Post Job Free

Resume

Sign in

Sr.QAQC Engineer

Location:
Depok, West Java, Indonesia
Posted:
May 07, 2017

Contact this candidate

Resume:

International Welding Inspector CSWIP *.*

NDT RI Lev.2 /SNT-TC-1A

Name : Srira Ridar Raharja

D.O.B : 24 December 1972

: Perumahan Rajiman Indah No.A8

Central Java 53224

Indonesia

Nationality : Indonesia

Passports no : B4526626

Driving License : Full Indonesia - A & C

Class 3 German Licence

: +62-812********

: acz6pt@r.postjobfree.com

PROFESSIONAL DEVELOPMENT

International Welding Inspector CSWIP 3.1 at PT. Fritz Mandiri Authorized by TWI SEA TWI (The Welding Institute - UK), Certificate no. 39573/2

Welding Inspection Conducted by Biro Klasifikasi Indonesia

ASNT Level 2 Radiographic Interpretations per SNT-TC-1A Conducted by Quality Inspeksi Servis.Certificate No.QIS-RI-100901

Painting Training by Jotun Paint School.

Painting Training by Sigma

Sea Survival Training in " Prosafe Binatama " Jakarta

Ms Office Training ( Ms.Word,Ms.Excel ) " Informatica Technology Computer " Cilacap

PTW – Permit To Work training conduct by PT.Agincourt Resources.

Hazard Awareness training conduct by PT.Agincourt Resources.

PROFESSIONAL MEMBERSHIP (S)

A Member of the Welding & Joining Society – TWI-UK

IWS (Indonesia Welding Society).

EDUCATION DETAILS

Qualification : Diplom Eng.

Field of Study : Construction Technic

Institute/University : Berufsfortbildungswerk (BfW) Hamburg Germany

Duration Study : 1998-2001

GPA : 3.00

SYNOPSIS OF CAREER

I have more than 13 years experience, Oil and Gas company,Mining,Petrochemical in the field of Inspection services pertaining to major construction projects onshore and offshore. I am both dedicated and hard working, with an unequivocal thirst for new challenges.

.

CAREER HISTORY

PT.Agincourt Resources – Project Development

Periode : February 2017 – Up to now

Position : Sr.QA/QC Engineer and Construction

Project : Heavy Fuel Oil (HFO) Power Plant – Martabe Gold Mine North Sumatera.

• Responsible for the management, control and implementation of quality control system to

comply client satisfaction.

• Review Quality Management Plan of contractor.

• Review of contractor ITP – Inspection and Test Plan such as ITP for Civil work and Mecha

nical works ( Tanks and Piping ) as per code and standard

• Review and Witness making a pWPS (pre Welding Procedure Specification ) to record of

Procedure Qualification.

• To check incoming material to comply with mill certificates.

• Witness and monitoring of steel structure fabrication including painting as per drawing and

Engineering specification.

• To guiden of contractor QAQC Engineer to prepare,control and record of all QAQC activity.

• Preparation of test packs for each equipment prior installed.

• Monitoring Installation and erection of Steel stuctures.

• Monitoring of Tank fabrication start from rolling through erection and Installation as per

API 650 and AWS D1.1

• To selection qualified welders with welder performance test.

• Monitoring Installation of pipings including weld preparation,fit up,visual as per WPS.

• Preparation

• Preparation of C0 Test Packs prior commissioning.

• Punch List after construction completion.

• To make a report and send to Project Manager.

• Review of Contractor MDRs – Manufacture Data Reports.

PT.Agincourt Resources – Project Development

Periode : June 2016 – February 2017

Position : Sr.QA/QC Engineer and Construction

Project : Secondary Crusher – Martabe Gold Mine North Sumatera.

• Responsible for the management, control and implementation of quality control system to

comply client satisfaction.

• Review Quality Management Plan of contractor.

• Review of contractor ITP – Inspection and Test Plan.

• Review of Welder certifcates

• Witness and monitoring of steel structure fabrication including painting as per drawing and

Engineering specification.

• Witness drilling of ground anchor as per design drawing

• Preparation of test packs for each equipment prior installed.

• To test compressive strenght of grout anchor.

• Monitoring Installation and erection of Steel stuctures.

• Monitoring Installation and erection of Chutes and all mechanical Equipments such as Jaw

Crusher,Drive Motor Pulley,Tramp Magnet,Weightometer,Overhead crane,Primary Screen.

