International Welding Inspector CSWIP *.*
NDT RI Lev.2 /SNT-TC-1A
Name : Srira Ridar Raharja
D.O.B : 24 December 1972
: Perumahan Rajiman Indah No.A8
Central Java 53224
Indonesia
Nationality : Indonesia
Passports no : B4526626
Driving License : Full Indonesia - A & C
Class 3 German Licence
: acz6pt@r.postjobfree.com
PROFESSIONAL DEVELOPMENT
International Welding Inspector CSWIP 3.1 at PT. Fritz Mandiri Authorized by TWI SEA TWI (The Welding Institute - UK), Certificate no. 39573/2
Welding Inspection Conducted by Biro Klasifikasi Indonesia
ASNT Level 2 Radiographic Interpretations per SNT-TC-1A Conducted by Quality Inspeksi Servis.Certificate No.QIS-RI-100901
Painting Training by Jotun Paint School.
Painting Training by Sigma
Sea Survival Training in " Prosafe Binatama " Jakarta
Ms Office Training ( Ms.Word,Ms.Excel ) " Informatica Technology Computer " Cilacap
PTW – Permit To Work training conduct by PT.Agincourt Resources.
Hazard Awareness training conduct by PT.Agincourt Resources.
PROFESSIONAL MEMBERSHIP (S)
A Member of the Welding & Joining Society – TWI-UK
IWS (Indonesia Welding Society).
EDUCATION DETAILS
Qualification : Diplom Eng.
Field of Study : Construction Technic
Institute/University : Berufsfortbildungswerk (BfW) Hamburg Germany
Duration Study : 1998-2001
GPA : 3.00
SYNOPSIS OF CAREER
I have more than 13 years experience, Oil and Gas company,Mining,Petrochemical in the field of Inspection services pertaining to major construction projects onshore and offshore. I am both dedicated and hard working, with an unequivocal thirst for new challenges.
.
CAREER HISTORY
PT.Agincourt Resources – Project Development
Periode : February 2017 – Up to now
Position : Sr.QA/QC Engineer and Construction
Project : Heavy Fuel Oil (HFO) Power Plant – Martabe Gold Mine North Sumatera.
• Responsible for the management, control and implementation of quality control system to
comply client satisfaction.
• Review Quality Management Plan of contractor.
• Review of contractor ITP – Inspection and Test Plan such as ITP for Civil work and Mecha
nical works ( Tanks and Piping ) as per code and standard
• Review and Witness making a pWPS (pre Welding Procedure Specification ) to record of
Procedure Qualification.
• To check incoming material to comply with mill certificates.
• Witness and monitoring of steel structure fabrication including painting as per drawing and
Engineering specification.
• To guiden of contractor QAQC Engineer to prepare,control and record of all QAQC activity.
• Preparation of test packs for each equipment prior installed.
• Monitoring Installation and erection of Steel stuctures.
• Monitoring of Tank fabrication start from rolling through erection and Installation as per
API 650 and AWS D1.1
• To selection qualified welders with welder performance test.
• Monitoring Installation of pipings including weld preparation,fit up,visual as per WPS.
• Preparation
• Preparation of C0 Test Packs prior commissioning.
• Punch List after construction completion.
• To make a report and send to Project Manager.
• Review of Contractor MDRs – Manufacture Data Reports.
PT.Agincourt Resources – Project Development
Periode : June 2016 – February 2017
Position : Sr.QA/QC Engineer and Construction
Project : Secondary Crusher – Martabe Gold Mine North Sumatera.
• Responsible for the management, control and implementation of quality control system to
comply client satisfaction.
• Review Quality Management Plan of contractor.
• Review of contractor ITP – Inspection and Test Plan.
• Review of Welder certifcates
• Witness and monitoring of steel structure fabrication including painting as per drawing and
Engineering specification.
• Witness drilling of ground anchor as per design drawing
• Preparation of test packs for each equipment prior installed.
• To test compressive strenght of grout anchor.
• Monitoring Installation and erection of Steel stuctures.
• Monitoring Installation and erection of Chutes and all mechanical Equipments such as Jaw
Crusher,Drive Motor Pulley,Tramp Magnet,Weightometer,Overhead crane,Primary Screen.
• Monitoring Installation of Conveyor belts laying and splicing.
• Preparation of C0 Test Packs prior commissioning.
• Punch List after construction completion.
