r.postjobfree.com

CERTIFICATE OF COMPETECY

> Certificate of Achiebement EST Group's Grip Tight, Test Plugs Module II

Training by Curtiss Wright by PT. DHS PT. Some Indonesia Kabil

> Certificate of Safety Recognition 10 Milian Work Hours Without A LTI

> Certificate of Achiebement EST Group's Grip Tight Test Plugs. By PT. McDermott

Batam Yard, Indonesia.

> Certificate is Mc Piping Technician ( Hydrotest/Pneumatic/GALT)

> Certificate Training Course " Assembling and Tightening Bolt Connectionss"

( Hydratight by PT.McDermott Indonesia )

WORK EXPERIENCE:

1. Company : PT. DRESINDO HARAPAN SUKSES

Project Location : Bechtel APLNG Module Yard

PT. Smoe Indonesia Kabil - Batam

Clasification : Pipe Fitter

Period Service : June 17'h 2013 up to June 16th 2014

Reason of Leaving : Finish Contract

2. Company : PT. McDERMOTT INDONESIA

Project Location : PT. McDermott Indonesia Batam Base

Clasification : Pipe Coin. Tech

Period Service : March 05th 2012 up to 15 April 2013

Reason of Leaving : Retrenchment

3. Company : PT. GLOBAL PROCESS SYSTEMS

Project Location : PT. Global Process Systems - Sekupang

Clasification : Pipe Fitter

Period Service : May 08d' 2011 up to November 30th 2011

Reason of Leaving : Retrenchment

Your Faithfully

(ADITIA IMANUEL SEMBIRING)

BEREN MEJEMAT TARIGAN

Mobile Phone: 081*********

Email: acz6sy@r.postjobfree.com

CURRICULUM VITAE

Personal Detail

Name : Beren Mejemat Tarigan

Place & Date of Birth : Tj.Barus, 1th July 1989

Status : Single

E-mail :acz6sy@r.postjobfree.com

Phone : 081*********

Address : Bengkong Otorita Jln.Mentok

No 9.Batam 29432

Mechanical Completion, Pre-Commissioning.

Formal Education

2003 – 2006 : Senior High School SMK Negeri 1 Berastagi

2000 – 2003 : Junior High School Adven Barus Julu

1994 – 2000 : Elementary School Negeri 1 Tj.Barus

Certification And Training

Permit to Work System by PT.McDERMOTT

Confined Space safe Strategy, roles and responsibilities by PT.McDERMOTT

Hazard Indentification Tool (HIT) by PT.McDERMOTT

Hydro & Pneumatic Testing by PT.McDERMOTT

Manual Torque Tightening Hydratight by PT.McDERMOTT

EST Group’ GripTight’TM Test Plugs by CURTISS WRIGHT

Certificate of Safety Recognition by APLNG Bechtel

IIF Commitment Certificate by Gorgon Project Australia

Safety Recognation by APLNG Mod Yard

Working Experience

Working at PT.SMOE Indonesia

Period : September 2013 – September 2014 ( Project APLNG)

Purpose : Permanently Working

Position : Pipe Fitter

Working at PT.Mcdermott Indonesia

Period : March 2012 – August 2013( Project Gorgon (PARs_PAUs) - Gorgon Australia)

Purpose : Permanently Working

Position : Technician Leaktest

Position : Technician Hydro & Pneumatic Testing

Position : Technician Retro Jetting & Blowing

Working at PT.Mcdermott Indonesia

Period : Feb 2010 – March 2011 (Project Esso – Kipper Tuna Turrum Project)

Purpose : Permanently Working

Position : Technician Preservation

Position : Technician Hydro & Pneumatic Testing

Position : Technician Retro Jetting & Blowing

Position : Technician Tubing Test

Working at PT.Universal Karya Mandiri

Period : May 2008 – July 2008 ( Project by PT.Global Procces Syistems )

Purpose : Contract

Position : Pipe Fitter

Position : Pipe Punchlist

JOB DESCRIPTION

Position : Technician Preservation

Job description :

Pickling Pipe Spool and Valves

Cleaning inside and outside Pipe Spool and Valves

Cover Equipment,Turbin,Valves,and Pipe Spool

keep all the goods from the vendor to complete the installation in order to maintain the quality of manufacturing as new

