Post Job Free

Resume

Sign in

Mechanical Engineer Project

Location:
Philippines
Posted:
May 01, 2017

Contact this candidate

Resume:

Name: Jonathan U. Fin

Profession: Mechanical Engineer

Address: Lot12, Blk 47, Ph 2, Deca Homes, Indangan

Buhangin District, Davao City, Philippines

Age: 32 years old

Mobile No.: +639*********

E-mail add: acz2k1@r.postjobfree.com

CAREER OBJECTIVE

To create value and recognition on work place by producing the best result for the organization through synchronized and hard work.

LICENSES/CERTIFICATIONS

1. Professional Regulation Commission - Mechanical Engineer, Reg. No.76340

2. Mechanical QA/QC Inspector - Status 1 (Saudi Aramco Approved)

3. Saudi Aramco Work Permit Receiver - Certificate No. 103967

4. Saudi Council of Engineers - I.D. No. 215425

WORK EXPERIENCES

1.Position : Field Engineer ( MEPFS)

Duration: January 22, 2016 - Present

Company: MAKATI DEVELOPMENT CORPORATION:

Location: C.M. Recto Avenue, Davao City

Department: MEPFS Department

PROJECT:

AVIDA TOWERS DAVAO- TOWER 1 and 2

Duties and Responsibilities:

-Analyzes data such as customer proposal, specification and manual to determine feasibility of the design.

-Directs fabrication and installation activities to ensure product conform to design and specification of customer.

-Ensures the implementation of the quality plans and objectives of the department and project.

-Ensures the compliance of all requirements prior to work execution of any scope of works.

-Coordinates all operation, maintenance and repair activities to obtain optimum utilization of machineries and equipment.

-Supervises all works of subcontractors and other related activities to ensure quality.

-Designs mechanical and electro-mechanical product and systems.

-Assists in the preparation of Project Monthly Status Report.

2.Position : QA/QC Mechanical Inspector (Saudi Aramco Approved)

Duration: December 9, 2012 – December 15, 2015

Company: AL QABEL ESTABLISHMENT AND GENERAL CONTRACTOR

(Saudi Aramco Pipeline Maintain Potential Project)

PROJECTS:

WELLHEAD PIPELINE TIE-IN TO TRUNK LINE AND TEST LINE

(SAUDI ARAMCO PROJECT)

Pipelines & Communication Project Department

Oil and Gas Upstream Projects Division

1. 8” Ø Abqaiq- 501 (Oil) Underground Flowline Replacement, Internal and Externally FBE Coated Carbon Steel Pipeline

2. Installation of Integrity Pressure Protection System (HIPPS) for four (04) Uthmaniyah Wells

3. Revalidation Testing of Flowline, Trunkline and Testline of MPD, UPD and HHPD

4. Provision of High Integrity Pressure Protection System (HIPPS) of four (04) Wells (ANDR-445, ANDR- 563, ANDR-3001 and SDGM-30

5. ABQQ-284 Tie-in Replacement of Carbon Steel Pipeline to 6” diameter Reinforced Thermoset Resin (RTR) to GOSP-3

6. Replacement of 8ӯ U/G Corroded Flowline & Piping for ABQQ-103 GOSP-2, Internal and External FBE Coated Pipe

7. Replacement of 10ӯ U/G Corroded Flowline & Piping for ANDR- 167 GOSP-2, Internal and External FBE Coated Pipe

Duties and Responsibilities:

-Ensure that every activity at the site and/or at the fabrication shop conforms to the Saudi Aramco Engineering Standards.

-Coordinates with the Saudi Aramco Project Inspection Department (SAPID) of the activities at the site and/or at the fabrication shop.

-Prepare the checklists for every inspections conducted for specific activity.

-Prepare hydrotest Package and submit to Saudi Aramco Project Inspection Department (SAPID) for approval prior to hydrotest of the new pipeline constructed.

-Ensure every equipment (Welding machine, electrode portable oven, torque wrench, relief valve, pressure gauge, etc.) used for each activity are calibrated.

-Plan and formulate engineering programs and organizes project staff according to project requirements.

-Assigns project personnel to specific phases of projects such as technical plans and system testing.

-Reviewing projects design for compliance with engineering principles, codes, industry standards, and customer or proponent contract requirements and all relates specifications.

-Coordinate all activities concerning technical developments, scheduling, and resolving engineering design and test problems.

-Direct integration of technical activities and projects.

-Evaluates and approves design changes, specifications, and drawing releases.

3.Position : Mechanical & Piping Engineer/ Project Site Engineer

Duration: June 20, 2012 – December 9, 2012

Company: AL QABEL ESTABLISHMENT AND GENERAL CONTRACTOR

(Saudi Aramco Pipeline Maintain Potential Project)

PROJECTS:

WELLHEAD PIPELINE TIE-IN TO TRUNK LINE AND TEST LINE

(SAUDI ARAMCO PROJECT)

Pipelines & Communication Project Department

Oil and Gas Upstream Projects Division

1. Replacement of 8ӯ U/G Corroded Flowline & Piping for ABQQ-103 GOSP-2, Internal and External FBE Coated Pipe

2. Replacement of 10ӯ U/G Corroded Flowline & Piping for andr-167 GOSP-2, Internal and External FBE Coated Pipe

Duties and Responsibilities:

-Responsible for manpower availability and progress of work to insure the completion of work as per target schedule.

-Responsible of work material and equipment availability.

-Supervise the piping erection as per piping and instrument diagram and isometric drawings.