• To make a report and send to Project Manager.
• Review of Contractor MDRs – Manufacture Data Reports.
PT.PETROSEA Tbk
Periode : July 2014 – Feb 2016
Position : Sr.QA/QC Engineer and Project Engineer Coordinator
Project : Tabang Haul Road at East Kalimantan and Camp Facilities,workshop and
Ware House Timika Papua.
• Responsible for the management, control and implementation of quality control system to
comply client satisfaction.
• Review Quality Assurance Plan and other related QA/QC procedures.
• Review all contractor documents such as ITP,Quality Management Plant,and other
Procedure.
• Witness fabrication of Girder Bridge,Tested of welder as per AWS D1.1
• Visual welding,Dye Penetran Test and report to client.
PT.JResources Bolang Mongondow (JRBM)
Periode : October 2013 – May 2014
Position : Steel Structure,Mechanical,Piping Superintendent
Project : Bakan Gold Mining Development Project Nort Sulawesi Indonesia
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Review Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Read Isometric Drawing and PFD – Process Flow Diagram
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
Attend construction Meeting to follow up issue of schedule
Maintain schedule and supervised fabricatian at vendor to fabricated :
-All steel structures Building
-Surge Bin
-Lime Feeder
-Chutes
-Bag Breaker
-Pulley Frame
-Counterweight
-Diverter Gate
-Belt Feeder transfer station
-Conveyor and transfer Tower.
PT.PERTAMINA REFINERY UNIT IV (on Behalf )
Periode : August 2012 – September 2013
Position : Sr.QA/QC and Spv.Piping,Steel Structures
Project : Resid Fluid Catalytic Cracking – RFCC Pertamina Cilacap
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Review Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
Attend construction Meeting to follow up issue of schedule
Monitoring stone column,piling spun and steel pipe pile and soil improvement.
Witness Welder Qualification Test.
Review Radiography Films,witness MPI and Dye Penetran Test.
Monitoring spun piling and Steel Pipe Pile fabrication for Jetty Construction.
Supervise fabrication of pipe process,Under ground pipe,Spherical Tanks,Atmospheric Tanks.
Read Isometric Drawing and PFD – Process Flow Diagram for monitor fabrication of piping.
Supervise fabrication and installation Steel Structures as per code AWS D1.1
Supervise fabrication and installation of branch connection of piping such as Hot Tap,Cold Tap and Flange connection from existing line to the new line.
Manage receiving inspection and testing of incoming raw materials.
Lycopodium Mineral Pty Ltd.
Periode : Oct 2011-August 2012
Position : QA/QC
Project : Akyem Project Newmont Gold Ridge Limited in Ghana West Africa
Preperation of WPS with relevant qualified PQR for the projects
QC documentation, Method Statement, and QC plans.
Inspection of Tankage Fabrication Erection and testing of as per standards Witness / review of WPS / PQR / WQT/Lab Testing.
Ensuring all welding activities is controlled within the requirements of relevant WPS, WI, QCPs & ITPs.
Verifying & Complying to all QC codes/standards.
Co-ordination with NDT agencies.
Preparation of offer for Radiography, UT and other NDT.
Preparation for Hydrotesting for tanks
Preparation of As Built Drawings/ Final QC Dossier
Carrying out regular ISO audit and record maintenance
Monitoring and reporting welder performance throughout project duration for specification and code requirements
Maintain all inspection report and related documents in QA/QC department
Preparation of punch lists and clearance to next stage like Erection, Construction Completion, Commissioning.
Material identification and review / Verification of raw material certificates.
Involved in Review of P&ID, Isometric drawings.
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Prepare Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Prepared QA/QC weekly and Monthly Report to management.
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
To check welding preparation,welding equipment,welder test prior start production.
Monitoring fabrication and Installation of 11 units CIL Tanks,2 units Cyanide tanks,diesel tank,thickener as per specification and standard API 650 and AS 1554
Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.3 Process Piping
Monitoring fabrication,Installation and erection of Steel Stucture as per specification and standard AWS D1.1and AS 1554
Review Film Radiography with Client and thirdparty Company.
Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.
Attend Critical Project meeting to solve problem with production and Project Team Leader.
Attend Quality Committee Meeting and Improved finding.
Monitor NDT activity and capability Quality Inspector and NDE Inspector.
Provide QA/QC Dossier and submitted to client and Project Team Lead timely.
