Mason, OH *****
*************.**@*****.***
Mobile: +1-252-***-****
Experience Summary
12+ Years of experience on Oracle Application Modules spanning across Value Chain Planning Modules
Multiple Full Cycle Implementation, rollouts and Upgrade experience at client locations across Geographies
Excellent exposure to Business Process in Retail/Semiconductor/Manufacturing sector
Interaction with customers from U.S, Japan, China
Good Leadership Skills, Conflict management and customer handling/ interfacing at global levels
Worked at various levels including Solution Architect, Functional Analyst, Test Analyst, Solution Designer and Developer
Experience in Project Management activities
Excellent analytical, organizational and interpersonal skills
Major Skill Sets
Oracle Advanced Supply Chain Planning (ASCP)
Oracle Demantra
Oracle Inventory Optimization (IO)
Oracle Global Order Promising (GOP)
Oracle Advanced Planning Command Center (APCC)
Oracle Inventory (INV)
Oracle Discrete Manufacturing (WIP)
Oracle Bills of Material (BOM)
Oracle Order Management (OM)
Oracle PL/SQL
Certifications:
CPIM - Certified
APICS-BOSC
APICS-MPR
APICS-DSP
APICS-ECO
APICS-SMR
Technical Skills:
Oracle Apps: Oracle e-Biz Applications Release 11i & R12.1.3.
Languages & Tools: SQL, PL/SQL, Java
Databases: Oracle 9i, 10G
Operating Systems: Windows XP/Vista
Other Software: Toad, SQL Developer, SQL Plus, QC, Perforce, Mercury ITG, MS Office products
Employer Details:
Company
Duration
Designation/Role
Birlasoft Inc.
Infosys Limited
2013- Current
2005-2013
VCP Consultant
Consultant /Solution Architect
Educational Details:
Degree
Specialization
Duration
University
Institution
Bachelor of Engineering
Computer Science Engineering
4 yrs
Anna University
KLN College of Engineering
Master of Business Administration(Undergoing)
Finance
2 years
BITS Pilani University
BITS Pilani
Achievements:
Won i-Qwest award for iGOOM best tool design at Infosys Limited
Experience Details:
Employer
Birlasoft Inc.
Project Type
GE Aviation Systems Implementation, Rollouts - MAR-2013 to current
Modules/Env.
R12 ASCP, INV, WIP, BOM, APCC, GOP, Demantra (OE and Repairs Forecasting)
Roles and Responsibilities: This project mainly focuses on implementing Oracle ASCP in the client’s ERP Foot print that comprises of various Pillar Applications and Oracle EBS/APS Suite. ASCP is implemented in Discrete and Project manufacturing environment focusing majorly on streamlining the process globally across various countries with various obligations.
Designed in-house forecasting tool, integrations with other systems.
Design and deliver the OOTB/Customized functionality that fits the process gaps
Prepare/Maintain Oracle Application setup and configuration BR100s, Design Documents MD050/CF250 for Integrations, Data Mappings and Data conversions.
Perform Business Scenarios, Test Cases, CRP and Regression testing.
Conduct User Training and Post Implementation Support
Major accomplishments includes
*Business Process Designs in supply planning area involving inventory planning methods and Advanced Planning Suite.
*Training for Master Schedulers/Material planners on material and capacity requirements planning.
*Training PAC team on CRP/load profile analysis/load leveling.
*Material health view reporting and control
*ABC Stratification based on anticipated Demand volume
*Define SOP process with oracle Demantra
*Custom Forecast Provisioning tool for Repairs
*Define system processes to bypass auto PO reschedule honoring order modifiers in Project/planning group
*OEM and Service Demantra implementation
*After Market parts shortage notifications integrations between ASCP and Depot repair
*Defined process/solution for past due order consumption logic and fiscal/shop calendar alignments in material view
*Defined shop floor order release process with Gating item reporting technique.
*Enablement of Projects based data analytics with Advanced Planning Command Center (OBIEE)
*Defined process for high volume OSP
*Defined SOP process using Demantra & ASCP with Service parts Forecasting
*implemented inbound/outbound integration profiles in Demantra with custom forecast export process with project/task level forecasts.
*leading Demantra rollouts for OE and Repair shops and Power sites
Employer
Infosys Limited
Project Type
Cummins Inc - 11.5.10 to R12 Upgrade and re-implementation - APR-2012 to MAR-2013
Modules/Env.
Oracle E-Biz Suite (11.5.10.2), R12, Material Requirement Planning (MRP), Work In Process (WIP), Bills of Materials (BOM), General Ledger (GL), Accounts Payable (AP), Accounts receivables (AR), Supplier Scheduling, Inventory (INV), Purchasing (PO), Release Management (RLM)
Roles and Responsibilities: This project mainly focuses on upgrade Oracle 11i version to R12 and re-implements one of the plants 11i environments in to R12. The objective is to bring the clients ERP architecture to merge globally into a single Oracle ERP R12 instance.
Assess the impact of customization for R12 version and assess the impact of instance consolidation
Documentation of finalized TO-BE business processes and obtaining sign-off from stakeholders
Identify Customizations required to fit Gaps in Oracle functionality
Generate business requirements documents, functional specifications for identified custom components
As a test lead involved with detailed planning of testing cycle
Align entire team to testing scope, scheduling activities and reporting test results through various phases
Employer
Infosys Limited
Project Type
Cummins Inc - Oracle - MES Integration (11.5.10.2) - JUN-2011 to APR-2012
Modules/Env.