-Coordinate with Project Management Team in case of design modification or additional work as per site condition.

-Review of piping design drawings and materials specification received prior to installation if any revision to make as per site condition.

-Check piping installation to make sure it complies with the design drawing requirement.

-Prepare and set relief valves and pressure gauge pressure and send them for calibration prior for hydro testing of valves and field hydro testing of new pipelines.

-In-charge in As-Built Drawings.

-Responsible for supervising site preparation and materials/ equipment installation.

-Review of piping design drawings and materials specification received prior to installation.

-Review vendors specification contractor supply materials submitted before sending to PMT for approval.

-In-charge in fabrication of pipeline spools & structural steels.

-Responsible for the progress report of the project.

-Verify all field work to site to make sure it complies with the design drawing requirement.

4.Position : Technical Superintendent

Duration: January 22, 2009 – December 3, 2011

Company: RD Tuna Ventures Inc.

Company Industry: Fishing Industry

Location: 1st Road Brgy. Calumpang, General Santos City, Philippines

Department: Ship Management

Duties and Responsibilities:

Planner/ Estimator

-Assist the operations Admin in writing the general plan of all projects related to the core operations of the fishing group and ensures that project schedules are properly coordinated.

-Prepare and revised budgets, plans and objectives in assigned projects including seeking of its approval.

-Initiate and recommend estimated cost of all job orders requested by fishing operations and other end –users.

-Develop and implement guidelines and define parameters in accordance with the standard methods and procedures to meet quality and reliability assurance.

-Conduct regular evaluation of all the ongoing projects to ensure that estimates and schedules are followed.

-Check the quality of work to ensure that all output is within the specified requirements

-Discuss work plans with concerned department heads specifically but not limited to the scope of works, completion dates, cost and material required and work flow in accordance with their priorities.

-Regularly meet with the superiors and end – users in resolving complex problems and barriers and initiates corrective action

-Submit updates on the projects status and accomplishments on a week

Material Analyst

- Performs comparative studies to verify requested materials for the fishing vessels, ensuring that requests made were correct prior to finalization of Purchase Order

- Ensures that all requisitions are complete with specifications.

- Ensures that materials delivered matched the requisitions.

- Provide engineering assistance and instruction in compliance with the vessel's technical .requirements of the project.

- Prepare documents for the material requested.

- Facilitate for the approval of the requisitions, ensuring that the needed items are delivered.on the date required.

Ship Superintendent

-Assigned as point person to supervise all job orders in every vessel under repair and maintenance

-Assist the Port Engr./Owners representative in all the dry docking works of every vessel

-Planning and controlling ships maintenance

-Negotiations with shipyards: budgets, extra works and claims

-Assuring ships operation

-Vessel dry dock preparation and correspondent management

-Identification and implementation of technical solutions

-Ensuring the regular ships vessel inspection

SKILLS Remarks

1.Knowledgeable in MS office Includes MS Word, Excel & Powerpoint

2.Knowledgeable in AutoCAD 3D and 2D

3.Knowledge of cost calculation

4.Knowledge of reading engineering drawing

And technical data

5.Prepare cost and material estimates for various

Structural works

PERSONAL DATA

Age: 31 yrs. old

Date of birth: December 30, 1984

Gender: Male

Civil Status: Married

Weight: 74 kgs

Height: 169 cm

Nationality: Filipino

Religion: Christianity

EDUCATION

Education level: College Graduate (DOST Scholar)

Education Field: Engineering

Course: BS Mechanical Engineering

School: Mindanao State University

Location: General Santos City

Date: 2001- 2008

SEMINARS / TRAININGS

Date Course title

November 19, 2016 HVAC Design, Operation and Maintenance

Mr. Armando Diaz, PEE, PMP - Lecturer

MyHotel Function Hall, Davao City

April 1, 2013 Saudi Aramco Work Permit Receiver Course

December 9,2010 Propmechanics Regional Tour 2010- Training

Theme: Power in All Forms & Sizes

Teirra Verde Hotel & Convention Center, General Santos City

August 26-28, 2010 13th PSME SOUTHERN MINDANAO ASSEMBLY

THEME: Protect, Sustain and Manage the Environment – A Challenge to Mechanical Engineers

Phela Grande Convention Center, General Santos City

August 26-27, 2009 ZF South East Asia, ZF Philippines, Synchrotek Corp. Training- Seminar Family Convention Center, General Santos City

July 15, 2009 Grundfos Pumps Training- Seminar

Sydney Hotel, General Santos City

January 31, 2009 Used oil analysis and basic lubrication

Mr. Gladwin Bacena (Petron Philippines)

RD Fishing Ind. Calumpang, Gensan city Philippines

March 4, 2009 Marine oil and oil analysis

Joselito Alfonso A. Zulueta RME, MLTI

RD Fishing Ind. Calumpang, Gensan city Philippines

CHARACTER REFERENCES

1. Ronnie C. Layosa

ENGINEER III

Saudi Aramco Producing Development Division

South Ghawar Producing Department

acz2k1@r.postjobfree.com

056*******

2. George B. Llanda

Engineer IV

Saudi Aramco Project Management Team

Onshore Maintain Potential Projects Department

Southern Area Oil Upstream Projects Division

acz2k1@r.postjobfree.com

053*******

3. Freddie S. Constantino

Cost Engineer IV

Saudi Aramco Project Management Team

Onshore Maintain Potential Projects Department

Southern Area Oil Upstream Projects Division

acz2k1@r.postjobfree.com

053*******



Contact this candidate