Provide site Quality training as required for site inspection personnel.
Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.
FLSmidth Indonesia
Periode : May – Oct 2011
Position : Sr.QA/QC
Project : OPCC Tutupan Adaro
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Monitor, investigate, identify and raise site quality issues to the Project Team.
Prepared QA/QC daily Report to management.
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan.
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
Review Film Radiography with Client and Thirdparty Company.
Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.
Attend Critical Project meeting to solve problem with production and Project Team Leader.
Attend Quality Committee Meeting and Improved finding.
Monitor NDT activity and capability Quality Inspector and NDE Inspector.
Provide QA/QC Dossier and submitted to client and Project Team Lead timely.
To check and control surface preparation,Dry Film Thickness of painting
PT.Kaltim Nitrate Indonesia
Periode : November 2009 – May 2011
Position : QA/QC Engineer
Project : Ammonium Nitrate Prill Plan Bontang East Kalimantan
Review Drawing and ITP (Inspection & Test Plan).
Review Procedure such as fabrication procedure,painting and pickling procedure
Review WPS and PQR
Review Mill Certificated and Welder Certificated.
Review Weld Map And NDE Map.
Monitoring Welding Process (Before, During, After Welding).
Welding Inspection Record.
Visual Inspection and Dimension Inspection.
Request and Monitoring Progress NDT.
Review And Approved Film Radiography From NDT Subcontractor.
Witness of Welder Performance Qualification Test.
Monitoring fabrication Prilling Tower as per specification and standard API 650
Monitoring fabrication,installation and erection of piping as per pecification and standard ASME B 31.3 Process Piping
Review Test Package prior Hydrotest
To check punch list and test pack prior Hydrotest
Witness Hydrotest of piping
Witness and monitor process PWHT for High Pressure Piping (Alloy Steel P no.11)
Prepare Report Visual Welding for MDR.
PT.PETROSEA Tbk
LAING O’ROURKE
Joint Operation
Periode : December 2008 – September 2009
Position : QA/QC Engineer
Project : Bontang Coal Terminal Upgrade phase2 at Bontang East Kalimantan
To check incoming Material such as visualy,dimensional check as per mill certificate
Prepare and witness welder test.
Visual inspection after completed welding and witness Dye Penetrant Test and UT by third party
To make daily Report
Prepare and make MDR(Manufacture Data Report)
PT.PETROSEA Tbk
Periode : August 2008 – December 2008
Position : QA/QC Engineer
Project : Pakar Coal Project at East Kalimantan
Review Drawing and ITP (Inspection & Test Plan).
Review Procedure such as fabrication procedure,painting and pickling procedure
Review WPS and PQR
Review Mill Certificated and Welder Certificated.
Prepare Weld Map And NDE Map.
Monitoring Welding Process (Before, During, After Welding).
Welding Inspection Record.
Visual Inspection and Dimension Inspection.
Request and Monitoring Progress NDT.
Review And Approved Film Radiography From NDT Subcontractor.
Witness of Welder Performance Qualification Test.
Monitoring Tank fabrication as per specification and standard API 650
Monitoring fabrication,installation and erection of piping as per pecification and standard ASME B 31.3 Process Piping
To check punch list and test pack prior Hydrotest
Witness Hydrotest of piping
Prepare Report Visual Welding for MDR
PT.PETROSEA Tbk
Periode : March 2008 – May 2008
Position : QA/QC INSPECTOR
Project : Cibaliung Gold Mining Project phase 2 at Banten
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Prepare Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Prepared QA/QC weekly and Monthly Report to management.
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
To check welding preparation,welding equipment,welder test prior start production.
Monitoring fabrication and Installation of 6 units CIL Tank as per specification and standard API 650.
Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.3 Process Piping
Monitoring fabrication,Installation and erection of Steel Stucture as per specification and standard AWS D1.1
Review Film Radiography with Client and thirdparty Company.
Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.
Attend Critical Project meeting to solve problem with production and Project Team Leader.
Attend Quality Committee Meeting and Improved finding.
Monitor NDT activity and capability Quality Inspector and NDE Inspector.
Provide QA/QC Dossier and submitted to client and Project Team Lead timely.
Provide site Quality training as required for site inspection personnel.
Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.
