HENDRI KUSNADI
Bumi Cibeber Kencana Block D.** No.15
Cilegon, Banten-Indonesia, 42423
Phone : +628**********
Email : ******.*******@*****.***
Web profile: Hendri Kusnadi LinkedIn
Date of Birth : September 30th 1978
Marital Status : Married with two children
Nationality : Indonesian
Health : Excellence
Religion : Moslem
Objective
To offer well developed abilities and a broad base of experience in oil and gas operations and production expertise, quality control management, implementing and controlling of Company Health Safety and Environmental activities which has provide proven controlling of day to day operations of facilities and business performance continues improvement program, technical innovation to the entire oil & gas Industry to achieve world class facilities standards
Personal Profile
Eighteen years of experiences in Operation of Oil & Gas Industry and Petrochemical Plant. Involved during Plant Commissioning, Start-up and Normal Operations (as Panel and Field Operators) in Offshore Platform, Onshore Feed Gas, NGL, LPG and LNG Plants. I have worked with world class multinational companies as well as overseas experience. I am enjoys being part of a Successful and productive team. I have to learn fast, win-win thinking, self motivated with team work oriented to solve the problem, even under significant pressure I posses a strong ability to perform effectively
Summary
PTW system familiarly (Including Authorized Gas Testing )
Familiar with Process of Polypropylene Plant (UNIPOL PP Process Technology)
Familiar with AP-X (Air Products and Chemicals Inc) and ConocoPhillips Optimized Cascade of LNG technology
Familiar with operation system Offshore Wellhead Platform
Experience in pre commissioning, commissioning, start-up, normal operating and shut down gas plant (Feed Gas, NGL, LPG, LNG plant and FPSO Offshore Gas Processing)
Mechanical aptitude and knowledge in all aspect of production facilities
Ability to work closely with diverse multinational work force
Familiar with emergency drill activities as part of the fire team member
Familiar with live saving equipments (heat detector, fire and gas detector, deluge system, high expansion foam and close circuit area monitor
Familiar with Computer MS Office (Word, Excel, Visio, Outlook, Power Point and Internet) and Photoshop editor
Professional Experience
November 2014 – August 2015, FGP Offshore Field Operator, Shell GTL Qatar
February 2013 – August 2013, FGP Onshore Field Operator, Shell GTL Qatar
FGP (Feed Gas Processing) unit Facilities which consist of Two Offshore Platform facility, Slug Catcher and Condensate Stabilization, Acid Gas Removal Unit, Off-gas Treating, Dehydration and Mercaptan / Mercury Removal Unit, NGL Extraction and Fractionation, LPG Treating Unit and Field Condensate Treating Unit
Control, Monitor and adjusted the parameters of the Plant’s Normal Operating Conditions in a FGP area (the units assigned during the shift)
Direct involvements in the third party worksite preparation like isolation, de- isolation, depressurize and pressurize of vessels and lines for Permit to work
Compliance with all aspects of safety requirements and initiatives, and report all incidents and accidents
December 2010 – January 2013, LNG Commissioning and Start-up Operations Technician, Angola LNG project-Soyo, Angola-West Africa
Perform Pre - commissioning Activities : Air Blowing, Reinstatement and Conform Check as per P&ID, Vessel Inspection, Chemical Cleaning, Catalyst Loading, Co-coordinating with Vendors in the preparation of Rotating equipment’s, Review Method of Statement by using P & IDs and Isometric drawings
Perform Commissioning activities: Preparation of Operational Test Procedures for Pumps, Turbines and Compressors. Functional tests like Pressure, Flow, Level, Seal and oil Flow. Checking of Interlocks and Logics involved in the Process
Perform Start-up activities: Stroke check of controllers, Simulation check, Fire and gas system check and start-up NGL, LNG and LPG units
April 2007 – November 2010, LNG Commissioning and Start up Operator, New project LNG train 6 and 7Rasgas company ltd-Qatar
Perform Pre- commissioning Activities: Pipe Cleaning, Test Packs, Air Blowing, Reinstatement and Conform Check as per P&ID, Vessel Inspection, Chemical Cleaning, Catalyst Loading, Co-coordinating with Vendors in the preparation of Rotating equipment’s, Review Method of Statement by using P & IDs and Isometric drawings