Oracle E-Biz Suite (11.5.10.2), Material Requirement Planning (MRP), Work In Process (WIP), Bills of Materials (BOM), PLM (Mainframe)
Roles and Responsibilities: This project mainly dealt with integrating oracle applications enterprise suite (planning, BOM and WIP modules) with the Manufacturing Execution System. It involves sharing the customer demand to the production line through oracle interfaces with MES and building up the inventory upon completion of Finished products. The first rollout of this integration happened for one of the plant in China and subsequent rollouts are planned for US Plants followed by plants in Mexico.
Understand AS-IS Business Process and performed TO-BE analysis for clients in their Supply Chain functions
Documentation of finalized TO-BE business processes and obtaining sign-off from stakeholders
Identify Customizations required to fit Gaps in Oracle functionality
Generate business requirements documents, functional specifications for identified custom components
Involved in Technical Designs, Manage, and Interface and closely interact with the development & testing teams to ensure on-schedule completion of development and testing milestones and proactively assist in problem resolution
As a test lead involved with detailed planning of testing cycle
Align entire team to testing scope, scheduling activities and reporting test results through various phases
Employer
Infosys Limited
Project Type
Starbucks corp- Oracle R12 APS Implementation (11.5.10.2 & R12) - JUL-2009 to JUN-2011
Modules/Env.
Oracle E-Biz Suite (11.5.10.2), Advanced Supply Chain Planning (ASCP-R12), Oracle Global Order Promising (GOP), Oracle Bill of Material (BOM), Oracle Work in Process (WIP), Oracle Process Manufacturing (MFG)
Roles and Responsibilities:
Understand AS-IS Business Process and performed TO-BE analysis for clients in their Supply Chain functions
Documentation of finalized TO-BE business processes and obtaining sign-off from stakeholders
Identify Customizations required to fit Gaps in Oracle functionality
Generate business requirements documents, functional specifications for identified custom components
Involved in Technical Designs, Manage, and Interface and closely interact with the development & testing teams to ensure on-schedule completion of development and testing milestones and proactively assist in problem resolution
Designed Production Planning System which integrates and simulates the need of Planning functions and Executions by Oracle Transportation Management.
Lead the team based out of India to conduct Proof of Concepts, Designing Technical Components
Lead the designs for common objects or Global Objects used across various modules implemented.
Employer
Infosys Limited
Project Type
Ricoh - WMS Reverse Logistics Enhancement project (11.5.10) - FEB-2009 to JUL-2009
Modules/Env.
Oracle E-Business Suite (11.5.10) Oracle WMS
Roles and Responsibilities: The project involved analyzing the business process requirements for the client and suggesting suitable solutions. Client integrates document management technology, software and services to deliver tailored, high-value end-to-end solutions. Client had Oracle Applications 11.5.10 implemented about 2-3 years ago but had the constant need for Reverse Logistics in WMA-WMS. The activities involved in understanding business requirements, identifying gaps, providing best solutions and identified key issues.
Involved in Enhancing the Reverse Logistics scenarios in Oracle Warehouse Management System
Acted as a Project Lead for the team and trained the team members
Integrated Reverse Logistics scenario with Service Module using Install base
Employer
Infosys Limited
Project Type
Sony Semiconductors Inc - SOEM Upgrade (11.0.3 to 11.5.10) - AUG-2008 to FEB-2009
Modules/Env.
Oracle E-Business Suite (11.510) BOM, WIP, ENG, PO, AP, AR, INV and GL
Roles and Responsibilities: The project involved analyzing the business process requirements for the client and configuring systems according to the client needs. The activities included upgrading and fine tuning the existing business processes. Tasks included Solution Design, Supply Chain Modeling, and support for UAT and go-live.
Designed the Accounting Flex Field Structure Change during upgrade process
Designed a Global tool that is capable of promoting the Oracle Objects between instances.
Align entire team to testing scope, scheduling activities and reporting test results through various phases
Employer
Infosys Limited
Project Type
Sony Semiconductors Inc - 11.5.10 Upgrade and Maintenance – JUN 2005- AUG - 2008
Modules/Env.
Oracle E-Business Suite (11.5.10.2) modules. Key modules implemented and enhanced were INV, OM, PO, GL, AP, AR, BOM, Costing, ASCP and WIP
Roles and Responsibilities: This project mainly dealt with integrating oracle applications enterprise suite with the semiconductor business. Changes according to the business requirements in the system through customizations, enhancements, system and integration testing were being carried out. Activities involved Requirement Gathering for enhancements, designing, supporting existing systems by root cause analysis, coordination with Onshore Team and mentoring the team.
As onsite support analyst trouble shooting production issues and fixing them
Interact with Oracle Support team to get data fix or bug fixes with Oracle Product
Upgraded the technical components required to port to 11.5.10
Performed Application Level Performance tuning related activities.
Keep track of Automatic Remedy Systems to support incoming Service Requests and timely closure of those to meet the Service Level Agreements.
Maintain team dynamics to keep the project status on Green