NSE – Nippon Steel Engineering
Periode : February 2007 – January 2008
Position : QA/QC INSPECTOR
Project : Gas Pipe Line Project Onshore and Offshore South Sumatera - West
Java 1 ( SSWJ 1) Contract Package 4 ( CP4 ).
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Prepare Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Prepared QA/QC weekly and Monthly Report to management.
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
To check welding preparation,welding equipment,welder test prior start production.
Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.8
Review Film Radiography with Client and thirdparty Company.
Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.
Attend Critical Project meeting to solve problem with production and Project Team Leader.
Attend Quality Committee Meeting and Improved finding.
Monitor NDT activity and capability Quality Inspector and NDE Inspector.
Provide QA/QC Dossier and submitted to client and Project Team Lead timely.
Provide site Quality training as required for site inspection personnel.
Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.
Witness Holiday Test before lowering
Japan Oil Engineering ( JOE )
Periode : September 2006 – February 2007
Position : QA/QC INSPECTOR
Project : Gas Pipeline Project Offshore and Onshore South Sumatera - West Java 1 ( SSWJ 1) Contract Package 4 ( CP4 )
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Prepare Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Prepared QA/QC weekly and Monthly Report to management.
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
To check welding preparation,welding equipment,welder test prior start production.
Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.8
Review Film Radiography with Client and thirdparty Company.
Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.
Attend Critical Project meeting to solve problem with production and Project Team Leader.
Attend Quality Committee Meeting and Improved finding.
Monitor NDT activity and capability Quality Inspector and NDE Inspector.
Provide QA/QC Dossier and submitted to client and Project Team Lead timely.
Provide site Quality training as required for site inspection personnel.
Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.
Witness Holiday Test before lowering
Japan Oil Engineering ( JOE )
Periode : May - August 2006 ( Offshore barge DLB Kuroshio 2 )
Position : QA/QC INSPECTOR
Project : Gas Pipe Line Project Onshore and Offshore South Sumatera - West
Java 1 ( SSWJ 1) Contract Package 2 ( CP2 ).
Responsible for the management, control and implementation of quality control system to comply client satisfaction.
Prepare Quality Assurance Plan and other related QA/QC procedures.
Review all contractor documents such as ITP,Quality Management Plant,and other procedure
Prepared QA/QC weekly and Monthly Report to management.
Monitor Fabrication operation and ensuring compliance with code requirement, Standard Operating Procedure,Specification and Project Quality Plan,
Attend management Meeting, follow up QA/QC issues and Monitor accordingly.
To check welding preparation,welding equipment,welder test prior start production.
Monitoring and Witness fabrication and installation of underground and above pipes as per specification and ASME B 31.8
Review Film Radiography with Client and thirdparty Company.
Prepared Welding Rejection Rate and identify cause of problem and set up training requirement for welder.
Attend Critical Project meeting to solve problem with production and Project Team Leader.
Attend Quality Committee Meeting and Improved finding.
Monitor NDT activity and capability Quality Inspector and NDE Inspector.
Provide QA/QC Dossier and submitted to client and Project Team Lead timely.
Provide site Quality training as required for site inspection personnel.
Supervise Discipline Inspectors and Quality Specialists including correlation / review of their daily reports.
Witness Holiday Test before lowering
PT.Iridian Surya Wahana
Periode : January - December 2005
Position : QA/QC INSPECTOR
Project : Maintenance of Pertamina Refinery plan unit IV Cilacap Central Java
CV.ADITAMA KARSA
Periode : September 2003 - December 2004
Position : QA/QC INSPECTOR
Project : Maintenance of Pertamina Refinery plan unit IV Cilacap Central Java
Schiff - Industy Korrosionsschutz ( SIK ) Hamburg Germany
Periode : September 2001 - June 2002
Position : Corrosion Maintenance
Project : Sandblasting and painting of ship
Dreko Korrosionsschutz Hamburg Germany
Periode : January 1997 - December 1998
Position : Corrosion Maintenance
Project : Sandblasting and painting of ship
COMPUTER SKLIL
# Autocad (2D + 3D)
# Microsoft Office (Word, Excel)
# Internet/E-mail.
Language skills :
English, both oral and written.
German both oral and written
ADDITIONAL INFORMATION
Nationality: Indonesia
References & Certificates: Available on Request
Note : Original Copy of Certification and another supporting documents may be called for and presented if and when required.
I hereby certify that all statements in this data are true and correct to to the best of my knowledge and belief.
Best Regards
Srira Ridar Raharja