• Monitoring Installation of Conveyor belts laying and splicing.

• Preparation of C0 Test Packs prior commissioning.

• Punch List after construction completion.

• To make a report and send to Project Manager.

• Review of Contractor MDRs – Manufacture Data Reports.

PT.PETROSEA Tbk

Periode : July 2014 – Feb 2016

Position : Sr.QA/QC Engineer and Project Engineer Coordinator

Project : Tabang Haul Road at East Kalimantan and Camp Facilities,workshop and

Ware House Timika Papua.

• Responsible for the management, control and implementation of quality control system to

comply client satisfaction.

• Review Quality Assurance Plan and other related QA/QC procedures.

• Review all contractor documents such as ITP,Quality Management Plant,and other

Procedure.

• Witness fabrication of Girder Bridge,Tested of welder as per AWS D1.1

• Visual welding,Dye Penetran Test and report to client.

PT.JResources Bolang Mongondow (JRBM)

Periode : October 2013 – May 2014

Position : Steel Structure,Mechanical,Piping Superintendent

Project : Bakan Gold Mining Development Project Nort Sulawesi Indonesia

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Review Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Read Isometric Drawing and PFD – Process Flow Diagram

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

Attend construction Meeting to follow up issue of schedule

Maintain schedule and supervised fabricatian at vendor to fabricated :

-All steel structures Building

-Surge Bin

-Lime Feeder

-Chutes

-Bag Breaker

-Pulley Frame

-Counterweight

-Diverter Gate

-Belt Feeder transfer station

-Conveyor and transfer Tower.

PT.PERTAMINA REFINERY UNIT IV (on Behalf )

Periode : August 2012 – September 2013

Position : Sr.QA/QC and Spv.Piping,Steel Structures

Project : Resid Fluid Catalytic Cracking – RFCC Pertamina Cilacap

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Review Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

Attend construction Meeting to follow up issue of schedule

Monitoring stone column,piling spun and steel pipe pile and soil improvement.

Witness Welder Qualification Test.

Review Radiography Films,witness MPI and Dye Penetran Test.

Monitoring spun piling and Steel Pipe Pile fabrication for Jetty Construction.

Supervise fabrication of pipe process,Under ground pipe,Spherical Tanks,Atmospheric Tanks.

Read Isometric Drawing and PFD – Process Flow Diagram for monitor fabrication of piping.

Supervise fabrication and installation Steel Structures as per code AWS D1.1

Supervise fabrication and installation of branch connection of piping such as Hot Tap,Cold Tap and Flange connection from existing line to the new line.

Manage receiving inspection and testing of incoming raw materials.

Lycopodium Mineral Pty Ltd.

Periode : Oct 2011-August 2012

Position : QA/QC

Project : Akyem Project Newmont Gold Ridge Limited in Ghana West Africa

Preperation of WPS with relevant qualified PQR for the projects

QC documentation, Method Statement, and QC plans.

Inspection of Tankage Fabrication Erection and testing of as per standards Witness / review of WPS / PQR / WQT/Lab Testing.

Ensuring all welding activities is controlled within the requirements of relevant WPS, WI, QCPs & ITPs.

Verifying & Complying to all QC codes/standards.

Co-ordination with NDT agencies.

Preparation of offer for Radiography, UT and other NDT.

Preparation for Hydrotesting for tanks

Preparation of As Built Drawings/ Final QC Dossier

Carrying out regular ISO audit and record maintenance

Monitoring and reporting welder performance throughout project duration for specification and code requirements

Maintain all inspection report and related documents in QA/QC department

Preparation of punch lists and clearance to next stage like Erection, Construction Completion, Commissioning.

Material identification and review / Verification of raw material certificates.

Involved in Review of P&ID, Isometric drawings.

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Prepare Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Prepared QA/QC weekly and Monthly Report to management.

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

To check welding preparation,welding equipment,welder test prior start production.

Monitoring fabrication and Installation of 11 units CIL Tanks,2 units Cyanide tanks,diesel tank,thickener as per specification and standard API 650 and AS 1554

Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.3 Process Piping

Monitoring fabrication,Installation and erection of Steel Stucture as per specification and standard AWS D1.1and AS 1554

Review Film Radiography with Client and thirdparty Company.

Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.

Attend Critical Project meeting to solve problem with production and Project Team Leader.

Attend Quality Committee Meeting and Improved finding.

Monitor NDT activity and capability Quality Inspector and NDE Inspector.

Provide QA/QC Dossier and submitted to client and Project Team Lead timely.

Provide site Quality training as required for site inspection personnel.

Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.

FLSmidth Indonesia

Periode : May – Oct 2011

Position : Sr.QA/QC

Project : OPCC Tutupan Adaro

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Monitor, investigate, identify and raise site quality issues to the Project Team.

Prepared QA/QC daily Report to management.

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan.

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

Review Film Radiography with Client and Thirdparty Company.

Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.

Attend Critical Project meeting to solve problem with production and Project Team Leader.

Attend Quality Committee Meeting and Improved finding.

Monitor NDT activity and capability Quality Inspector and NDE Inspector.

Provide QA/QC Dossier and submitted to client and Project Team Lead timely.

To check and control surface preparation,Dry Film Thickness of painting

PT.Kaltim Nitrate Indonesia

Periode : November 2009 – May 2011

Position : QA/QC Engineer

Project : Ammonium Nitrate Prill Plan Bontang East Kalimantan

Review Drawing and ITP (Inspection & Test Plan).

Review Procedure such as fabrication procedure,painting and pickling procedure

Review WPS and PQR

Review Mill Certificated and Welder Certificated.

Review Weld Map And NDE Map.

Monitoring Welding Process (Before, During, After Welding).

Welding Inspection Record.

Visual Inspection and Dimension Inspection.

Request and Monitoring Progress NDT.

Review And Approved Film Radiography From NDT Subcontractor.

Witness of Welder Performance Qualification Test.

Monitoring fabrication Prilling Tower as per specification and standard API 650

Monitoring fabrication,installation and erection of piping as per pecification and standard ASME B 31.3 Process Piping

Review Test Package prior Hydrotest

To check punch list and test pack prior Hydrotest

Witness Hydrotest of piping

Witness and monitor process PWHT for High Pressure Piping (Alloy Steel P no.11)

Prepare Report Visual Welding for MDR.

PT.PETROSEA Tbk

LAING O’ROURKE

Joint Operation

Periode : December 2008 – September 2009

Position : QA/QC Engineer

Project : Bontang Coal Terminal Upgrade phase2 at Bontang East Kalimantan

To check incoming Material such as visualy,dimensional check as per mill certificate

Prepare and witness welder test.

Visual inspection after completed welding and witness Dye Penetrant Test and UT by third party

To make daily Report

Prepare and make MDR(Manufacture Data Report)

PT.PETROSEA Tbk

Periode : August 2008 – December 2008

Position : QA/QC Engineer

Project : Pakar Coal Project at East Kalimantan

Review Drawing and ITP (Inspection & Test Plan).

Review Procedure such as fabrication procedure,painting and pickling procedure

Review WPS and PQR

Review Mill Certificated and Welder Certificated.

Prepare Weld Map And NDE Map.

Monitoring Welding Process (Before, During, After Welding).

Welding Inspection Record.

Visual Inspection and Dimension Inspection.

Request and Monitoring Progress NDT.

Review And Approved Film Radiography From NDT Subcontractor.

Witness of Welder Performance Qualification Test.

Monitoring Tank fabrication as per specification and standard API 650

Monitoring fabrication,installation and erection of piping as per pecification and standard ASME B 31.3 Process Piping

To check punch list and test pack prior Hydrotest

Witness Hydrotest of piping

Prepare Report Visual Welding for MDR

PT.PETROSEA Tbk

Periode : March 2008 – May 2008

Position : QA/QC INSPECTOR

Project : Cibaliung Gold Mining Project phase 2 at Banten

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Prepare Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Prepared QA/QC weekly and Monthly Report to management.

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

To check welding preparation,welding equipment,welder test prior start production.

Monitoring fabrication and Installation of 6 units CIL Tank as per specification and standard API 650.

Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.3 Process Piping

Monitoring fabrication,Installation and erection of Steel Stucture as per specification and standard AWS D1.1

Review Film Radiography with Client and thirdparty Company.

Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.

Attend Critical Project meeting to solve problem with production and Project Team Leader.

Attend Quality Committee Meeting and Improved finding.