Position : Technician Hydro & Pneumatic Testing

Job description :

Preparing Packages for Testing

Reviewing Test Packages and preparing for testing materials

Performing pre-test reviews prior to pressure testing, and verifying system is prepared for test

Witnessing pressure testing

Witnessing Flushing, Blowing, and Drying

Restoring system to pre-test set-up (replaces valves, valve internals, remove test blanks, remove test blinds and complete flange torqueing )

Can do Retrojetting, Flushing, and Drying after or before testing

Specialties piping; testing

Position : Technician Retro Jetting & Blowing

Job description :

designing, producing and finishing decorative pieces, including windows, mirrors, lamp bases, ornaments, tableware and sculptures;

-working with molten glass (from a furnace) and a blowing iron to form the glass into a rough shape;

-kiln forming - slumping glass into a mould;

-recycling scraps (cullet) from larger producers;

-soldering pieces of coloured, painted or enamelled glass;

-using decorative techniques, including engraving, acid-etching, stencilling, sand or grit blasting;

-restoring, renovating and repairing original pieces;

-selling wares directly to customers or stockists, from a studio, shop or gallery;

-networking to establish effective contacts in one's own specialist market;

-attending training courses to keep abreast of technological, scientific and innovative advances in the industry and to learn new techniques;

-researching and monitoring the worldwide glass market to ensure products are current, in demand and reasonably priced;

-attending craft fairs and exhibitions;

-giving live demonstrations of production of work before selling;

-producing a catalogue or portfolio of designs for publicity purposes.

Personality

Good attitude, Kind, Communicative, Diligent, Tolerant, Target Oriented, be Responsible.

I authorized that the declaration stated by me on this curriculum vitae is investigated. Reponses and information given here are true and correct to the best my knowledge.

I understand that false or misleading information or any fact may result in rejection of this application.

Regards;

Beren Mejemat Tarigan

CURRICULUM VITAE

PERSONAL DATA :

Name : RUDIYANTO

Place of Brith : Cilacap, March 22, 1972

Marital Status : Married

Religion : Moslem

Nationality : Indonesia

Education : High School

Address : Perum GMP 1 Blok H-15 RT 04 RW 03 Batu Ampar, Batam

No Telephone : 082*-****-****

Qualification : Piping Dept

EXPERIENCE IN WORKING

1.Fabrication Spool / Pipe

2.Erection & Installation Spool / Pipe

3.Punch List

4.Hydro Test

5.Pneumatic Test

6.Leak Test

7.Reinstatment

8.Pipe Alignment

9.Line Work

TRAINING EXPERIENCE

1.M & O INDONESIA

Certification Of Competency In :

* BOSIET ( Basic Offshore Safety Induction & Emergency Training )

2. MSTS ASIA SDN . BHD.

Certification Of Compentency In :

* COMBINED SEA SURVIVAL, FIRE FIGHTING & FIRST AID

3. PT. MC DERMOTT INDONESIA- CRAFT TRAINING CENTER

Certification Of Compentency In :

* HYDRO TEST & PNEUMATIC TEST

4. MCCS ( Mechanical Completion Commissioning Service ) INTERNATIONAL

Certification Of Competency In :

* HYDRO TEST & PNEUMATIC TEST

5. PT. MC DERMOTT INDONESIA - CRAFT TRAINING CENTER

Certification Of Competency In :

“ ASSEMBLING AND TIGHTENING BOLTED CONECTION “

Has attended theory and practical sessions for :

* FLANGE ASSEMBLY

* MANUAL TORQUE TIGHTENING

* HYDRAULIC TORQUE TIGHTENING

* HYDRAULIC BOLT TENSIONING

6. PT. MC DERMOTT INDONESIA - CRAFT TRAINING CENTER

Certification Of Competency In :

* LIGHT RIGGING

* BASIC RIGGING

7. PT. MC DERMOTT INDONESIA - CRAFT TRAINING CENTER

Certification Of Competency In :

* I I F ( Incident & Injury Free )