Perform Commissioning activities: Preparation of Operational Test Procedures for Pumps, Turbines and Compressors. Functional tests like Pressure, Flow, Level, Seal and oil Flow. Checking of Interlocks and Logics involved in the Process
Perform Start-up activities: Stroke checking of controllers, Simulation check, Fire and gas system check and NGL, LNG and LPG units
Control, Monitor and adjusted the parameters of the Plant’s Normal Operating Conditions in an LNG/NGL/LPG Facilities Plant in any of the units assigned during the shift
March 2004 – April 2007, Offshore Production Field and Panel Operator, ConocoPhillips Indonesia, Belanak FPSO (Floating Production Storage and Offloading) South china ocean offshore-Indonesia
Perform Pre- commissioning Activities: Test Packs, Air Blowing, Reinstatement and Conform Check as per P&ID, Vessel Inspection, Chemical Cleaning, Catalyst Loading, Co-coordinating with Vendors in the preparation of Rotating equipment’s, Review Method of Statement by using P & IDs and Isometric drawings
Perform Commissioning activities such as: Preparation of Operational Test Procedures for Pumps, Turbines and Compressors. Functional tests like Pressure, Flow, Level, Seal and oil Flow. Checking of Interlocks and Logics involved in the Process
Perform Start-up activities such as: Stroke checking of controllers, Simulation check, Fire and gas system check and Start up wellhead Platform, FPSO Utilities and LPG units
Control, Monitoring and adjusted the parameters of the Plant's Normal Operating Conditions in wellhead platforms, FPSO Utilities and Facilities LPG Plant in any of the units assigned during the shift
February 1997-March 2004, Junior, Senior and Panel Operator, PT.Tripolyta Indonesia (now PT.Candra Asri Petrochemical, Polypropylene Plant)
Control, Monitor and adjusted the parameters of the Plant's Normal Operating Conditions in a UNIPOL Polypropylene Process Technology in any of the units assigned during the shift
Performing equipments safe operation, isolation for maintenance and trouble shooting in area of the plant such as: Gas Phase Reactor, Gas Phase Composition, Catalyst Injection System, Recycling Gas Compressor, Degassing System, Vent Recovery Unit, Feed Purification Unit (ethylene and propylene)
Education and Professional Training
Graduated on 1996, SMAN 1 Senior High School in Sawah Lunto-Indonesia (Physical Science A1)
Main Power Gas Generator -Roll Royce
Production Operator and Panel Operator Assessment -ConocoPhillips
Marine Operator Assessment -ConocoPhillips
Gas Turbine Operation and Maintenance -Pakarti Tirtoagung
Gas Lift Presentation attended-ConocoPhillips
Gas Plant (LPG Plant) Training-DDP
Centrifugal Pump -EBARA Japan
Hydraulic Mix Refrigerant Turbine for LNG gas processing by EBARA International
MCHE (Main Cryogenic Heat Exchanger) and AP-X (LNG Technology) Training by Air Product
Centrifugal Compressor Steam Turbine Training by Mitsubishi Japan
NGL Recovery Process Course by ORTLOFF Engineers Ltd. USA Ras Laffan, State of Qatar
Centrifugal Compressor Course (by Nouvo Pignone) Ras Laffan, State of Qatar
GE Course (GT Frame 6 & 9 Operations) of Nouvo Pignone,Ras Laffan, State of Qatar
Attended ConocoPhillips Optimized Cascade Process Training (LNG Processing) Angola LNG and Conocophillips
Safety Training
Lock Out Tag Out Training –ConocoPhillips, RasGas and Angola LNG
HUET and Sea survival –OPITO MSTS Asia (Johor-Malaysia) and OPITO Qatar International Safety Centre
Hazardous Chemical Handling –ConocoPhillips, RasGas and Angola LNG
Waste handling management system -ConocoPhillips, RasGas and Angola LNG
MSDS Training -ConocoPhillips, RasGas and Angola LNG
Firefighting course yearly -MSTS Asia, Krakatau Steel, RasGas and Qatar International Safety Centre
CPR and First Aid –ConocoPhillips, Tripolyta, RasGas, Angola LNG and Qatar International Safety Centre
Stop Program Training (completed book 7th) -ConocoPhillips
Fire team member -MSTS Asia (johor bahru-Malaysia)
Permit to work training -ConocoPhillips, RasGas, Angola LNG and Shell GTL Qatar
H2S and Respiratory training -ConocoPhillips, RasGas, Angola LNG and Qatar International Safety Centre
Attended marine training, Security briefing, environmental Training, Culture awareness, community relation training, mine awareness briefing, wildlife awareness, medical induction, Environment safety health, fall protection training, stop work authority training in Angola LNG