Monitor NDT activity and capability Quality Inspector and NDE Inspector.

Provide QA/QC Dossier and submitted to client and Project Team Lead timely.

Provide site Quality training as required for site inspection personnel.

Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.

NSE – Nippon Steel Engineering

Periode : February 2007 – January 2008

Position : QA/QC INSPECTOR

Project : Gas Pipe Line Project Onshore and Offshore South Sumatera - West

Java 1 ( SSWJ 1) Contract Package 4 ( CP4 ).

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Prepare Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Prepared QA/QC weekly and Monthly Report to management.

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

To check welding preparation,welding equipment,welder test prior start production.

Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.8

Review Film Radiography with Client and thirdparty Company.

Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.

Attend Critical Project meeting to solve problem with production and Project Team Leader.

Attend Quality Committee Meeting and Improved finding.

Monitor NDT activity and capability Quality Inspector and NDE Inspector.

Provide QA/QC Dossier and submitted to client and Project Team Lead timely.

Provide site Quality training as required for site inspection personnel.

Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.

Witness Holiday Test before lowering

Japan Oil Engineering ( JOE )

Periode : September 2006 – February 2007

Position : QA/QC INSPECTOR

Project : Gas Pipeline Project Offshore and Onshore South Sumatera - West Java 1 ( SSWJ 1) Contract Package 4 ( CP4 )

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Prepare Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Prepared QA/QC weekly and Monthly Report to management.

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

To check welding preparation,welding equipment,welder test prior start production.

Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.8

Review Film Radiography with Client and thirdparty Company.

Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.

Attend Critical Project meeting to solve problem with production and Project Team Leader.

Attend Quality Committee Meeting and Improved finding.

Monitor NDT activity and capability Quality Inspector and NDE Inspector.

Provide QA/QC Dossier and submitted to client and Project Team Lead timely.

Provide site Quality training as required for site inspection personnel.

Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.

Witness Holiday Test before lowering

Japan Oil Engineering ( JOE )

Periode : May - August 2006 ( Offshore barge DLB Kuroshio 2 )

Position : QA/QC INSPECTOR

Project : Gas Pipe Line Project Onshore and Offshore South Sumatera - West

Java 1 ( SSWJ 1) Contract Package 2 ( CP2 ).

Responsible for the management, control and implementation of quality control system to comply client satisfaction.

Prepare Quality Assurance Plan and other related QA/QC procedures.

Review all contractor documents such as ITP,Quality Management Plant,and other procedure

Prepared QA/QC weekly and Monthly Report to management.

Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,

Attend management Meeting, follow up QA/QC issues and Monitor accordingly.

To check welding preparation,welding equipment,welder test prior start production.

Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.8

Review Film Radiography with Client and thirdparty Company.

Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.

Attend Critical Project meeting to solve problem with production and Project Team Leader.

Attend Quality Committee Meeting and Improved finding.

Monitor NDT activity and capability Quality Inspector and NDE Inspector.

Provide QA/QC Dossier and submitted to client and Project Team Lead timely.

Provide site Quality training as required for site inspection personnel.

Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.

Witness Holiday Test before lowering

PT.Iridian Surya Wahana

Periode : January - December 2005

Position : QA/QC INSPECTOR

Project : Maintenance of Pertamina Refinery plan unit IV Cilacap Central Java

CV.ADITAMA KARSA

Periode : September 2003 - December 2004

Position : QA/QC INSPECTOR

Project : Maintenance of Pertamina Refinery plan unit IV Cilacap Central Java

Schiff - Industy Korrosionsschutz ( SIK ) Hamburg Germany

Periode : September 2001 - June 2002

Position : Corrosion Maintenance

Project : Sandblasting and painting of ship

Dreko Korrosionsschutz Hamburg Germany

Periode : January 1997 - December 1998

Position : Corrosion Maintenance

Project : Sandblasting and painting of ship

COMPUTER SKLIL

# Autocad (2D + 3D)

# Microsoft Office (Word, Excel)

# Internet/E-mail.

Language skills :

English, both oral and written.

German both oral and written

ADDITIONAL INFORMATION

Nationality: Indonesia

References & Certificates: Available on Request

Note : Original Copy of Certification and another supporting documents may be called for and presented if and when required.

I hereby certify that all statements in this data are true and correct to to the best of my knowledge and belief.

Best Regards

Srira Ridar Raharja



Contact this candidate