AWARDS IS PRESENTED

PT. MC DERMOTT INDONESIA

SERVICE AWARD 5 YEARS

SAFETY CHAMPION AT PROJECT CHEVRON PLATONG GAS II OFFSHORE THAILAND

QUALITY AWARD AT PROJECT ESSO KIPPER TUNA TURRUM GAS

SAFETY EXECELLENCE AT PROJECT MAERSK PEREGRINO FPSO

WORK EXPERIENCE

1. Company : PT. MC DERMOTT INDONESIA

Periode of Service : February 18,2007 to February 23, 2015

Project Location : * CPP (Central Processing Platform) ARTHIT PROJECT

Fabricasy in Batam & Offshore Thailand

* CPP ( Central Processing Platform ) SU TU VANG PROJECT

Fabricasy in Batam & Offshore Field Vietnam

* CPP ( Central Processing Platform ) NORTH BELUT PROJECT

Fabricasy in Batam & Offshore Field Natuna

* CHEVRON UTILITY DECK & PLLQ 2 PROJECT

Fabricasy in Batam & Offshore Field Thailand

* CHEVRON PLATONG GAS II PROJECT

Fabricasy in Batam & Offshore Field Thailand

* MAERSK PEREGRINO FPSO PROJECT

Fabricasy in Batam

* ESSO KIPPER TUNA TURRUM GAS PROJECT

Fabricasy in Batam

* GORGON PROJECT

Fabricasy in Batam

* KEPODANG PROJECT

Fabricasy in Batam & Offshore Field Indonesia

Classification : Pipe Fitter Foreman

Reason For Leaving : Contract Completion

2. Company : PT. WAIJO

Periode Of Service : June 14, 2005 to March 31,2006

Project Location : Trans Pasific Pertochemical Indotama ( TPPI )

Tuban Auromatic Project East Java

Classification : Pipe Fitter Foreman

Reason for Leaving : Contract Completion

3. Company : PT. CAHAYA MITRA SEHATI

Periode Of Service : June 22,1999 to January 26,2000

Project Location : PT. Pisma Putra Tex – Pekalongan

Classification : Pipe Fitter Foreman

Reason For Leaving : Contract Completion

4. Company : PT. SUMBER ARTO ENGINEERING

Periode Of Service : December 27,1997 to September 15,1998

Project Location : Asahimas Clas New Factory, Cikampek

Classification : Pipe Fitter Foreman

Reason For Leaving : Contract Completion

5. Company : PT. BOSKALIS INTERNATIONAL bv

Periode Of Service : August 22,1997 to December 14,1997

Project Location : PLTU’s Tanjung Jati Project at Jepara

Central Java, Indonesia

Classification : Mechanical

Reason For Leaving : Contract Completion

6. Company : PT. MITRA PRIMA INTIPERDANA

Periode Of Service : September 10,1996 to January 11,1997

Project Location : PT. Sinar Sosro – Cakung

Classification : Pipe Fitter Foreman

Reason For leaving : Contract Completion

7. Company : PT. CAHAYA MITRA SEHATI

Periode Of Service : March 22,1996 to January 5,1996

Project Location : PT. Kasen Nozzle Ejip – Cikarang

Classification : Pipe Fitter Foreman

Reason For Leaving : Contract Completion

8. Company : PT. KARYA GATRA PADUTAMA

Periode Of Service : November 3, 1995 to March 3 1996

Project Location : Nakakin Ejip Cikarang

Classification : Pipe Fitter 1

Reason For Leaving : Contract Completion

9. Company : PT. TAIYO SINAR RAYA TEKNIK

Periode Of Service : May 16,1995 to October 16,1995

Project Location : PT. Indonesia Toray Synthetic 10 P Tangerang

Classification : Piping Instrumentation

Reason For Leaving : Contract Completion

10. Company : HAM PT. RANGKA RUANG

Periode Of Service : April 25,1994 to April 18,1995

Project Location : Project SPM “HAM 461” Cilacap

Classification : Pipe Fitter 1

Reason For Leaving : Contract Completion

The Above Information is true and correct to the best my knowledge it is understood that above personal date be unshed record of my experience condition reference.

Batam,

Your Sincerely

RUDIYANTO



Contact this candidate